HousePrecheckCheck an address

495 Sherbourne StToronto · zoning, lot size and permit records

Also 194 Wellesley St E

Residential · R (d2.0) (x665)60.8 × 117.7 m7,108 m²on Wellesley St Ecorner, also on Sherbourne St

Not a home

St James Town Community Centre

The City of Toronto's real estate inventory lists St James Town Community Centre here, on City land in City use. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Green space next doorShade, play and walks; busy parks also bring events and evening noise.
  • Permits or applications open on this parcelStill open in the City's records: 18 254692 (Proposed interior alterations to relocates a door and material renovation to existing l..., 2018, status Permit Issued). Larger work can mean noise and trucks next door; read what each one is for.
  • 7 development applications open within 300 m, up to 69 storeysNew buildings may go up around here in the next years. More change nearby than at 98% of Toronto houses.
  • Major Transit Station Area: SherbourneThe City plans more homes around the station: good for transit, and more building over time.
N50 m
60.8 m frontage117.7 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • Building permit open since 2018

    Needs a closer look

    Still open in the City's records: 18 254692 (Proposed interior alterations to relocates a door and material renovation to existing l..., 2018, status Permit Issued).

    What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.

    How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)
  • 1 by-law investigation closed in the last two years

    Good to know

    Closed files (Property Standards): 25 180179 PRS 00 IR (Property Standards, 2025).

    What it means. Someone raised an issue here and the City closed the file. Ask the seller what it was about.

    City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations
  • 2 Committee of Adjustment files on this lot

    Good to know

    2 approved. A0848/15TEY (To alter the existing two-storey Municipal Community Centre by constructing a two-store..., 2015); A0245/02TEY (Construct a 2 1/2 storey Municiapl Community Centre building containing a gross floor a..., 2002).

    What it means. Approved variances and consents stay with the property, including any conditions in the decision. They allow what was approved, not more.

    How to confirm. Decisions are in the Application Information Centre; older files are available from the Committee of Adjustment office. Details

    City of Toronto, Committee of Adjustment applications (2001 onwards)
  • 7 development applications open within 300 m

    Good to know

    7 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 69 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

19 records on file: more than at 100% of Toronto houses (median 0).

  • By-law investigation25 180179 PRS 00 IRClosed

    Property Standards

    Jun 19, 2025 · 495 SHERBOURNE ST
  • Building permit18 254692Permit Issued

    Proposed interior alterations to relocates a door and material renovation to existing library.

    Nov 13, 2018 · 495 SHERBOURNE ST
  • Building permit16 113513Closed

    Revision 01 for shoring purposes. Proposal to construct a 2 storey addition to existing community centre (Wellesley Community Centre) which includes indoor swimiing pool (3 tanks) with change rooms on the ground floor as well as multi-purpose rooms and office spaces on the second floor, partial basement is used to house mechanical equipement, and minor interior alterations to existing corridor.

    Sep 11, 2017 · 495 SHERBOURNE ST
  • Minor varianceA0848/15TEYApproved

    To alter the existing two-storey Municipal Community Centre by constructing a two-storey east side addition.

    Nov 18, 2015 · 495 SHERBOURNE ST
  • Zoning review15 108969 PSPClosed
    Jan 28, 2015 · 495 SHERBOURNE ST
  • Development application15 108969 STE 28 SAClosed

    Proposal to construct Phase 2 of the Wellesley Community Centre. A two storey addition with a pool and community facilities. In connection with previous SPA file 02-035207 STE 28 SA

    Jan 27, 2015 · 495 SHERBOURNE ST
  • Zoning review14 204134 ZPRClosed
    Aug 11, 2014 · 495 SHERBOURNE ST
  • Zoning review09 127518 ZPRClosed
    Apr 20, 2009 · 495 SHERBOURNE ST
Show 11 older records
  • Zoning review04 199060 ZPUClosed
    Dec 8, 2004 · 495 SHERBOURNE ST
  • Building permit03 101143Closed

    provide sprinkler show drawings with resepct to building permit application no. 02-153410.

    Mar 7, 2003 · 495 SHERBOURNE ST
  • Building permit02 153410Closednew building

    Build community centre building with surface parking lot. see c. of a. decision SURVEY APPROVED.

    Jan 9, 2003 · 495 SHERBOURNE ST
  • Building permit02 153415Closeddemolition

    Demolish detached ancillary building.

    Nov 7, 2002 · 495 SHERBOURNE ST
  • Building permit02 153400Cancellednew building

    Build community centre building with surface parking lot. see c. of a. decision

    Jul 12, 2002 · 495 SHERBOURNE ST
  • Building permit02 153394Cancellednew building

    Build community centre building with surface parking lot. see c. of a. decision

    Jul 12, 2002 · 495 SHERBOURNE ST
  • Minor varianceA0245/02TEYApproved

    Construct a 2 1/2 storey Municiapl Community Centre building containing a gross floor area of 6,698 square metre on the subject property. Also create a parking area for 11 parking spaces at the north east corner of the site gaining access from Bleecker Street. A loading area adjacent to the north elevation of the building is also being proposed.

    May 8, 2002 · 495 SHERBOURNE ST
  • Zoning review02 106162 PSPClosed
    Jan 28, 2002 · 495 SHERBOURNE ST
  • Zoning review02 105536 ZPRClosed
    Jan 24, 2002 · 495 SHERBOURNE ST
  • Zoning review98 026124 LTOClosed
    May 13, 1998 · 495 SHERBOURNE ST
  • Zoning review97 025955 LTOClosed
    Feb 20, 1997 · 495 SHERBOURNE ST

Check before you build

  • Site-specific exception 900.2.10(665)

    Needs a closer look

    2 site-specific rules and 1 older by-law that still prevails apply to this lot. They can override the standard rules on this page.

    Zoning By-law 569-2013, Chapter 900
Exception 900.2.10(665)Applies

These parts of the exception apply to this lot's address.

  1. Rule A

    On the lands municipally known as 495 Sherbourne St. in 1979, public parking is permitted, if the use is operated either by or on behalf of the owners of the lands municipally known in 1979 as 331 and 349 Sherbourne St.; and [TO: 438-86; 12 (1) 97]

  2. Rule B

    The lands must comply with exception 900.2.10(7).

  3. Older by-law A

    Section 12(2) 260 of former City of Toronto By-law 438-86.

By-law 569-2013, Chapter 900

Lot facts

Area
7,108 m²
Frontage
60.8 m
Depth
117.7 m
Street
Wellesley St E
Corner lot
Yes, also on Sherbourne St117.7 m along it
Public lane
None
House footprint
3,212 m²
Back yard
2.5 mhouse to rear lot line
Side yards
1.6 m and 20.5 mhouse to side lot lines
Buildings on the lot
3house, garage, sheds
Max height
30 m
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • Major Transit Station Area: Sherbourne. The lot is inside the Sherbourne Major Transit Station Area approved by the Province (Site and Area Specific Policy 601). Source
  • Downtown Plan Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
  • Downtown building setback overlay. Towers over 36 m here need extra setbacks above 24 m and 25 m between towers. Houses and other low buildings are not affected. Source
  • Zone R (d2.0) (x665) (Residential). Chapter 10, section 10.10 of the by-law. Source
  • 6 City trees in front of this lot. The City's street tree inventory lists 6 trees at this address: ash, green (38 cm), ash, green (32 cm), ash (19 cm). Diameter is the trunk at breast height. Source

Around this lot

Minor variances approved
100%4 of 4 decisions
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
5
Development applications
17

Within 300 m, last 10 years. 5 suite and multiplex permits: more than at 59% of Toronto houses (median 3). 4 variance decisions: no more than at most Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To alter the existing three-storey townhouse dwelling by constructing a new rear one-storey addition (with basement below), a side (east) basement walkout and a rear second storey rooftop deck (above the new rear addition). The existing rear one-storey addition will be demolished.

    20 ABERDEEN AVE · Nov 6, 2024 · 474 m away
  • Minor varianceApproved

    To construct a new three-storey office building with a third storey roof terrace.

    555 BLOOR ST E · Aug 30, 2023 · 477 m away
  • Minor varianceApproved

    To construct a one-storey ancillary building (detached garage) in the rear yard, abutting the laneway.

    7 ROSE AVE · Sep 7, 2022 · 427 m away
  • Minor varianceRefused

    To construct a third storey addition (enclosed staircase) to provide access to the proposed rooftop deck for Unit 2.

    50 BLEECKER ST · Jan 12, 2022 · 419 m away
  • Minor varianceApproved

    To alter the existing two-and-one-half-storey townhouse by constructing a rear third storey addition (dormer) with a rear third storey deck.

    18 LAURIER AVE · Nov 17, 2021 · 500 m away

Latest activity nearby

  • Building permit

    Proposal to undertake Exterior Renovations (AODA), including modifications to exterior parking areas, line painting, stairs (guards, handrails, and tactile warning indicators), installation of permeable pavers, and curbs to improve accessibility and bring the site into compliance with AODA requirements.

    439 SHERBOURNE ST · Nov 3, 2026 · 177 m away
  • Building permit

    Fire Damage in a High-rise Residential Building: Removing and replacing all damaged interior finishes and partition walls, balcony windows and doors, and balcony railings in the affected unit. If further investigation confirms damage to the concrete balcony slab, it will be repaired or replaced.

    666 ONTARIO ST · Oct 16, 2026 · 211 m away
  • Zoning review

    Closed

    209 WELLESLEY ST E · Oct 8, 2026 · 119 m away
  • Building permit

    Proposal for wholesale replacement of podium deck landscape finishes, wholesale waterproofing replacement, drainage system repairs, swimming pool demo, localized slab replacement, mechanical/electrical repairs

    200 WELLESLEY ST E · Sep 24, 2026 · 71 m away
  • Building permit

    Proposal to convert the existing single family residential dwelling to a multi-tenant residential dwelling, replacing spiral stair attic access with straight run interior stairs from 2nd floor to attic.

    108 BLEECKER ST · Sep 22, 2026 · 288 m away
  • Building permit

    Proposed fire alarm renewal

    275 BLEECKER ST · Sep 8, 2026 · 132 m away
  • Building permit

    Proposal for fire alarm system renewal

    325 BLEECKER ST · Aug 24, 2026 · 179 m away
  • Zoning review

    Closed

    108 BLEECKER ST · Aug 21, 2026 · 288 m away
  • Building permit

    REVISIO 3 - revised fire alarmsProposed New fire alarm closets on every floor from 2nd floor to 29th floor. New smoke control doors on both corridors of every floor from 2nd floor to 29th floor. No work on ground floor, sublevels of roof. Project work is related Fire Alarm Upgrades FSU permit 21 - 206791 FSU 00 FS that was issued October 13th 2021.

    200 WELLESLEY ST E · Aug 13, 2026 · 71 m away
  • Building permitdemolition, secondary suite

    Proposal to demolish the existing detached dwelling with 2 units.See 24 216579 STE 13 SA for future development

    5 HUNTLEY ST · Aug 7, 2026 · 284 m away

Neighbourhood: North St.James Town

About the area around the lot, not the lot itself.

Nearest station
Sherbourne Station8 min walk
Nearest TTC stop
Sherbourne St at Wellesley St East1 min walk
Nearest cycling route
Sherbourne StCycle Track, 1 min walk
Nearest traffic count
6,030 vehicles in 8 hWellesley St E / Bleecker St, 80 m away, Nov 4, 2021
Serious collisions within 500 m
82021–2026, killed or seriously injured: 0 fatal, 6 with pedestrians, 1 with cyclists
Parks
Wellesley - Magill Park2 min walk
Bleecker Parkette3 min walk
Winchester Park4 min walk

Schools within 1 km

  • OUR LADY OF LOURDES CATHOLIC ELEMENTARY SCHOOL English Separate 3 min walk
  • MONSIGNOR FRASER COLLEGE - ISABELLA CAMPUS English Separate 5 min walk
  • ROSE AVENUE JR PUBLIC SCHOOL English Public 5 min walk
  • JARVIS COLLEGIATE INSTITUTE English Public 5 min walk
  • WINCHESTER JR & SR PUBLIC SCHOOL English Public 5 min walk
  • MONSIGNOR FRASER COLLEGE - ISABELLA NORTH English Separate 6 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureNorth St.James TownMedian neighbourhood
Median household income (2020)$59,200$84,500
Households that own their home11%54%
Population (2021)18,53516,813
Homes built in 1960 or before19%29%
Homes needing major repairs10%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleNorth St.James TownCity median
Assault1281.6636.3
Robbery76.969.5
Shootings4.310.5
Auto theft85.4192.6
Theft over $5,00038.446.1
Break and enter153.8172.8
Theft from vehicles136.7188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 28, 2026, published Nov 28, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 28, 2026, published Nov 27, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 28, 2026, published Nov 27, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 28, 2026, published Nov 27, 2026
  • Multi-tenant house licences: loaded Nov 28, 2026, published Nov 27, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 28, 2026, published Nov 27, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.