HousePrecheckCheck an address

49 Mutual StToronto · zoning, lot size and permit records

Commercial residential · CR 4.0 (c0.5; r4.0) SS1 (x2211)9.6 × 32.4 m307 m²on Mutual Stcorner, also on Shuter Stbacks onto Ln W Jarvis N Shuter

Not a single house

A rental apartment building

The City's RentSafeTO program evaluates this building as a rental apartment building (three storeys and ten units or more). Build options for a house do not apply.

Looking at a house nearby? What this means for you

  • 4 storeys, 20 rental units, built 1918More people, cars and deliveries than a street of houses alone. A tall building also shades the lots to its north.
  • Permits or applications open on this parcelRecent records on this lot: 25 118445 (Proposal for fire alarm system replacement throughout 4 stories building. The work also..., 2025). Larger work can mean noise and trucks next door; read what each one is for.
  • 11 development applications open within 300 m, up to 61 storeysNew buildings may go up around here in the next years. More change nearby than at 100% of Toronto houses.
  • City upkeep score: 87 out of 100RentSafeTO rates common areas, building systems and records. A low score can show from the street.
  • Major Transit Station Area: DundasThe City plans more homes around the station: good for transit, and more building over time.

Want to check this building before you buy?

We are building checks for apartment buildings. Leave your email and we will tell you when it is ready.

N10 m
9.6 m frontage32.4 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • 30 by-law investigations closed in the last two years

    Good to know

    Closed files (Adequate Heat, Order Issued Property Standards, Property Standards): 26 257524 PRS 00 IR (Property Standards, 2026); 26 255406 PRS 00 IR (Property Standards, 2026); 26 251546 PRS 00 IR (Property Standards, 2026); and 27 more.

    What it means. Someone raised an issue here and the City closed the file. Ask the seller what it was about.

    City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations
  • Work or applications in progress

    Good to know

    Recent records on this lot: 25 118445 (Proposal for fire alarm system replacement throughout 4 stories building. The work also..., 2025).

    What it means. The owner has planned or started work. Ask what it covers, whether it will be finished before closing, and who pays for what is left.

    How to confirm. Application details and decisions are in the City's Application Information Centre. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards); City of Toronto, Development Applications
  • 1 Committee of Adjustment file on this lot

    Good to know

    1 approved. A727/00TO (Alter the existing retail store and office building for use as an apartment building co..., 2001).

    What it means. Approved variances and consents stay with the property, including any conditions in the decision. They allow what was approved, not more.

    How to confirm. Decisions are in the Application Information Centre; older files are available from the Committee of Adjustment office. Details

    City of Toronto, Committee of Adjustment applications (2001 onwards)
  • 11 development applications open within 300 m

    Good to know

    11 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 61 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications
  • Rental building evaluation: 87 out of 100

    Good to know

    The City's RentSafeTO program evaluated this rental building in 2026 (4 storeys, 20 units, built 1918).

    What it means. The score covers common areas, building systems and records. Read the evaluation details for the items that scored low.

    How to confirm. The City's RentSafeTO page has the evaluation results and any open orders for the building. Details

    City of Toronto, RentSafeTO Apartment Building Evaluations

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

43 records on file: more than at 100% of Toronto houses (median 0).

  • By-law investigation26 257524 PRS 00 IRClosed

    Property Standards

    Oct 20, 2026 · 49 MUTUAL ST
  • By-law investigation26 255406 PRS 00 IRClosed

    Property Standards

    Oct 16, 2026 · 49 MUTUAL ST
  • By-law investigation26 251546 PRS 00 IRClosed

    Property Standards

    Oct 8, 2026 · 49 MUTUAL ST
  • By-law investigation26 223016 PRS 00 IRClosed

    Property Standards

    Aug 20, 2026 · 49 MUTUAL ST
  • By-law investigation26 208888 PRS 00 IRClosed

    Property Standards

    Jul 26, 2026 · 49 MUTUAL ST
  • By-law investigation26 207299 PRS 00 IRClosed

    Property Standards

    Jul 23, 2026 · 49 MUTUAL ST
  • By-law investigation26 202110 PRS 00 IRClosed

    Property Standards

    Jul 14, 2026 · 49 MUTUAL ST
  • By-law investigation26 171050 000 00 IRClosed

    Adequate Heat

    Jun 1, 2026 · 49 MUTUAL ST
Show 35 older records
  • By-law investigation26 171049 000 00 IRClosed

    Property Standards

    Jun 1, 2026 · 49 MUTUAL ST
  • By-law investigation26 147214 PRS 00 IRClosed

    Property Standards

    Apr 20, 2026 · 49 MUTUAL ST
  • By-law investigation26 132831 WST 00 IRClosed

    Waste

    Mar 22, 2026 · 49 MUTUAL ST
  • By-law investigation26 115738 HEA 00 IRClosed

    Adequate Heat

    Feb 10, 2026 · 49 MUTUAL ST
  • By-law investigation26 101625 HEA 00 IRClosed

    Adequate Heat

    Jan 7, 2026 · 49 MUTUAL ST
  • By-law investigation25 263112 PRS 00 IRClosed

    Property Standards

    Dec 5, 2025 · 49 MUTUAL ST
  • By-law investigation25 253262 PRS 00 IRClosed

    Property Standards

    Nov 13, 2025 · 49 MUTUAL ST
  • By-law investigation25 232764 PRS 00 IRClosed

    Property Standards

    Sep 30, 2025 · 49 MUTUAL ST
  • By-law investigation25 232609 PRS 00 IRClosed

    Property Standards

    Sep 29, 2025 · 49 MUTUAL ST
  • By-law investigation25 230736 PRS 00 IRClosed

    Property Standards

    Sep 25, 2025 · 49 MUTUAL ST
  • By-law investigation25 227190 PRS 00 IRClosed

    Property Standards

    Sep 18, 2025 · 49 MUTUAL ST
  • By-law investigation25 215190 PRS 00 IRClosed

    Property Standards

    Aug 24, 2025 · 49 MUTUAL ST
  • By-law investigation25 166627 PRS 00 IRClosed

    Property Standards

    May 28, 2025 · 49 MUTUAL ST
  • By-law investigation25 148271 PRS 00 IRClosed

    Property Standards

    Apr 23, 2025 · 49 MUTUAL ST
  • By-law investigation25 144381 PRS 00 IRClosed

    Property Standards

    Apr 14, 2025 · 49 MUTUAL ST
  • By-law investigation25 134148 PRS 00 IRClosed

    Property Standards

    Mar 24, 2025 · 49 MUTUAL ST
  • By-law investigation25 134146 PRS 00 IRClosed

    Property Standards

    Mar 24, 2025 · 49 MUTUAL ST
  • Building permit25 118445Permit Issued

    Proposal for fire alarm system replacement throughout 4 stories building. The work also in the basement and the roof

    Mar 18, 2025 · 49 MUTUAL ST
  • By-law investigation25 124350 PRS 00 IRClosed

    Property Standards

    Mar 4, 2025 · 49 MUTUAL ST
  • By-law investigation25 122041 PRS 00 IRClosed

    Property Standards

    Feb 26, 2025 · 49 MUTUAL ST
  • By-law investigation25 121205 HEA 00 IRClosed

    Adequate Heat

    Feb 24, 2025 · 49 MUTUAL ST
  • By-law investigation25 121204 PRS 00 IRClosed

    Property Standards

    Feb 24, 2025 · 49 MUTUAL ST
  • Building permit25 101853Cancelled

    Proposal for fire alarm system replacement throughout. 4 stories building. The work also in the basement and the roof.

    Jan 7, 2025 · 49 MUTUAL ST
  • By-law investigation24 254528 PRS 00 IVClosed

    Order Issued Property Standards: Previously finished surface(s) have marks, stains, graffiti, smoke damage, painted slogans and/or other defacements.Namely, the ceiling in the basement common r; The lighting fixture is not maintained in a clean condition.Namely, the lights at the front entrance. Of the 3 lights, 1 is burnt out and a second has the cover

    Dec 10, 2024 · 49 MUTUAL ST
  • By-law investigation24 249070 PRS 00 IRClosed

    Property Standards

    Dec 10, 2024 · 49 MUTUAL ST
  • Building permit11 247710Closed

    This is for a new shower location within the basement area of this building..

    Aug 3, 2011 · 49 MUTUAL ST
  • Building permit09 135873Closed

    Proposal for the installation of a 2" backflow preventer in the basement on the water service.

    May 19, 2009 · 49 MUTUAL ST
  • Building permit02 187290Closed

    Provide shop drawings for sprinkler system in conjunction with application under 02 - 134008

    Sep 23, 2004 · 49 MUTUAL ST
  • Building permit02 134008Closed

    build 4th storey addition. also make interior alterations throughout building to change use of building to residential building containing 20 dwelling units. SURVEY APPROVED.

    Nov 7, 2002 · 49 MUTUAL ST
  • Zoning review01 205266 PSPClosed
    Dec 27, 2001 · 49 MUTUAL ST
  • Zoning review01 194699 ZPRClosed
    Nov 14, 2001 · 49 MUTUAL ST
  • Minor varianceA727/00TOApproved with conditions

    Alter the existing retail store and office building for use as an apartment building containing 20 dwelling units. Also, construct a fourth floor addition having dimensions of 27.96 by 10.44 metres over the building.

    May 15, 2001 · 49 MUTUAL ST
  • Zoning review01 106046 000Closed
    Jan 26, 2001 · 49 MUTUAL ST
  • Zoning review00 324669 000Closed
    Aug 2, 2000 · 49 MUTUAL ST
  • Building permit99 117958Closed

    Construct 4th. fl. addition and interior alterations as per C/A decision (attached). Applicant request to close the file - see e-mail attached.

    Dec 23, 1999 · 49 MUTUAL ST

Check before you build

  • Site-specific exception 900.11.10(2211)

    Needs a closer look

    1 site-specific rule and 4 older by-laws that still prevail apply to this lot. They can override the standard rules on this page.

    Zoning By-law 569-2013, Chapter 900
Exception 900.11.10(2211)Applies

These parts of the exception apply to this lot's address.

  1. Rule A

    On the lands, a parking facility is only permitted, if: (i) it is located on the same lot as a residential building , non-residential building , or a mixed use building ; and (ii) it has no more than 125% of the number of parking spaces required to be provided for the building on the lot . [TO: 438-86; 12 (2) 80]

  2. Older by-law A

    Section 12(1) 333 of former City of Toronto By-law 438-86

  3. Older by-law B

    Section 12(2) 132 of former City of Toronto By-law 438-86

  4. Older by-law C

    Section 12(2) 216 of former City of Toronto By-law 438-86

  5. Older by-law D

    On the lands municipally known as 49 to 77 Mutual St. (odd only), Section 12 (2) 250 of former City of Toronto By-law 438-86

1 part for other addresses
  • E On the odd numbered addresses of 51A-53A Mutual St., former City of Toronto by-law 33-93.
By-law 569-2013, Chapter 900

Lot facts

Area
307 m²
Frontage
9.6 m
Depth
32.4 m
Street
Mutual St
Corner lot
Yes, also on Shuter St32.4 m along it
Public lane
Ln W Jarvis N Shuter, 15.4 m along it
House footprint
303 m²roof up to 23 m
Back yard
0 mhouse to rear lot line
Side yards
0 m and 0 mhouse to side lot lines; 0 is a shared wall
Buildings on the lot
1house, garage, sheds
Max height
—
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • Major Transit Station Area: Dundas. The lot is inside the Dundas Major Transit Station Area approved by the Province (Site and Area Specific Policy 604). Source
  • Downtown Plan Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
  • Downtown building setback overlay. Towers over 36 m here need extra setbacks above 24 m and 25 m between towers. Houses and other low buildings are not affected. Source
  • Zone CR 4.0 (c0.5; r4.0) SS1 (x2211) (Commercial Residential). Chapter 40, section 40.10 of the by-law. Source

Around this lot

Minor variances approved
97%29 of 30 decisions
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
14
Development applications
50

Within 300 m, last 10 years. 14 suite and multiplex permits: more than at 81% of Toronto houses (median 3). 30 variance decisions: more than at 63% of Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To alter the development standards (as approved under Site Specific Zoning By-law 1334-2023(OLT)) for the 44-storey mixed-use building, by increasing the overall height of the building (from 133.2 m to 134.75 m measured to the top of the mechanical penthouse) and height of the podium (from 30 m to 30.5 m), reducing the setbacks, and reducing the first storey building frontage abutting the priority retail street (Dundas Steet East). There will be a total of 542 residential dwelling units on this lot. A Site Plan Control application (File Number 21 218559 STE 13 SA) is currently under review.

    212 DUNDAS ST E · Jul 15, 2026 · 280 m away
  • Minor varianceApproved

    To construct a commercial parking lot (surface parking facility), which will contain 13 parking spaces (including one accessible parking space), with vehicular access from Harbour Light Lane. The existing two-storey non-residential building (located at 134 Jarvis Street) will be demolished.

    134 JARVIS ST · Nov 12, 2025 · 137 m away
  • Minor varianceApproved

    To alter the existing two-and-one-half-storey semi-detached building by increasing the non-residential floor space index.

    53 A MUTUAL ST · Oct 1, 2025 · 25 m away
  • Minor varianceApproved

    To alter the existing two-and-one-half-storey attached building by increasing the non-residential floor space index.

    53 MUTUAL ST · Oct 1, 2025 · 14 m away
  • Minor varianceApproved

    To alter the development standards (as approved under Site Specific Zoning By-law 1017-2022), for the 53-storey mixed-use building, by reducing the non-residential space, and the number of short-term bicycle parking spaces required on-site. There will be a total of 591 residential dwelling units on this site. This is currently under the review of Site Plan Control (File No. 21 206338 STE 13 SA).

    241 CHURCH ST · Jul 30, 2025 · 246 m away

Latest activity nearby

  • Minor variancePending

    To alter the development standards (as approved under Site Specific Zoning By-Law 690-2021 and 691-2021), for a new 57-storey mixed-use building with four-level underground parking by reducing the required long-term bicycle parking spaces. A related Site Plan Control application (under File number 20 21 152905 STE 13 SA) has been approved. There will be a total of 445 residential dwelling units on this lot, 53 vehicular parking spaces, 201 long-term bicycle parking spaces, and 45 visitor bicycle parking spaces.

    60 QUEEN ST E · Dec 16, 2026 · 240 m away
  • Building permit

    Proposal for interior alterations with mechanical, plumbing, and electrical work to suit new layout on floor 4.

    99 QUEEN ST E · Nov 20, 2026 · 245 m away
  • Building permit

    Proposal for interior alterations of existing commercial unit to a medical clinic and prescription pharmacy with Level B compounding room.

    231 DUNDAS ST E · Nov 19, 2026 · 293 m away
  • Zoning review

    Closed

    78 MUTUAL ST · Oct 28, 2026 · 89 m away
  • Building permit

    INTERIOR ALTERATIONS WITH ARCHITECTURAL, STRUCTURAL, MECHANICAL AND ELECTRICAL WORK TO SUIT NEW LAYOUT

    111 QUEEN ST E · Oct 26, 2026 · 238 m away
  • Zoning review

    Not Started

    207 JARVIS ST · Oct 21, 2026 · 81 m away
  • Building permit

    Rev 01 - Reducing 200 mm backflow preventor and express main to 150 mmProposal for replacement of existing electric fire pump and associated piping in fire pump room

    25 MUTUAL ST · Oct 19, 2026 · 119 m away
  • Zoning review

    Closed

    88 QUEEN ST E · Oct 14, 2026 · 205 m away
  • Building permit

    Proposal for replacement of existing 1-1/2" Watts 375XL reduced pressure (RP) backflow prevention device serving existing high-rise condominium building. Device located in PH mechanical room.

    181 DUNDAS ST E · Oct 8, 2026 · 182 m away
  • Building permit

    Proposal to replace existing make-up air unit and associated structural reinforcement work.

    192 JARVIS ST · Oct 2, 2026 · 126 m away

Neighbourhood: Downtown Yonge East

About the area around the lot, not the lot itself.

Nearest station
Queen Station8 min walk
Nearest TTC stop
Dundas St East at Jarvis St3 min walk
Nearest cycling route
Shuter StCycle Track, 1 min walk
Nearest traffic count
10,895 vehicles in 14 hMutual St / Shuter St, 40 m away, Oct 27, 2026
Serious collisions within 500 m
232021–2026, killed or seriously injured: 3 fatal, 16 with pedestrians, 1 with cyclists
Parks
Arena Gardens1 min walk
45 Dalhousie St Park2 min walk
Moss Park3 min walk

Schools within 1 km

  • ECOLE ELEMENTAIRE GABRIELLE ROY French Public 4 min walk
  • ST MICHAEL'S CHOIR SCHOOL - ELEMENTARY English Separate 4 min walk
  • ST MICHAEL'S CHOIR SCHOOL - SECONDARY English Separate 4 min walk
  • ST MICHAEL'S CHOIR SCHOOL - CHORAL BLDG English Separate 5 min walk
  • ST MICHAEL'S CHOIR SCHOOL - GYMNASIUM BLDG English Separate 5 min walk
  • TORONTO METROPOLITAN UNIVERSITY - SCHOOL OF INTERIOR DESIGN University 6 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureDowntown Yonge EastMedian neighbourhood
Median household income (2020)$69,500$84,500
Households that own their home36%54%
Population (2021)17,70016,813
Homes built in 1960 or before7%29%
Homes needing major repairs4%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleDowntown Yonge EastCity median
Assault2360.8636.3
Robbery143.369.5
Shootings11.910.5
Auto theft75.6192.6
Theft over $5,00099.546.1
Break and enter274.7172.8
Theft from vehicles390.1188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
  • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.