HousePrecheckCheck an address

480 Lake Shore Blvd EToronto · zoning, lot size and permit records

Also 520 Lake Shore Blvd E

≈ 154.1 × 539.6 m54,681 m²on Lake Shore Blvd E

Not a home

Former Gulf Oil Site - Prop C - East Part

The City of Toronto's real estate inventory lists Former Gulf Oil Site - Prop C - East Part here, on City land in City use. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • City of Toronto landThe City decides what happens here; ask it about any plans.
  • 2 development applications open within 300 m, up to 28 storeysNew buildings may go up around here in the next years. More change nearby than at 91% of Toronto houses.
N50 m
≈ 154.1 m frontage≈ 539.6 m deepirregular lot, estimated

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • TRCA regulated area (76% of lot)

    Needs a closer look

    Part of the lot is near a valley, floodplain, shoreline or wetland. Work there needs a TRCA permit and may be restricted.

    What it means. Additions, pools and new buildings in the regulated part need a TRCA permit and may be refused. Ask your insurer about flood coverage.

    How to confirm. A TRCA property inquiry letter says which policies apply ($385, at least two weeks). Details

    Ontario Regulation 41/24, TRCA Regulation Limit
  • Natural Heritage System (99% of lot)

    Good to know

    Part of the lot is in the Natural Heritage System shown on Official Plan Map 9.

    What it means. New buildings or additions in that part need a natural heritage impact study.

    How to confirm. City Planning confirms the policies that apply. Details

    City of Toronto Official Plan, Map 9
  • 2 development applications open within 300 m

    Good to know

    2 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 28 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

14 records on file: more than at 100% of Toronto houses (median 0).

  • Building permit19 126083Closed

    Proposal to construct 4 temporary tents on existing vacant lot from March 15, 2019 to January 30, 2021Purpose of the tents is for the fabrication of bridge parts..

    Jan 31, 2020 · 520 LAKE SHORE BLVD E
  • Building permit19 126095Closed

    Proposal for a site servicing permit in conjunction with temporary tent permit, 19 126083 TPS.

    Jan 16, 2020 · 520 LAKE SHORE BLVD E
  • Building permit20 105149Approved

    Alternative solution for combustible materials for roofing & cladding for a temporay precast manufacture building( Gardiner Exp)

    Jan 15, 2020 · 520 LAKE SHORE BLVD E
  • Building permit18 263783Closeddemolition

    Proposed demolition of 2 auto repair garages on existing property.

    Jan 16, 2019 · 520 LAKE SHORE BLVD E
  • Building permit18 137726Closednew building

    Proposal to construct a new storm water quality facility building to house stormwater management equipments for the West Don Lands, East Bayfront and future North Keating subdivisions. "Cherry St Stormwater Facility"

    Oct 5, 2018 · 480 LAKE SHORE BLVD E
  • Building permit15 151397Closed

    Installation of one backflow prevention device - Gulf Site A&M Disposal Services - Magic Bus Company/ Star Coach Service

    Jun 1, 2015 · 520 LAKE SHORE BLVD E
  • Zoning review14 229580 ZPRClosed
    Sep 29, 2014 · 480 LAKE SHORE BLVD E
  • Zoning review12 111848 ZPRClosed
    Jan 25, 2012 · 480 LAKE SHORE BLVD E
Show 6 older records
  • Building permit10 158139Closeddemolition

    Permit to demolish existing storage warehouse - 1 storey - (CONVENIENCE ADDRESS IS 520 LAKESHORE BLVD E) The building is attached on the West side to a 2 storey warehouse that is being maintained.

    Apr 26, 2010 · 480 LAKE SHORE BLVD E
  • Zoning review08 230125 LPRClosed
    Dec 16, 2008 · 480 LAKE SHORE BLVD E
  • Zoning review03 101360 LTOClosed
    Jan 10, 2003 · 480 LAKE SHORE BLVD E
  • Zoning review84 026966 LTOClosed
    Nov 8, 1984 · 480 LAKE SHORE BLVD E
  • Zoning review83 025766 LTOClosed
    Apr 5, 1983 · 480 LAKE SHORE BLVD E
  • Zoning review81 030402 LTOClosed
    Jun 16, 1981 · 480 LAKE SHORE BLVD E

Check before you build

  • Zoning not in By-law 569-2013

    Needs a closer look

    This lot is not covered by the citywide zoning by-law's map. It is probably still governed by a former municipal by-law, which this tool does not read yet.

    Zoning By-law 569-2013

Lot facts

Area
54,681 m²
Frontage
154.1 mestimated, irregular lot
Depth
539.6 mestimated, irregular lot
Street
Lake Shore Blvd E
Corner lot
No
Public lane
None
House footprint
592 m²roof up to 7.5 m
Back yard
266.1 mhouse to rear lot line
Side yards
32.3 m and 94.9 mhouse to side lot lines
Buildings on the lot
1house, garage, sheds
Max height
—
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

    Around this lot

    Minor variances approved
    —no decisions on file
    Garden suite permits
    0
    Laneway suite permits
    0
    Multiplex permits
    0
    Development applications
    7

    Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 0 variance decisions: no more than at most Toronto houses (median 19).

    Recent variance decisions in the same zone

    • Minor varianceApproved

      To permit a place of amusement use for the purpose of axe throwing on the ground floor of the existing two-storey industrial building.

      16 MUNITION ST · Aug 9, 2023 · 315 m away
    • Minor varianceApproved

      To construct a phased mixed-use Indigenous Hub. The first phase will consist of a four-storey community health centre (Phase A). The second phase will consist of a four-storey training, education and employment centre and a mixed-use building featuring a 13-storey residential condominium tower with retail at grade, an 11-storey residential rental tower and an eight-storey residential podium. The existing three-storey heritage building will be maintained for non-residential uses (Phase B).

      425 CHERRY ST · Oct 21, 2020 · 444 m away
    • Minor varianceApproved

      To alter the existing 11-storey mixed-use building approved under Site-Specific By-law 4-2011 by converting a portion of the first storey from a retail use to a dental clinic.

      457 FRONT ST E · Feb 5, 2020 · 426 m away
    • Minor varianceApproved

      To construct a new mixed-use building consisting of three towers and podiums with a shared below grade garage. A total of 761 rental housing units are proposed, with 238 units for affordable rental housing.

      391 CHERRY ST · Jun 26, 2019 · 323 m away
    • Minor varianceApproved

      To modify the redevelopment plan for Phase 2 of the West Don Lands approved by Site-specific By-law 4-2011 by constructing a new mixed-use building, which will exceed the maximum permitted heights, comprised of a twelve-storey tower on Front Street, a nine-storey tower on Mill Street, and two five-storey podiums connecting the two building towers.

      475 FRONT ST E · Aug 29, 2018 · 386 m away

    Latest activity nearby

    • Building permit

      REV: Proposed revision to address redeisgn of the noise wallConstruction of a noise wall barrier along the Metrolinx Railway corridor, south of Mill St, between Bayview Ave and Tannery Road.

      191 MILL ST · May 27, 2026 · 256 m away
    • Development application

      Draft Plan of Subdivision to create fourteen (14) development blocks of varying sizes and configurations, and nine (9) additional blocks to facilitate new segments of the water's edge promenade and dockwall as well as a variety of publicly-accessible open spaces enable development in Ookwemin Minising.

      62 VILLIERS ST · May 15, 2026 · 230 m away · City file
    • Development application

      Proposed technical amendment to the Former City of Toronto Zoning By-law 438-86 to permit a range of non-residential meanwhile uses, such as community, cultural, recreational, sport, entertainment and retail uses, on an interim basis while restricting certain currently permitted industrial uses. The application proposes to amend the current in-force zoning before a pending OLT resolution for a comprehensive rezoning for the site is in force.

      65 OOKWEMIN ST · May 13, 2026 · 162 m away · City file
    • Development application

      Combined Official Plan & Zoning By-law Amendment for four development blocks consisting of 14 mixed-use buildings. Tower heights range from 28-storeys to 53-storeys. The proposed total gross floor area ("GFA") is 325,000 m2 (9.31 FSI for the net site area) of which 311,401 m2 will be residential GFA and 13,599 m2 of non-residential GAF and a total of 4,994 new dwelling units.A revised draft plan of subdivision is likely required in a future application.

      324 CHERRY ST · Jun 10, 2025 · 233 m away · City file
    • Building permitnew building

      Construction of an Emergency Services Building (ESB) along the Metrolinx Railway corridor, south of Mill St, between Bayview Ave and Tannery Road.

      191 MILL ST · Oct 9, 2024 · 256 m away
    • Building permit

      HVAC - Construction of a temporary site office for the Lower Don Enabling Works 3 project located at 191 Mill St. This temporary site office will be comprised of mobile site trailers. The temporary site office is required to support the construction project that will be on going for the next 5 years.

      191 MILL ST · Aug 16, 2024 · 256 m away
    • Building permit

      Revision 02 - Electrical revisions. Revision 01 - Change to the interior layout.NEW CAFE/BAKERY suite in NEW BUILDING

      125 MILL ST · Jun 26, 2024 · 296 m away
    • Zoning review

      Closed

      125 MILL ST · Jun 24, 2024 · 296 m away
    • Zoning review

      Cancelled

      125 MILL ST · May 21, 2024 · 296 m away
    • Zoning review

      Closed

      125 MILL ST · Sep 13, 2023 · 296 m away

    Neighbourhood: St Lawrence-East Bayfront-The Islands

    About the area around the lot, not the lot itself.

    Nearest station
    King Station33 min walk
    Nearest TTC stop
    Cherry St at Lake Shore Blvd East5 min walk
    Nearest cycling route
    Lower Don River TrlMulti-Use Trail, 1 min walk
    Nearest traffic count
    10,659 vehicles in 8 hLake Shore Blvd E / Lower Don River Trl (North), 260 m away, Nov 30, 2009
    Serious collisions within 500 m
    72021–2026, killed or seriously injured: 2 fatal, 0 with pedestrians, 1 with cyclists
    Parks
    Corktown Common4 min walk
    Biidaasige Park6 min walk
    Trca Lands ( 51)6 min walk

    Schools within 1 km

    • GEORGE BROWN COLLEGE - YOUNG CENTRE FOR THE PERFORMING ARTS College 6 min walk
    • VOICE INTEGRATIVE PRIVATE SCHOOL Private 9 min walk
    • INGLENOOK COMMUNITY SCHOOL English Public 11 min walk
    • ST PAUL CATHOLIC ELEMENTARY SCHOOL English Separate 15 min walk
    • MARKET LANE JR & SR PUBLIC SCHOOL English Public 16 min walk

    Being near a school does not mean the lot is in its catchment; check with the board.

    2021 Census

    FigureSt Lawrence-East Bayfront-The IslandsMedian neighbourhood
    Median household income (2020)$87,000$84,500
    Households that own their home40%54%
    Population (2021)31,28516,813
    Homes built in 1960 or before3%29%
    Homes needing major repairs3%7%

    Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

    Police-reported crime, 2025

    Per 100,000 peopleSt Lawrence-East Bayfront-The IslandsCity median
    Assault1059.7636.3
    Robbery96.369.5
    Shootings4.510.5
    Auto theft24.6192.6
    Theft over $5,00078.446.1
    Break and enter163.5172.8
    Theft from vehicles163.5188.1

    Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

    Something here not right?

    Sources

    • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
    • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
    • Development applications: Rezoning, site plan, subdivision and condominium applications.
    • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
    • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
    • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
    • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
    • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
    • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
    • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
    • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
    • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
    • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
    • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
    • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
    • Address points: loaded Nov 29, 2026, published Nov 27, 2026
    • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
    • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
    • Street centrelines: loaded Nov 29, 2026, published Nov 27, 2026
    • City-owned land: loaded Nov 29, 2026, published Nov 23, 2026
    • Committee of Adjustment open applications: loaded Nov 29, 2026, published Nov 28, 2026
    • Committee of Adjustment decisions: loaded Nov 29, 2026, published Nov 28, 2026
    • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
    • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 29, 2026, published Nov 28, 2026
    • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
    • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
    • Development applications: loaded Nov 29, 2026, published Nov 29, 2026
    • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
    • Green spaces: loaded Nov 29, 2026, published Nov 24, 2026
    • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
    • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
    • Official Plan Amendment 720 heritage list: loaded Nov 29, 2026, published Nov 23, 2026
    • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
    • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigations: loaded Nov 29, 2026, published Nov 28, 2026
    • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
    • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
    • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
    • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
    • Active building permits: loaded Nov 29, 2026, published Nov 28, 2026
    • Cleared building permits: loaded Nov 29, 2026, published Nov 28, 2026
    • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
    • Preliminary zoning reviews: loaded Nov 29, 2026, published Nov 28, 2026
    • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
    • RentSafeTO evaluations: loaded Nov 29, 2026, published Nov 28, 2026
    • Multi-tenant house licences: loaded Nov 29, 2026, published Nov 28, 2026
    • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
    • School locations: loaded Oct 14, 2026, published May 27, 2026
    • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
    • Street trees: loaded Nov 29, 2026, published Nov 23, 2026
    • Short-term rental registrations: loaded Nov 29, 2026, published Nov 28, 2026
    • Traffic counts at intersections: loaded Nov 29, 2026, published Nov 28, 2026
    • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
    • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
    • Zoning by-law: loaded Nov 29, 2026, published Nov 23, 2026
    • Lot coverage overlay: loaded Nov 29, 2026, published Nov 23, 2026
    • Height overlay: loaded Nov 29, 2026, published Nov 23, 2026
    • Parking zone overlay: loaded Nov 29, 2026, published Nov 23, 2026
    • Policy area overlay: loaded Nov 29, 2026, published Nov 23, 2026
    • Priority retail streets: loaded Nov 29, 2026, published Nov 23, 2026
    • Rooming house overlay: loaded Nov 29, 2026, published Nov 23, 2026
    • Zoning setbacks: loaded Nov 29, 2026, published Nov 23, 2026

    Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

    Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

    Flag an error

    What is not right?

    The problem

    The records come from the City's open data; we check each flag against them. Your email is used only to answer this.