HousePrecheckCheck an address

49 Silverstone DrToronto · zoning, lot size and permit records

Residential apartment commercial · RAC (u344) (x99)69.4 × 99.7 m5,979 m²on Silverstone Dr

Not a single house

A condominium parcel

The City's property boundaries show this parcel as a condominium: the homes on it are units of a condominium corporation, which owns the land and common elements. Build options for a house do not apply; the corporation's status certificate is the document to read before an offer.

Looking at a house nearby? What this means for you

  • A condominium on 0.6 haIts owners share the land and decide together on changes; expect more cars and visitors than a house.
  • Permits or applications open on this parcelStill open in the City's records: 11 175938 (Proposed replacement of balcony guards of existing 15 storey apartment building, 2011, status Inspection). Larger work can mean noise and trucks next door; read what each one is for.
  • No development applications within 300 m in 10 yearsA quiet stretch for new building, by the City's records.
  • Major Transit Station Area: Mount OliveThe City plans more homes around the station: good for transit, and more building over time.

Want to check this condo before you buy?

We are building checks for condominiums. Leave your email and we will tell you when it is ready.

N50 m
69.4 m frontage99.7 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • TRCA regulated area (4% of lot)

    Needs a closer look

    Part of the lot is near a valley, floodplain, shoreline or wetland. Work there needs a TRCA permit and may be restricted.

    What it means. Additions, pools and new buildings in the regulated part need a TRCA permit and may be refused. Ask your insurer about flood coverage.

    How to confirm. A TRCA property inquiry letter says which policies apply ($385, at least two weeks). Details

    Ontario Regulation 41/24, TRCA Regulation Limit
  • Building permit open since 2011

    Needs a closer look

    Still open in the City's records: 11 175938 (Proposed replacement of balcony guards of existing 15 storey apartment building, 2011, status Inspection).

    What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.

    How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

3 records on file: more than at 81% of Toronto houses (median 0).

  • Building permit11 175938Inspection

    Proposed replacement of balcony guards of existing 15 storey apartment building.

    May 17, 2011 · 49 SILVERSTONE DR
  • Building permit10 233153Closed - Dormant

    to repair 102 balcony slabs

    Aug 11, 2010 · 49 SILVERSTONE DR
  • Building permit01 152245Closed - Dormant

    Parking garage repairs to apartment building.

    Jul 16, 2001 · 49 SILVERSTONE DR

Check before you build

  • Site-specific exception 900.8.10(99)

    Needs a closer look

    1 older by-law that still prevails applies to this lot. It can override the standard rules on this page.

    Zoning By-law 569-2013, Chapter 900
Exception 900.8.10(99)Applies

These parts of the exception apply to this lot's address.

  1. Older by-law A

    Former City of Etobicoke By-law No. 621.

By-law 569-2013, Chapter 900

Lot facts

Area
5,979 m²
Frontage
69.4 m
Depth
99.7 m
Street
Silverstone Dr
Corner lot
No
Public lane
None
Max height
—
Max lot coverage
40%
  • Major Transit Station Area: Mount Olive. The lot is inside the Mount Olive Major Transit Station Area approved by the Province (Site and Area Specific Policy 705). Source
  • Zone RAC (u344) (x99) (Residential Apartment Commercial). Chapter 15, section 15.20 of the by-law. Source

Around this lot

Minor variances approved
100%6 of 6 decisions
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
0
Development applications
0

Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 6 variance decisions: no more than at most Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To convert the existing swimming pool and unused storage lockers into 10 additional dwelling units, for a total of 186 residential units.

    40 STEVENSON RD · Mar 10, 2022 · 152 m away

Latest activity nearby

  • Building permit

    Proposal to replace fire pump

    40 STEVENSON RD · Jul 3, 2026 · 152 m away
  • Building permit

    Proposal for new elevator with enclosure and new ramp to stage from auditorium with new barrier free universal toilet room.

    2580 KIPLING AVE · Jun 12, 2026 · 290 m away
  • Building permit

    Proposal to restore balcony and railings.

    45 SILVERSTONE DR · Apr 9, 2026 · 75 m away
  • Building permit

    Proposal to repair of sewer line and installing of backwater valve

    72 STEVENSON RD · May 9, 2025 · 238 m away
  • Building permitnew building, new house, secondary suite

    Revision - addition of a second dwelling unit in the basement and widening of concrete walkway in front yard

    75 SILVERSTONE DR · Jan 20, 2025 · 271 m away
  • Building permitdemolition

    Proposed demolition of existing dwelling (NH application: 24 200238 BLD)

    75 SILVERSTONE DR · Nov 13, 2024 · 271 m away
  • Building permit

    Proposal for balcony and garage repairs. Replacement of all gaurdrails and local concrete repair for garage roof slab for an existing apartment buidling.

    2548 KIPLING AVE · Jul 22, 2024 · 262 m away
  • Building permit

    2 WALL SIGNS**LAZEEZ SHAWARMA**

    6200 FINCH AVE W · Jun 11, 2024 · 292 m away
  • Minor varianceApproved

    To construct a new detached dwelling with an attached garage, and a patio in the rear yard.

    75 SILVERSTONE DR · Jun 6, 2024 · 271 m away
  • Zoning review

    Closed

    75 SILVERSTONE DR · Mar 19, 2024 · 271 m away

Neighbourhood: Mount Olive-Silverstone-Jamestown

About the area around the lot, not the lot itself.

Nearest station
Stevenson Station3 min walk
Nearest TTC stop
Stevenson Station Westbound Platform3 min walk
Nearest cycling route
Kipling Ave Bicycle TrlMulti-Use Trail - Boulevard, 5 min walk
Nearest traffic count
5,369 vehicles in 14 hSilverstone Dr / Mount Olive Dr (South), 160 m away, Oct 14, 2026
Serious collisions within 500 m
32021–2026, killed or seriously injured: 1 fatal, 2 with pedestrians, 0 with cyclists
Parks
Highfield Park1 min walk
Smithfield Park6 min walk
Humberview Park8 min walk

Schools within 1 km

  • HIGHFIELD JR SCHOOL English Public 3 min walk
  • NORTH ALBION COLLEGIATE INSTITUTE English Public 5 min walk
  • ST ANDREW CATHOLIC ELEMENTARY SCHOOL English Separate 6 min walk
  • ALBION LINC English Public 7 min walk
  • AMAIRAH PRIVATE SCHOOL Private 11 min walk
  • NORTH KIPLING JR MDL SCHOOL English Public 13 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureMount Olive-Silverstone-JamestownMedian neighbourhood
Median household income (2020)$76,500$84,500
Households that own their home46%54%
Population (2021)31,34516,813
Homes built in 1960 or before14%29%
Homes needing major repairs11%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleMount Olive-Silverstone-JamestownCity median
Assault788.6636.3
Robbery107.369.5
Homicide2.95.3
Shootings20.310.5
Auto theft275.4192.6
Theft over $5,00026.146.1
Break and enter55.1172.8
Theft from vehicles130.5188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
  • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.