HousePrecheckCheck an address

475 Fenmar DrToronto · zoning, lot size and permit records

Employment · EH 1.0≈ 116.3 × 231.3 m13,450 m²on Fenmar Drcorner, also on Ormont Dr

Not a home

An employment area

The zoning by-law sets this parcel aside for employment: offices, workshops and industry. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Offices, workshops or industryTrucks and noise in working hours, quiet at night; check what is made or stored there.
N50 m
≈ 116.3 m frontage≈ 231.3 m deepirregular lot, estimated

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

    Not in these records

    • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
    • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

    History of this lot

    1 records on file: more than at 53% of Toronto houses (median 0).

    • Building permit10 175052Closed

      (1) backflow preventer to ground floor water meter room of *FGL Precision Mouldings*

      Jun 11, 2010 · 475 FENMAR DR

    Lot facts

    Area
    13,450 m²
    Frontage
    116.3 mestimated, irregular lot
    Depth
    231.3 mestimated, irregular lot
    Street
    Fenmar Dr
    Corner lot
    Yes, also on Ormont Dr231.3 m along it
    Public lane
    None
    House footprint
    4,192 m²roof up to 14.7 m
    Back yard
    82.7 mhouse to rear lot line
    Side yards
    13.5 m and 19.5 mhouse to side lot lines
    Buildings on the lot
    1house, garage, sheds
    Max height
    —
    Max lot coverage
    —

    House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

    • Zone EH 1.0 (Employment Heavy Industrial). Chapter 60, section 60.30 of the by-law. Source
    • 20 City trees in front of this lot. The City's street tree inventory lists 20 trees at this address: basswood, redmond (9 cm), basswood, redmond (7 cm), honey locust (7 cm). Diameter is the trunk at breast height. Source

    Around this lot

    Minor variances approved
    100%2 of 2 decisions
    Garden suite permits
    0
    Laneway suite permits
    0
    Multiplex permits
    0
    Development applications
    2

    Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 2 variance decisions: no more than at most Toronto houses (median 19).

    Recent variance decisions in the same zone

    • Minor varianceApproved

      To construct a one-storey north side addition to the existing building.

      700 FENMAR DR · Aug 27, 2026 · 465 m away
    • Minor varianceApproved

      To construct a one-storey addition along the east side of the existing building.

      226 TORYORK DR · Jun 12, 2025 · 345 m away
    • Minor varianceApproved

      To maintain the existing vehicle body repair shop.

      701 FENMAR DR · Jan 23, 2025 · 418 m away
    • Minor varianceApproved

      To construct a one-storey rear addition.

      184 TORYORK DR · Nov 21, 2024 · 186 m away
    • Minor varianceApproved

      To construct a mixed-use building.

      500 FENMAR DR · Jan 18, 2024 · 192 m away

    Latest activity nearby

    • Zoning review

      Closed

      175 TORYORK DR · Aug 20, 2026 · 295 m away
    • Zoning review

      Closed

      190 TORYORK DR · Jul 2, 2026 · 167 m away
    • Building permit

      Alteration to construct office space in existing warehouse.

      500 FENMAR DR · Jun 11, 2026 · 192 m away
    • Zoning review

      Closed

      172 TORYORK DR · Apr 1, 2026 · 249 m away
    • Building permit

      CONSTRUCTION OF RACKING IN WAREHOUSE SPACE

      500 FENMAR DR · Apr 1, 2026 · 192 m away
    • Zoning review

      Cancelled

      216 TORYORK DR · Mar 19, 2026 · 265 m away
    • Zoning review

      Application On Hold

      175 TORYORK DR · Feb 3, 2026 · 295 m away
    • Building permit

      Proposed interior alteration to add new spray booth in the existing vehicle repair shop unit.

      175 TORYORK DR · Jan 28, 2026 · 295 m away
    • Zoning review

      Closed

      175 TORYORK DR · Nov 25, 2025 · 295 m away
    • Zoning review

      Closed

      175 TORYORK DR · Nov 21, 2025 · 295 m away

    Neighbourhood: Humber Summit

    About the area around the lot, not the lot itself.

    Nearest station
    Milvan Rumike Station22 min walk
    Nearest TTC stop
    Ormont Dr at Fenmar Dr West Side1 min walk
    Nearest traffic count
    8,958 vehicles in 8 hFenmar Dr / Ormont Dr, 120 m away, Nov 30, 2009
    Serious collisions within 500 m
    12021–2026, killed or seriously injured: 0 fatal, 0 with pedestrians, 0 with cyclists
    Parks
    Knights of Columbus Park12 min walk

    2021 Census

    FigureHumber SummitMedian neighbourhood
    Median household income (2020)$80,000$84,500
    Households that own their home72%54%
    Population (2021)12,18516,813
    Homes built in 1960 or before16%29%
    Homes needing major repairs6%7%

    Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

    Police-reported crime, 2025

    Per 100,000 peopleHumber SummitCity median
    Assault1031.8636.3
    Robbery191.169.5
    Shootings30.610.5
    Auto theft672.6192.6
    Theft over $5,000191.146.1
    Break and enter397.4172.8
    Theft from vehicles282.8188.1

    Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

    Something here not right?

    Sources

    • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
    • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
    • Development applications: Rezoning, site plan, subdivision and condominium applications.
    • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
    • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
    • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
    • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
    • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
    • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
    • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
    • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
    • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
    • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
    • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
    • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
    • Address points: loaded Nov 22, 2026, published Nov 20, 2026
    • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
    • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
    • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
    • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
    • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
    • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
    • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
    • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
    • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
    • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
    • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
    • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
    • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
    • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
    • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
    • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
    • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
    • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
    • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
    • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
    • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
    • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
    • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
    • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
    • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
    • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
    • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
    • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
    • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
    • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
    • School locations: loaded Oct 14, 2026, published May 27, 2026
    • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
    • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
    • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
    • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
    • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
    • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
    • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
    • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
    • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

    Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

    Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

    Flag an error

    What is not right?

    The problem

    The records come from the City's open data; we check each flag against them. Your email is used only to answer this.