HousePrecheckCheck an address

49 Gervais DrToronto · zoning, lot size and permit records

134.1 × 64.4 m7,583 m²on Gervais Dr

Not a home

A commercial or mixed-use building

Its main building is large, outside the citywide zoning by-law: shops, offices or a mixed-use building rather than one house. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Shops, offices or a mixed buildingCustomers, deliveries and evening activity; errands within a short walk.
  • 1 development application open within 300 m, up to 12 storeysNew buildings may go up around here in the next years. More change nearby than at 68% of Toronto houses.
N50 m
134.1 m frontage64.4 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • 1 development application open within 300 m

    Good to know

    1 rezoning, site plan, subdivision or condominium application within 300 m, submitted in the last 10 years, is not closed yet, including buildings of up to 12 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

8 records on file: more than at 98% of Toronto houses (median 0).

  • Building permit23 234441Closed

    Interior alteration for a new learning facility (Commercial School) New washrooms included universal washroom upgrades to hvac and lighting to existing office areas to remain as is (new head office for spirit of math)

    Jun 14, 2024 · 49 GERVAIS DR
  • Building permit21 151664Cancellednew building

    Proposal for installation of a pre-engineered storage Building. (145.02 Sq.M)

    Aug 23, 2021 · 49 GERVAIS DR
  • Building permit21 151652Cancellednew building

    Proposal for installation of a pre-engineered storage Building(44.62 Sq.M).

    Aug 23, 2021 · 49 GERVAIS DR
  • Zoning review19 151282 ZPRClosed
    May 8, 2019 · 49 GERVAIS DR
  • Zoning review19 127532 ZPRClosed
    Mar 19, 2019 · 49 GERVAIS DR
  • Building permit16 227520Closed

    Proposal to install a backflow prevention device in an existing office building.

    Oct 6, 2016 · 49 GERVAIS DR
  • Building permit08 117681Closed

    Thomson Research Accociates inc. - Renovations

    Mar 26, 2008 · 49 GERVAIS DR
  • Building permit06 170144Closed

    New exterior cladding, windows and new exterior canopy

    Oct 4, 2006 · 49 GERVAIS DR

Check before you build

  • Zoning not in By-law 569-2013

    Needs a closer look

    This lot is not covered by the citywide zoning by-law's map. It is probably still governed by a former municipal by-law, which this tool does not read yet.

    Zoning By-law 569-2013

Lot facts

Area
7,583 m²
Frontage
134.1 m
Depth
64.4 m
Street
Gervais Dr
Corner lot
No
Public lane
None
House footprint
1,121 m²roof up to 10.5 m
Back yard
3.4 mhouse to rear lot line
Side yards
13.7 m and 84 mhouse to side lot lines
Buildings on the lot
1house, garage, sheds
Max height
—
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

    Around this lot

    Minor variances approved
    —no decisions on file
    Garden suite permits
    0
    Laneway suite permits
    0
    Multiplex permits
    0
    Development applications
    2

    Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 0 variance decisions: no more than at most Toronto houses (median 19).

    Recent variance decisions in the same zone

    • Minor varianceApproved

      The project involves converting five (5) floors of an existing office building to self-storage. This application builds upon the previous Minor Variance application approved in July of 2025, File #A0308/24NY and an ongoing Site Plan Approval application (Site Plan Application No. 24208640NNY16SA). The previously approved Minor Variance application permitted self-storage uses on lower three levels of the building. A new Minor Variance application is being filed to permit two additional floors of self-storage uses.

      90 WYNFORD DR · May 1, 2025 · 323 m away
    • Minor varianceApproved

      Proposal to convert the first three floors of the existing office building to self-storage. Floors 3 to 5 will remain as office.

      90 WYNFORD DR · Jul 18, 2024 · 323 m away
    • Minor varianceApproved

      To propose operation of a temporary garden centre in association with the existing food store between April 1st and August 1st annually.

      825 DON MILLS RD · Mar 24, 2022 · 341 m away
    • Minor varianceApproved

      To construct a Temporary Outdoor Garden Centre

      825 DON MILLS RD · May 8, 2019 · 341 m away
    • Minor varianceApproved

      To permit a temporary garden centre accessory to the existing food store located on the subject lands between April 1st and August 1st annually. The temporary garden centre will occupy 77 parking spaces, reducing the on-site parking provided to 475 parking spaces. The variances requested are for the 2015, 2016 and 2017 garden centre seasons.

      825 DON MILLS RD · Jan 22, 2015 · 341 m away

    Latest activity nearby

    • Building permit

      Proposed interior alteration for a proposed denture clinic on an existing medical unit.

      20 WYNFORD DR · Nov 6, 2026 · 156 m away
    • Building permit

      1 Overhanging Structure Sign****ONE MEDICAL PLACE*****

      20 WYNFORD DR · Oct 27, 2026 · 156 m away
    • Building permit

      Temp Tent Permit - 40x120 Ft for Congregational place, food and shelter- open sided tentInstall on Sep 09/Sep 10 2026 and taking down on Oct 18 2026

      49 WYNFORD DR · Sep 21, 2026 · 269 m away
    • Building permit

      Revision 01: fire rating & ceiling design.Proposed interior alterations (Michael Garron Hospital - Outpatient Ophthalmology Clinic Renovation) to create outpatient Cataract Surgical Centre to include pre and post operative patient care area, consolation and recovery spaces, nurse stations, utility area and staff facilities.

      20 WYNFORD DR · Sep 17, 2026 · 156 m away
    • Zoning review

      Application On Hold

      39 WYNFORD DR · Jul 14, 2026 · 244 m away
    • Development application

      Official Plan Amendment proposes a mixed-use development with four buildings with heights of 52, 41, 29, and 12 storeys. The proposed buildings will provide residential and commercial use at grade. The buildings will provide a total of 1245 residential units, being a mix of studio, 1-bedroom, 1-bedroom + den, 2-bedroom, 2-bedroom + den and 3-bedroom. A new public street will be provided, leading to below-grade parking for the buildings. The proposed development provides a total GFA of 103,488.30 square metres and a FSI of 8.43.

      39 WYNFORD DR · Apr 27, 2026 · 243 m away · City file
    • Zoning review

      Closed

      40 WYNFORD DR · Feb 19, 2026 · 136 m away
    • Building permitdemolition

      Office/ non residential demolition. Proposal of asbestos removal and complete building demolition.

      39 WYNFORD DR · Oct 31, 2025 · 244 m away
    • Building permit

      PROPOSAL FOR LANDLORD INTERIOR ALTERATIONS FOR GROUP D EXISTING OFFICE INCOMMON LABS.

      57 GERVAIS DR · Sep 9, 2025 · 68 m away
    • Building permit

      Proposal to install temporary stage - JUNE 28 TO JULY 2, 2025

      49 WYNFORD DR · Jun 25, 2025 · 269 m away

    Neighbourhood: Banbury-Don Mills

    About the area around the lot, not the lot itself.

    Nearest station
    Don Valley Station7 min walk
    Nearest TTC stop
    Wynford Dr at Sakura Way3 min walk
    Nearest cycling route
    Eglinton Ave EBike Lane, 7 min walk
    Nearest traffic count
    15,379 vehicles in 14 hWynford Dr / Gervais Dr, 210 m away, Mar 7, 2024
    Serious collisions within 500 m
    22021–2026, killed or seriously injured: 0 fatal, 1 with pedestrians, 0 with cyclists
    Parks
    Greenbelt Park9 min walk
    Ferrand Drive Park10 min walk
    Moccasin Trail Park11 min walk

    Schools within 1 km

    • BRIGHTON SCHOOL Private 13 min walk
    • GREENLAND PUBLIC SCHOOL English Public 15 min walk

    Being near a school does not mean the lot is in its catchment; check with the board.

    2021 Census

    FigureBanbury-Don MillsMedian neighbourhood
    Median household income (2020)$91,000$84,500
    Households that own their home60%54%
    Population (2021)27,15516,813
    Homes built in 1960 or before24%29%
    Homes needing major repairs4%7%

    Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

    Police-reported crime, 2025

    Per 100,000 peopleBanbury-Don MillsCity median
    Assault404.9636.3
    Robbery101.269.5
    Shootings9.210.5
    Auto theft220.9192.6
    Theft over $5,00067.546.1
    Break and enter248.5172.8
    Theft from vehicles211.7188.1

    Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

    Something here not right?

    Sources

    • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
    • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
    • Development applications: Rezoning, site plan, subdivision and condominium applications.
    • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
    • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
    • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
    • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
    • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
    • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
    • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
    • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
    • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
    • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
    • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
    • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
    • Address points: loaded Nov 22, 2026, published Nov 20, 2026
    • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
    • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
    • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
    • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
    • Committee of Adjustment open applications: loaded Nov 28, 2026, published Nov 27, 2026
    • Committee of Adjustment decisions: loaded Nov 28, 2026, published Nov 27, 2026
    • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
    • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
    • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
    • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
    • Development applications: loaded Nov 28, 2026, published Nov 28, 2026
    • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
    • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
    • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
    • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
    • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
    • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
    • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigations: loaded Nov 28, 2026, published Nov 27, 2026
    • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
    • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
    • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
    • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
    • Active building permits: loaded Nov 28, 2026, published Nov 27, 2026
    • Cleared building permits: loaded Nov 28, 2026, published Nov 27, 2026
    • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
    • Preliminary zoning reviews: loaded Nov 28, 2026, published Nov 27, 2026
    • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
    • RentSafeTO evaluations: loaded Nov 28, 2026, published Nov 27, 2026
    • Multi-tenant house licences: loaded Nov 28, 2026, published Nov 27, 2026
    • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
    • School locations: loaded Oct 14, 2026, published May 27, 2026
    • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
    • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
    • Short-term rental registrations: loaded Nov 28, 2026, published Nov 27, 2026
    • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
    • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
    • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
    • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
    • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
    • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

    Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

    Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

    Flag an error

    What is not right?

    The problem

    The records come from the City's open data; we check each flag against them. Your email is used only to answer this.