HousePrecheckCheck an address

48 Britain StToronto · zoning, lot size and permit records

Commercial residential · CR 4.5 (c2.0; r4.0) SS2 (x333)12.2 × 22.5 m254 m²on Britain Stbacks onto Stonecutters Lane

Not a home

Land without a building

The City's 3D model of buildings shows nothing standing on this parcel: vacant land, a parking lot or a yard. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Empty land or parkingWhat gets built here matters most to the street: read the applications on it and around it below.
  • 11 development applications open within 300 m, up to 43 storeysNew buildings may go up around here in the next years. More change nearby than at 99% of Toronto houses.
  • Major Transit Station Area: CorktownThe City plans more homes around the station: good for transit, and more building over time.
N10 m
12.2 m frontage22.5 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • 11 development applications open within 300 m

    Good to know

    11 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 43 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

No permits, applications or Committee of Adjustment files on this lot in the City's open records.

Check before you build

  • Site-specific exception 900.11.10(333)

    Needs a closer look

    6 site-specific rules and 2 older by-laws that still prevail apply to this lot. They can override the standard rules on this page.

    Zoning By-law 569-2013, Chapter 900
Exception 900.11.10(333)Applies

These parts of the exception apply to this lot's address.

  1. Rule A

    In the CR zone, a drive-through facility is not permitted.

  2. Rule E

    These premises must comply with Exception 900.11.10(2)

  3. Rule F

    Despite regulation 40.5.40.10(4), equipment and structures on the roof of a building may not exceed the permitted maximum height

  4. Rule G

    On a lot with a lot line that abuts Britain Street, no building or structure may penetrate a 45 degree angular plane projected over the lot along the lot line abutting Britain Street, starting at a height of 16 metres above the average elevation of the ground at the front lot line of abutting lots fronting Queen Street East.

  5. Rule H

    If a lot with a building is identified as a heritage site, any portion of a building or structure that exceeds the height of the conserved heritage building , whether an addition above the conserved heritage building or as a separate building on the same lot , must be set back from a lot line that abuts a street a distance equal to the original building setback of the conserved heritage building from that lot line that abuts a street , plus 5.0 metres.

  6. Rule I

    Despite regulation 40.10.40.10(5), if a lot is abutting a lot with a building identified as a heritage site fronting on the same street , the height of the first storey may be less than 4.5 metres provided it is no less than 3.7 metres.

  7. Older by-law A

    Section 12 (2) 132 of former City of Toronto By-law 438-86

  8. Older by-law B

    Section 12 (2) 270 (a) of former City of Toronto By-law 438-86

3 parts for other addresses
  • B On 163 Queen Street East, 351 Queen Street East and 167 Parliament Street, 363, 371 and 373 Queen Street East, a seniors community house or an emergency …
  • C On even numbered addresses of 8-34 Britain Street, 120-122 Sherbourne Street and 155 George Street, despite regulation 40.10.20.40 (1), dwelling units are …
  • D On odd numbered addresses of 315-321 Queen Street East and 145 Berkeley Street, no building or structure is to exceed a height of 12.0 metres within a distance …
By-law 569-2013, Chapter 900

Lot facts

Area
254 m²
Frontage
12.2 m
Depth
22.5 m
Street
Britain St
Corner lot
No
Public lane
Stonecutters Lane, 30.9 m along it
Max height
30 m
Max lot coverage
—
  • Major Transit Station Area: Corktown. The lot is inside the Corktown Major Transit Station Area approved by the Province (Site and Area Specific Policy 764). Source
  • King-Parliament Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
  • Downtown building setback overlay. Towers over 36 m here need extra setbacks above 24 m and 25 m between towers. Houses and other low buildings are not affected. Source
  • Zone CR 4.5 (c2.0; r4.0) SS2 (x333) (Commercial Residential). Chapter 40, section 40.10 of the by-law. Source
  • 2 City trees in front of this lot. The City's street tree inventory lists 2 trees at this address: maple, freeman autumn blaze (13 cm), honey locust (9 cm). Diameter is the trunk at breast height. Source

Around this lot

Minor variances approved
100%17 of 17 decisions
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
1
Development applications
21

Within 300 m, last 10 years. 1 suite and multiplex permits: no more than at most Toronto houses (median 3). 17 variance decisions: no more than at most Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To legalize and to maintain the interior ground floor staircase, leading to the mezzanine, which was constructed without an authorized building permit. It should be noted that access to the mezzanine was only from the exterior of the building.

    53 ONTARIO ST · Sep 23, 2026 · 308 m away
  • Minor varianceApproved

    To alter the development standards (as approved under Site Specific Zoning By-law 1334-2023(OLT)) for the 44-storey mixed-use building, by increasing the overall height of the building (from 133.2 m to 134.75 m measured to the top of the mechanical penthouse) and height of the podium (from 30 m to 30.5 m), reducing the setbacks, and reducing the first storey building frontage abutting the priority retail street (Dundas Steet East). There will be a total of 542 residential dwelling units on this lot. A Site Plan Control application (File Number 21 218559 STE 13 SA) is currently under review.

    212 DUNDAS ST E · Jul 15, 2026 · 496 m away
  • Minor varianceApproved

    To alter the existing three-storey mixed-use building by constructing a rear one-storey addition with a basement to expand commercial units and to provide a new internal connection on the ground floor between the main building and the rear ancillary building on the lot, abutting the laneway. Also, to construct a new rooftop deck above the one-storey addition with access via staircases to the rear laneway, rear second level, and third storey with a balcony. Further, to convert the existing three-storey mixed-use building and rear two-storey ancillary building into a commercial development. The commercial units will remain within the basement and ground floor of the main building. A total of two residential dwelling units will be removed.

    244 QUEEN ST E · Mar 11, 2026 · 159 m away
  • Minor varianceApproved

    To construct a commercial parking lot (surface parking facility), which will contain 13 parking spaces (including one accessible parking space), with vehicular access from Harbour Light Lane. The existing two-storey non-residential building (located at 134 Jarvis Street) will be demolished.

    134 JARVIS ST · Nov 12, 2025 · 315 m away
  • Minor varianceApproved

    To alter the existing two-and-one-half-storey semi-detached building by increasing the non-residential floor space index.

    53 A MUTUAL ST · Oct 1, 2025 · 430 m away

Latest activity nearby

  • Consent (lot split)Pending

    To obtain consent to sever the property into two lots (Building B and Building C) and to create new reciprocal stratified easements/rights-of-way.

    90 ONTARIO ST · Nov 4, 2027 · 231 m away
  • Building permit

    1 wall sign**PHARMASAVE**

    213 A QUEEN ST E · Nov 23, 2026 · 43 m away
  • Building permit

    1 wall sign**PHARMASAVE**

    215 QUEEN ST E · Nov 12, 2026 · 33 m away
  • Building permit

    Proposal to install mag lock.

    275 QUEEN ST E · Nov 5, 2026 · 205 m away
  • Zoning review

    Cancelled

    201 FREDERICK ST · Nov 3, 2026 · 276 m away
  • Building permit

    1 wall sign**PHARMASAVE**

    215 QUEEN ST E · Oct 26, 2026 · 33 m away
  • Building permit

    Proposal to renovate the existing ground floor sprinkler system for Shoppers Drug Mart tenant fit out.

    275 QUEEN ST E · Oct 19, 2026 · 205 m away
  • Building permit

    REV01: Proposed revision change of use to include the ground floor and interior alterations to ground floor to create retail spaceProposal for interior alternations to residential unit at first floor. Existing residential units at second and third floor to remain with new exterior stair proposed to facilitate code-compliant egress. No changes proposed to existing building GFA, height, or setbacks.

    154 SHUTER ST · Oct 15, 2026 · 250 m away
  • Consent (lot split)Approved

    To obtain consent to create a new stratified easement/right-of-way.

    125 GEORGE ST · Oct 14, 2026 · 179 m away
  • Building permit

    Proposed Kitec Piping Replacement

    333 ADELAIDE ST E · Oct 13, 2026 · 254 m away

Neighbourhood: Moss Park

About the area around the lot, not the lot itself.

Nearest station
Queen Station12 min walk
Nearest TTC stop
Queen St East at Sherbourne St1 min walk
Nearest cycling route
Sherbourne StCycle Track, 1 min walk
Nearest traffic count
17,503 vehicles in 14 hQueen St E / Sherbourne St, 70 m away, Jun 19, 2024
Serious collisions within 500 m
162021–2026, killed or seriously injured: 2 fatal, 11 with pedestrians, 1 with cyclists
Parks
Moss Park1 min walk
St. James Park6 min walk
Ontario Street Parkette7 min walk

Schools within 1 km

  • GEORGE BROWN COLLEGE - ST JAMES CAMPUS College 5 min walk
  • ECOLE ELEMENTAIRE GABRIELLE ROY French Public 6 min walk
  • LIBERTY PREP SCHOOL Private 7 min walk
  • KEYSTONE INTERNATIONAL SCHOOLS Private 10 min walk
  • MARKET LANE JR & SR PUBLIC SCHOOL English Public 10 min walk
  • ST MICHAEL'S CHOIR SCHOOL - ELEMENTARY English Separate 10 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureMoss ParkMedian neighbourhood
Median household income (2020)$65,000$84,500
Households that own their home35%54%
Population (2021)21,49016,813
Homes built in 1960 or before17%29%
Homes needing major repairs8%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleMoss ParkCity median
Assault2226.8636.3
Robbery166.669.5
Homicide3.45.3
Shootings3.410.5
Auto theft81.6192.6
Theft over $5,00064.646.1
Break and enter350.2172.8
Theft from vehicles275.4188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
  • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.