HousePrecheckCheck an address

480 Progress AveToronto · zoning, lot size and permit records

Also 470 Progress Ave

≈ 139.7 × 143.8 m16,321 m²on Progress Ave

Not a home

A commercial or mixed-use building

Its main building is large, outside the citywide zoning by-law: shops, offices or a mixed-use building rather than one house. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Shops, offices or a mixed buildingCustomers, deliveries and evening activity; errands within a short walk.
N50 m
≈ 139.7 m frontage≈ 143.8 m deepirregular lot, estimated

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • 1 Committee of Adjustment file on this lot

    Good to know

    1 approved. A178/04SC (To permit two vehicle service bays for the installation of audio, video, security and s..., 2004).

    What it means. Approved variances and consents stay with the property, including any conditions in the decision. They allow what was approved, not more.

    How to confirm. Decisions are in the Application Information Centre; older files are available from the Committee of Adjustment office. Details

    City of Toronto, Committee of Adjustment applications (2001 onwards)

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

18 records on file: more than at 100% of Toronto houses (median 0).

  • Development application21 206885 ESC 21 OZClosed

    The application aims to establish a long-term planning framework for 300 Borough Drive, 1755 Brimley Road, 400-580 Progress Avenue and 350 Town Centre Court.

    Sep 1, 2021 · 470 PROGRESS AVE · City file
  • Building permit19 253789Closed

    In conjunction with this property an application has been made for four illuminated wall signs to display static copy at the first floor on the north, east, west and south elevations.****CIBC****

    May 5, 2020 · 480 PROGRESS AVE
  • Building permit17 189090Closed

    Interior alterations *CIBC*

    Jul 18, 2017 · 480 PROGRESS AVE
  • Building permit17 134774Closed

    Proposed interior renovation of existing Best Buy store.

    May 12, 2017 · 480 PROGRESS AVE
  • Building permit14 202389Closed

    To erect and display twelve wall signs, one of which is non-illuminated, on the southerly, westerly, easterly & northerly elevation of building. **CIBC**

    Oct 23, 2014 · 480 PROGRESS AVE
  • Building permit14 158879Closed

    Proposed tenant fit-out for "CIBC"

    Jun 19, 2014 · 480 PROGRESS AVE
  • Building permit13 268565Closednew building

    One storey CIBC Building (shell) with drive-thru facility

    Jun 19, 2014 · 480 PROGRESS AVE
  • Zoning review13 252257 PSPClosed
    Oct 17, 2013 · 480 PROGRESS AVE
Show 10 older records
  • Development application13 242159 ESC 38 SAClosed

    Amendment to previously approved site plan to permit a one storey commercial building (CIBC BANK BRANCH) and drive-thru facility, with a total floor area of 856 square metres.

    Sep 26, 2013 · 480 PROGRESS AVE
  • Building permit09 172733Closeddemolition

    demolish temporary sales trailer for Centro Condominium

    Oct 16, 2009 · 470 PROGRESS AVE
  • Zoning review09 167745 LTOClosed
    Sep 11, 2009 · 480 PROGRESS AVE
  • Zoning review09 146879 LTOClosed
    Jun 8, 2009 · 480 PROGRESS AVE
  • Zoning review07 135457 PSPClosed
    Apr 2, 2007 · 470 PROGRESS AVE
  • Building permit04 188886Closed

    SITE SERVICES AND SURFACE WORKS

    Nov 19, 2004 · 470 PROGRESS AVE
  • Building permit04 132902Closednew building

    NEW 1 STOREY RETAIL BUILDING "BEST BUY"

    Nov 2, 2004 · 480 PROGRESS AVE
  • Building permit04 171920Cancelled

    SITE SERVICES AND SURFACE WORKS

    Sep 7, 2004 · 470 PROGRESS AVE
  • Minor varianceA178/04SCApproved

    To permit two vehicle service bays for the installation of audio, video, security and similar automotive electronic systems associated with a "Best Buy" retail store.

    Aug 25, 2004 · 480 PROGRESS AVE
  • Zoning review04 125684 PSPClosed
    Apr 16, 2004 · 480 PROGRESS AVE

Check before you build

  • Zoning not in By-law 569-2013

    Needs a closer look

    This lot is not covered by the citywide zoning by-law's map. It is probably still governed by a former municipal by-law, which this tool does not read yet.

    Zoning By-law 569-2013

Lot facts

Area
16,321 m²
Frontage
139.7 mestimated, irregular lot
Depth
143.8 mestimated, irregular lot
Street
Progress Ave
Corner lot
No
Public lane
None
House footprint
3,448 m²roof up to 12.7 m
Back yard
37 mhouse to rear lot line
Side yards
11.1 m and 79.3 mhouse to side lot lines
Buildings on the lot
2house, garage, sheds
Max height
—
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

    Around this lot

    Minor variances approved
    —no decisions on file
    Garden suite permits
    0
    Laneway suite permits
    0
    Multiplex permits
    0
    Development applications
    1

    Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 0 variance decisions: no more than at most Toronto houses (median 19).

    Recent variance decisions in the same zone

    • Minor varianceApproved

      To permit the use of an education and training facility.

      300 BOROUGH DR · Aug 23, 2023 · 344 m away
    • Minor varianceApproved

      Variances to reduce required parking for proposed indoor miniature golf & to permit accessory electronic & arcade games

      410 PROGRESS AVE · May 10, 2019 · 354 m away
    • Minor varianceApproved

      To demolish a portion of the existing above-grade parking deck structure on the north side of the Scarborough Town Centre mall adjacent to Progress Avenue.

      300 BOROUGH DR · Jun 21, 2018 · 344 m away
    • Minor varianceApproved

      The applicant is seeking relief from the provisions of the Zoning By-law to locate an office use (retailing legal services known as Axess Law Corporation) inside the existing Walmart Store located at 300 Borough Drive.

      300 BOROUGH DR · Mar 22, 2013 · 344 m away
    • Minor varianceApproved

      To construct two single storey free-standing retail buildings, identified as Buildings A and B on the attached plan.

      500 PROGRESS AVE · Sep 20, 2011 · 141 m away

    Latest activity nearby

    • Building permit

      REV: Proposal for upgradation of the the north exit corridor to match the latest CRU (P07) engineering drawings:- Added rated vestibule at exit corridor- Replaced single doors with double doors.INTERIOR ALTERATIONS TO THE EXISTING REAL CANADIAN SUPERSTORE - REDUCE SIZE OF FOOD STORE AND CREATE A NEW CRU SPACE, PARTIAL FLOORING REMOVAL (PATCH/REPLACE AREAS), NEW / REVISED PARTITIONS FOR: PHARMACY RELOCATION

      1755 BRIMLEY RD · Oct 30, 2026 · 246 m away
    • Building permit

      Proposal for interior alterations to an existing retail store for new tenant - Real Canadian Superstore

      1755 BRIMLEY RD · Aug 24, 2026 · 246 m away
    • Building permit

      A proposal to erect and display 6 Wall Signs all displaying static copy.***SUPERSTORE***

      1755 BRIMLEY RD · Jul 21, 2026 · 246 m away
    • Building permit

      Proposal construct 2 temporary tent structures for circus events. Set up August 4, 2026, tear down Aug 17, 2026.

      500 PROGRESS AVE · Jul 8, 2026 · 141 m away
    • Building permit

      Please refer to attached Alternate Solution Letter to the City Scarborough. PROVISION OF SANITARY FACILITIES: The temporary structure event will be provided with 20 water closets (11 female, 9 male).

      500 PROGRESS AVE · Jun 11, 2026 · 141 m away
    • Building permit

      To erect a temporary tent for the garden centre from April 15 to July 15, 2026.

      1755 BRIMLEY RD · Mar 9, 2026 · 246 m away
    • Building permit

      Proposal to install 2 temporary tents in 500 Progress Ave for "Paranormal Cirque" from October 10, 2025 to October 13, 2025

      500 PROGRESS AVE · Oct 6, 2025 · 141 m away
    • Building permit

      To erect a temporary tent for the garden centre from April 15 to July 15, 2025.

      1755 BRIMLEY RD · Apr 8, 2025 · 246 m away
    • Building permit

      1 Overhanging structure sign"Piper Arms""Piper Arms"

      520 PROGRESS AVE · Mar 4, 2025 · 269 m away
    • Building permit

      1 Overhanging structure sign"Piper Arms"

      520 PROGRESS AVE · Feb 11, 2025 · 269 m away

    Neighbourhood: Bendale-Glen Andrew

    About the area around the lot, not the lot itself.

    Nearest station
    Scarborough Centre Station9 min walk
    Nearest TTC stop
    Walmart Scarborough Town Centre3 min walk
    Nearest cycling route
    Brimley RdMulti-Use Trail - Boulevard, 5 min walk
    Nearest traffic count
    13,412 vehicles in 8 hHwy 401 Collectors E Progress Ave Ramp / Progress Ave, 110 m away, Dec 5, 2023
    Serious collisions within 500 m
    12021–2026, killed or seriously injured: 0 fatal, 0 with pedestrians, 0 with cyclists
    Parks
    Snowhill Park3 min walk
    McDairmid Woods Park7 min walk
    Farquharson Park11 min walk

    Schools within 1 km

    • MAC AL-FURQAN SCHOOL Private 11 min walk
    • C D FARQUHARSON JR PUBLIC SCHOOL English Public 13 min walk
    • TOWN CENTRE LINC English Public 13 min walk
    • MADINATUL ULOOM ISLAMIC ACADEMY & OXFORD COLLEGE & FH INTERNATIONAL Private 14 min walk
    • CANADIAN TAMIL ACADEMY Private 14 min walk
    • AL HAADI SCHOOL Private 16 min walk

    Being near a school does not mean the lot is in its catchment; check with the board.

    2021 Census

    FigureBendale-Glen AndrewMedian neighbourhood
    Median household income (2020)$74,500$84,500
    Households that own their home61%54%
    Population (2021)18,68516,813
    Homes built in 1960 or before24%29%
    Homes needing major repairs5%7%

    Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

    Police-reported crime, 2025

    Per 100,000 peopleBendale-Glen AndrewCity median
    Assault871.8636.3
    Robbery222.869.5
    Homicide9.75.3
    Shootings14.510.5
    Auto theft464.9192.6
    Theft over $5,00082.346.1
    Break and enter145.3172.8
    Theft from vehicles290.6188.1

    Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

    Something here not right?

    Sources

    • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
    • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
    • Development applications: Rezoning, site plan, subdivision and condominium applications.
    • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
    • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
    • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
    • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
    • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
    • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
    • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
    • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
    • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
    • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
    • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
    • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
    • Address points: loaded Nov 22, 2026, published Nov 20, 2026
    • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
    • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
    • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
    • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
    • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
    • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
    • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
    • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
    • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
    • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
    • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
    • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
    • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
    • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
    • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
    • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
    • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
    • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
    • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
    • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
    • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
    • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
    • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
    • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
    • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
    • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
    • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
    • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
    • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
    • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
    • School locations: loaded Oct 14, 2026, published May 27, 2026
    • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
    • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
    • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
    • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
    • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
    • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
    • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
    • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
    • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

    Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

    Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

    Flag an error

    What is not right?

    The problem

    The records come from the City's open data; we check each flag against them. Your email is used only to answer this.