HousePrecheckCheck an address

494 Mortimer AveToronto · zoning, lot size and permit records

Residential semi-detached · RS (f10.5; a325; d0.75) (x312)15.2 × 37.2 m566 m²on Mortimer Avecorner, also on Monarch Park Ave

Not a single house

A rental apartment building

The City's RentSafeTO program evaluates this building as a rental apartment building (three storeys and ten units or more). Build options for a house do not apply.

Looking at a house nearby? What this means for you

  • 3 storeys, 12 rental units, built 1965More people, cars and deliveries than a street of houses alone. A tall building also shades the lots to its north.
  • Permits or applications open on this parcelStill open in the City's records: 21 166699 (Proposal for interior alterations for the installation of fire rated doors and frames i..., 2022, status Inspection). Larger work can mean noise and trucks next door; read what each one is for.
  • No development applications within 300 m in 10 yearsA quiet stretch for new building, by the City's records.
  • City upkeep score: 83 out of 100RentSafeTO rates common areas, building systems and records. A low score can show from the street.

Want to check this building before you buy?

We are building checks for apartment buildings. Leave your email and we will tell you when it is ready.

N20 m
15.2 m frontage37.2 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • Building permit open since 2022

    Needs a closer look

    Still open in the City's records: 21 166699 (Proposal for interior alterations for the installation of fire rated doors and frames i..., 2022, status Inspection).

    What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.

    How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)
  • 2 by-law investigations closed in the last two years

    Good to know

    Closed files (Adequate Heat, Property Standards): 26 171034 000 00 IR (Adequate Heat, 2026); 26 171033 000 00 IR (Property Standards, 2026).

    What it means. Someone raised an issue here and the City closed the file. Ask the seller what it was about.

    City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations
  • Rental building evaluation: 83 out of 100

    Good to know

    The City's RentSafeTO program evaluated this rental building in 2026 (3 storeys, 12 units, built 1965).

    What it means. The score covers common areas, building systems and records. Read the evaluation details for the items that scored low.

    How to confirm. The City's RentSafeTO page has the evaluation results and any open orders for the building. Details

    City of Toronto, RentSafeTO Apartment Building Evaluations

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

3 records on file: more than at 81% of Toronto houses (median 0).

  • By-law investigation26 171034 000 00 IRClosed

    Adequate Heat

    Jun 1, 2026 · 494 MORTIMER AVE
  • By-law investigation26 171033 000 00 IRClosed

    Property Standards

    Jun 1, 2026 · 494 MORTIMER AVE
  • Building permit21 166699Inspection

    Proposal for interior alterations for the installation of fire rated doors and frames in the corridors of an existing apartment building.

    Jul 20, 2022 · 494 MORTIMER AVE

Check before you build

  • Site-specific exception 900.4.10(312)

    Needs a closer look

    2 site-specific rules apply to this lot. They can override the standard rules on this page.

    Zoning By-law 569-2013, Chapter 900
Exception 900.4.10(312)Applies

These parts of the exception apply to this lot's address.

  1. Rule A

    The minimum lot area is 185 square metres for a detached house

  2. Rule B

    The minimum lot frontage is 6.0 metres for a detached house .

1 part for other addresses
  • A On 120 Donlands Avenue, City of Toronto by-law 944-2015.
By-law 569-2013, Chapter 900

Lot facts

Area
566 m²
Frontage
15.2 m
Depth
37.2 m
Street
Mortimer Ave
Corner lot
Yes, also on Monarch Park Ave37.2 m along it
Public lane
None
House footprint
211 m²roof up to 10.3 m
Back yard
11.8 mhouse to rear lot line
Side yards
1.3 m and 3.8 mhouse to side lot lines
Buildings on the lot
1house, garage, sheds
Max height
8.5 m
Max lot coverage
35%

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • Minimum frontage 10.5 m. Frontage is about 15.2 m: meets the zone minimum. Source
  • Minimum lot area 325 m². Lot area is 566 m²: meets the minimum. Source
  • Zone RS (f10.5; a325; d0.75) (x312) (Residential Semi-Detached). Chapter 10, section 10.40 of the by-law. Source
  • 1 City tree in front of this lot. The City's street tree inventory lists 1 tree at this address: oak, red (4 cm). Diameter is the trunk at breast height. Source

Around this lot

Minor variances approved
85%34 of 40 decisions
Garden suite permits
3
Laneway suite permits
0
Multiplex permits
2
Development applications
0

Within 300 m, last 10 years. 5 suite and multiplex permits: more than at 59% of Toronto houses (median 3). 40 variance decisions: more than at 75% of Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To alter the existing two-storey semi-detached dwelling by constructing a rear one-storey addition with rear exterior stairs. The existing rear deck will be demolished.

    48 QUEENSDALE AVE · Sep 9, 2026 · 358 m away
  • Minor varianceApproved

    To legalize and maintain the building height of the existing two-storey detached dwelling (as approved by Minor Variance Decision A0187/22TEY), which was constructed beyond the limits of the authorized building permit No. 22 219682 BLD 00 NH.

    208 LINSMORE CRES · Aug 5, 2026 · 165 m away
  • Minor varianceApproved

    To alter the existing two-storey semi-detached dwelling by demolishing the existing rear one-storey addition and constructing a new rear addition (mudroom).

    394 MORTIMER AVE · May 13, 2026 · 446 m away
  • Minor varianceApproved

    To alter the existing two-storey detached dwelling by converting the integral garage into habitable space. Also, to permit a front yard parking space.

    353 MONARCH PARK AVE · May 6, 2026 · 104 m away
  • Minor varianceApproved

    To alter the existing two-storey detached dwelling by constructing a new deck with stairs and a pergola in the rear yard.

    65 LEROY AVE · Apr 15, 2026 · 306 m away

Latest activity nearby

  • Building permit

    Proposal for a rear two storey addition and interior alterations

    315 MONARCH PARK AVE · Nov 5, 2026 · 100 m away
  • Building permitsecondary suite

    New washroom and new openings on the main floor

    56 KIMBOURNE AVE · Oct 27, 2026 · 244 m away
  • Building permit

    Proposal for admin permit for work on shared party wall at 5 Kimbourne Ave. Underpinning work.

    7 KIMBOURNE AVE · Oct 16, 2026 · 276 m away
  • Building permit

    Proposal to lower the existing basement via underpinning, unfinished basement renovation. Underpinning linear 30m. Drainage 40m. Slab on Grade 50m2

    5 KIMBOURNE AVE · Oct 16, 2026 · 278 m away
  • Building permit

    INSIDE BACK WATER VALVE

    284 MONARCH PARK AVE · Oct 8, 2026 · 178 m away
  • Building permit

    Backwater Valve

    34 DURANT AVE · Oct 1, 2026 · 202 m away
  • Zoning review

    Closed

    473 SAMMON AVE · Sep 30, 2026 · 267 m away
  • Building permit

    Install backwater valve, and sump pump.

    313 MONARCH PARK AVE · Sep 14, 2026 · 107 m away
  • Building permit

    Proposal for interior alterations to existing SFD detached.

    349 MONARCH PARK AVE · Sep 8, 2026 · 89 m away
  • Building permit

    Proposal to install a backwater valve on sanitary line.

    497 SAMMON AVE · Aug 31, 2026 · 287 m away

Neighbourhood: Danforth East York

About the area around the lot, not the lot itself.

Nearest station
Greenwood Station13 min walk
Nearest TTC stop
Mortimer Ave at Roosevelt Rd1 min walk
Nearest cycling route
Monarch Park AveSharrows, 4 min walk
Nearest traffic count
5,511 vehicles in 8 hMonarch Park Ave / Mortimer Ave (East), 50 m away, Jul 29, 1999
Serious collisions within 500 m
22021–2026, killed or seriously injured: 0 fatal, 2 with pedestrians, 0 with cyclists
Parks
True Davidson Park3 min walk
Cosburn Park4 min walk
Dieppe Park5 min walk

Schools within 1 km

  • ECOLE ELEMENTAIRE LA MOSAIQUE French Public 5 min walk
  • R H MCGREGOR ELEMENTARY SCHOOL English Public 5 min walk
  • COSBURN MDL SCHOOL English Public 8 min walk
  • DIEFENBAKER ELEMENTARY SCHOOL English Public 9 min walk
  • EAST YORK COLLEGIATE INSTITUTE English Public 10 min walk
  • THE THREE HIERARCHS ACADEMY Private 11 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureDanforth East YorkMedian neighbourhood
Median household income (2020)$101,000$84,500
Households that own their home69%54%
Population (2021)17,06516,813
Homes built in 1960 or before69%29%
Homes needing major repairs8%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleDanforth East YorkCity median
Assault434.5636.3
Robbery10.969.5
Shootings10.910.5
Auto theft184.7192.6
Theft over $5,00021.746.1
Break and enter86.9172.8
Theft from vehicles239188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 28, 2026, published Nov 28, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 28, 2026, published Nov 27, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 28, 2026, published Nov 27, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 28, 2026, published Nov 27, 2026
  • Multi-tenant house licences: loaded Nov 28, 2026, published Nov 27, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 28, 2026, published Nov 27, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.