HousePrecheckCheck an address

483 Dupont StToronto · zoning, lot size and permit records

Also 479 Dupont St, 481 Dupont St, 485 Dupont St, 487 Dupont St

Commercial residential · CR 2.5 (c1.0; r2.5) SS2 (x1796)26.9 × 47.6 m1,267 m²on Dupont Stbacks onto Cooper's Hawk Lane

Not a single house

A condominium parcel

The City's property boundaries show this parcel as a condominium: the homes on it are units of a condominium corporation, which owns the land and common elements. Build options for a house do not apply; the corporation's status certificate is the document to read before an offer.

Looking at a house nearby? What this means for you

  • A condominium on 0.1 haIts owners share the land and decide together on changes; expect more cars and visitors than a house.

Want to check this condo before you buy?

We are building checks for condominiums. Leave your email and we will tell you when it is ready.

N20 m
26.9 m frontage47.6 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • 2 Committee of Adjustment files on this lot

    Good to know

    1 approved. A0028/11TEY (To request relief of indoor and outdoor amenity space requirements for the proposed six..., 2011); A0911/06TEY (To demolish the existing buildings and structures on the site and to construct a five-s..., 2007).

    What it means. Approved variances and consents stay with the property, including any conditions in the decision. They allow what was approved, not more.

    How to confirm. Decisions are in the Application Information Centre; older files are available from the Committee of Adjustment office. Details

    City of Toronto, Committee of Adjustment applications (2001 onwards)

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

13 records on file: more than at 100% of Toronto houses (median 0).

  • Building permit12 158860Closed

    Revision to 10 225797 FSUFS - Sprinkler Shop Drawing - Permit to construct new 3 storey residential live work townhouse - 23 residential unit with 1 amenity space. 1 level below grade parking with 24 spaces. See 06 194365 STE 20 SA.

    Nov 20, 2012 · 483 DUPONT ST
  • Building permit10 225797Closednew building

    Scope of revision: Interior alterations to 2 units:Unit 101: mezzanine re-configured, enlarged;Unit 104: converted from amenity space to 1 additional dwelling unit - Unit 104 - Total number of dwelling units revised to 24 dwelling units. See OMB approvalSee 06 194365 STE 20 SA.

    Aug 8, 2012 · 483 DUPONT ST
  • Minor varianceA0028/11TEYRefused

    To request relief of indoor and outdoor amenity space requirements for the proposed six storey condominium apartment.

    Apr 20, 2011 · 483 DUPONT ST
  • Building permit10 125710Closeddemolition

    Proposal to demolish existing 2 1/2 storey SFD-detached dwelling. Proposal for new block of townhouses to be submitted later. See also 10 125726 DEM.

    Apr 30, 2010 · 487 DUPONT ST
  • Building permit10 125726Closeddemolition

    Proposal to demolish existing 1 storey auto repair shop and a 2 storey repair garage, maintain vacant land in accordance with Chapter 629-24 of the TMC Proposal for new block of townhouses to be submitted later. See also 10 125710 DEM.

    Mar 22, 2010 · 483 DUPONT ST
  • Zoning review09 147600 ZPRClosed
    Jun 9, 2009 · 483 DUPONT ST
  • Minor varianceA0911/06TEYApproved

    To demolish the existing buildings and structures on the site and to construct a five-storey, plus penthouse, condominium building, containing 55 units and underground parking.

    Mar 28, 2007 · 479 DUPONT ST
  • Zoning review06 198456 PSPClosed
    Dec 18, 2006 · 483 DUPONT ST
Show 5 older records
  • Zoning review06 177049 ZPRClosed
    Sep 19, 2006 · 483 DUPONT ST
  • Zoning review06 158016 ZPRClosed
    Jul 19, 2006 · 483 DUPONT ST
  • Zoning review91 026416 LTOClosed
    May 2, 1991 · 481 DUPONT ST
  • Zoning review90 028714 LTOClosed
    Aug 10, 1990 · 481 DUPONT ST
  • Zoning review83 025470 LTOClosed
    Jan 12, 1983 · 481 DUPONT ST

Check before you build

  • Site-specific exception 900.11.10(1796)

    Needs a closer look

    4 site-specific rules and 4 older by-laws that still prevail apply to this lot. They can override the standard rules on this page.

    Zoning By-law 569-2013, Chapter 900
Exception 900.11.10(1796)Applies

These parts of the exception apply to this lot's address.

  1. Rule A

    These premises must comply with Exception 900 11.10(2). Prevailing By-laws and Prevailing Sections: (A) Section 12(1) 348 of former City of Toronto By-law 438-86

  2. Rule B

    Section 12(2) 132 of former City of Toronto By-law 438-86

  3. Rule C

    Section 12(2) 270(a) of former City of Toronto By-law 438-86

  4. Rule D

    Section 12(2) 321 of former City of Toronto By-law 438-86.

  5. Older by-law A

    These premises must comply with Exception 900 11.10(2). Prevailing By-laws and Prevailing Sections: (A) Section 12(1) 348 of former City of Toronto By-law 438-86

  6. Older by-law B

    Section 12(2) 132 of former City of Toronto By-law 438-86

  7. Older by-law C

    Section 12(2) 270(a) of former City of Toronto By-law 438-86

  8. Older by-law D

    Section 12(2) 321 of former City of Toronto By-law 438-86.

By-law 569-2013, Chapter 900

Lot facts

Area
1,267 m²
Frontage
26.9 m
Depth
47.6 m
Street
Dupont St
Corner lot
No
Public lane
Cooper's Hawk Lane, 26.7 m along it
Max height
14 m
Max lot coverage
—
  • Zone CR 2.5 (c1.0; r2.5) SS2 (x1796) (Commercial Residential). Chapter 40, section 40.10 of the by-law. Source

Around this lot

Minor variances approved
94%30 of 32 decisions
Garden suite permits
0
Laneway suite permits
3
Multiplex permits
12
Development applications
5

Within 300 m, last 10 years. 15 suite and multiplex permits: more than at 83% of Toronto houses (median 3). 32 variance decisions: more than at 65% of Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To permit the existing entertainment place of assembly (arts and cultural events) use within the existing one-storey non-residential building.

    918 BATHURST ST · Sep 23, 2026 · 483 m away
  • Minor varianceApproved

    To permit a total of one commercial unit on the main level, and three residential dwelling units (one unit on the main and second levels, one unit on the second level, and one unit on the third level) on this lot. The existing staircases along the side and rear walls, as well as the rear third level deck will be maintained and unaltered.

    1069 BATHURST ST · Apr 9, 2025 · 117 m away
  • Minor varianceApproved

    To alter the existing two-and-one-half-storey mixed-use building by constructing a three-storey addition above the rear one-storey portion of the building as well as rear terraces on the third and fourth storeys. Also, to convert one parking space within the existing integral garage into a pedestrian entrance and stairwell. There will be a total of three residential dwelling units and one parking space within this building. The existing commercial uses on the ground floor (coffee shop and coin laundry facility) will be maintained and unaltered.

    994 BATHURST ST · Nov 22, 2023 · 288 m away
  • Minor varianceApproved

    To construct a new five-storey mixed-use building containing seven dwelling units with basement and ground floor retail.

    1079 BATHURST ST · May 30, 2019 · 108 m away
  • Minor varianceApproved

    To alter the approved building permit plans issued under permit 16 26098 BLD for alterations to an existing two-storey mixed-use building by adding a window on the south side of the building.

    1086 BATHURST ST · Jan 27, 2017 · 58 m away

Latest activity nearby

  • Minor variancePending

    To construct a new three-storey detached building (houseplex) with front and rear basement walkouts, front and rear ground floor porches with stairs, side (east) yard entrances on the ground floor, and front and rear second and third storey balconies. The second storey will be cantilevered at the east side of the main building. Also, to construct a new rear two-storey detached ancillary building containing one laneway suite with a basement level (storage), and a cantilevered second storey (south) with one surface parking space below, abutting the laneway. There will be a total of seven residential dwelling units on this lot (two units within the basement, two units on the ground floor, and two units occupying the second and third storeys of the main building and one unit within the ancillary building containing a laneway suite).

    541 DUPONT ST · Dec 16, 2026 · 210 m away
  • Building permit

    Commercial vehicle impact repairs

    468 DUPONT ST · Nov 20, 2026 · 130 m away
  • Zoning review

    Not Started

    843 PALMERSTON AVE · Nov 10, 2026 · 141 m away
  • Building permit

    Proposal for structural impact damage restoration.

    472 DUPONT ST · Nov 3, 2026 · 115 m away
  • Building permit

    Party wall admin permit related to 25-119818 BLD 00 SR.

    552 DUPONT ST · Oct 23, 2026 · 188 m away
  • Zoning review

    Cancelled

    420 DUPONT ST · Oct 19, 2026 · 271 m away
  • Zoning review

    Closed

    430 DUPONT ST · Oct 6, 2026 · 253 m away
  • Building permit

    Proposal for Party Wall Admin related to 871 Palmerston Ave.

    869 PALMERSTON AVE · Sep 28, 2026 · 108 m away
  • Building permit

    Proposal for a second floor addition and interior alterations

    871 PALMERSTON AVE · Sep 28, 2026 · 97 m away
  • Minor variancePending

    Cancelled

    541 DUPONT ST · Sep 25, 2026 · 210 m away

Neighbourhood: Annex

About the area around the lot, not the lot itself.

Nearest station
Dupont Station11 min walk
Nearest TTC stop
Dupont St at Bathurst St1 min walk
Nearest cycling route
Palmerston AveSharrows, 2 min walk
Nearest traffic count
35,280 vehicles in 14 hDupont St / Bathurst St, 90 m away, Jul 3, 2025
Serious collisions within 500 m
32021–2026, killed or seriously injured: 0 fatal, 2 with pedestrians, 0 with cyclists
Parks
Vermont Square Park2 min walk
Cawthra Playground6 min walk
The Tollkeeper's Park8 min walk

Schools within 1 km

  • ROYAL ST GEORGES COLLEGE SCHOOL - ADVANCEMENT Private 8 min walk
  • PALMERSTON AVENUE JR PUBLIC SCHOOL English Public 8 min walk
  • GEORGE BROWN COLLEGE - CASA LOMA CAMPUS College 8 min walk
  • ROYAL ST GEORGE'S COLLEGE SCHOOL - JR SCHOOL Private 8 min walk
  • ROYAL ST GEORGES COLLEGE SCHOOL - SEE HOUSE Private 9 min walk
  • ROYAL ST GEORGES COLLEGE SCHOOL - MAIN ADDRESS Private 9 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureAnnexMedian neighbourhood
Median household income (2020)$85,000$84,500
Households that own their home41%54%
Population (2021)29,30016,813
Homes built in 1960 or before40%29%
Homes needing major repairs6%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleAnnexCity median
Assault1080.9636.3
Robbery80.569.5
Homicide5.25.3
Shootings5.210.5
Auto theft116.9192.6
Theft over $5,000114.346.1
Break and enter387.1172.8
Theft from vehicles220.9188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 28, 2026, published Nov 28, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 28, 2026, published Nov 27, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 28, 2026, published Nov 27, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 28, 2026, published Nov 27, 2026
  • Multi-tenant house licences: loaded Nov 28, 2026, published Nov 27, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 28, 2026, published Nov 27, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.