HousePrecheckCheck an address

474 Ontario StToronto · zoning, lot size and permit records

Open space · OR≈ 47.4 × 87.9 m2,138 m²on Ontario Stbacks onto Neutral Lane

Not a home

Winchester Park - South Prop

The City of Toronto's real estate inventory lists Winchester Park - South Prop here, on City land in City use. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Green space next doorShade, play and walks; busy parks also bring events and evening noise.
  • 6 development applications open within 300 m, up to 49 storeysNew buildings may go up around here in the next years. More change nearby than at 97% of Toronto houses.
N20 m
≈ 47.4 m frontage≈ 87.9 m deepirregular lot, estimated

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • Heritage property: designated (Part IV)

    Needs a closer look

    On the City's Heritage Register. Demolition and exterior changes need heritage review.

    What it means. Renovations, additions and demolition can take longer, cost more or be refused.

    How to confirm. Heritage Planning at the City confirms the status and what it covers. Details

    City of Toronto Heritage Register
  • 6 development applications open within 300 m

    Good to know

    6 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 49 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

3 records on file: more than at 81% of Toronto houses (median 0).

  • Building permit16 212562Closed

    Installation of one backflow preventer - Sacre-Coeur de Toronto

    Sep 21, 2016 · 474 ONTARIO ST
  • Building permit15 151392Closed

    Installation of one backflow prevention device - Le Club D'age D'or Sare - Coeur De Toronto

    Jun 1, 2015 · 474 ONTARIO ST
  • Building permit08 212146Closed

    Construct accessibility ramp to front entrance of assembly seniors club building.

    Nov 19, 2008 · 474 ONTARIO ST

Lot facts

Area
2,138 m²
Frontage
47.4 mestimated, irregular lot
Depth
87.9 mestimated, irregular lot
Street
Ontario St
Corner lot
No
Public lane
Neutral Lane, 39.3 m along it
House footprint
154 m²roof up to 9.9 m
Back yard
61.4 mhouse to rear lot line
Side yards
3.3 m and 26.5 mhouse to side lot lines
Buildings on the lot
1house, garage, sheds
Max height
—
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • Downtown Plan Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
  • Downtown building setback overlay. Towers over 36 m here need extra setbacks above 24 m and 25 m between towers. Houses and other low buildings are not affected. Source
  • Zone OR (Open Space Recreation). Chapter 90, section 90.30 of the by-law. Source

Around this lot

Minor variances approved
93%25 of 27 decisions
Garden suite permits
0
Laneway suite permits
3
Multiplex permits
16
Development applications
14

Within 300 m, last 10 years. 19 suite and multiplex permits: more than at 87% of Toronto houses (median 3). 27 variance decisions: more than at 59% of Toronto houses (median 19).

Latest activity nearby

  • Building permit

    REVISION - EXIT STAIR FLIPPED TO RUN SOUTH WITH NEW LANDING/FOUNDATIONS, EXIT DOOR RELOCATED, 2 NEW WINDOWS IN WEST WALL. NO CHANGE TO USE OR AREA.Proposal for interior alteration to add a partial new floor area on the 2nd floor of the building; Health & Fitness Club ( Group D & A2).

    159 BLEECKER ST · Nov 25, 2026 · 280 m away
  • Building permit

    Building a 10' x 12' deck to replace the previously existing deck.

    27 WINCHESTER ST · Nov 19, 2026 · 176 m away
  • Building permit

    Proposed fire damages repair

    223 CARLTON ST · Nov 18, 2026 · 197 m away
  • Building permit

    FS - Sprinkler Shop Drawing - Proposal for interior alteration and addition to change the vacant residential semi detached house to a supportive housing (residential and ancillary office) building

    209 CARLTON ST · Nov 9, 2026 · 137 m away
  • Building permit

    PROPOSAL TO REPLACE DAMAGED SECOND FLOOR DECK PLATFORM FRAMINGEXISTING DECK POSTS AND FOUNDATIONS TO REMAIN UNCHANGED

    416 ONTARIO ST · Nov 6, 2026 · 247 m away
  • Building permit

    Proposal to undertake Exterior Renovations (AODA), including modifications to exterior parking areas, line painting, stairs (guards, handrails, and tactile warning indicators), installation of permeable pavers, and curbs to improve accessibility and bring the site into compliance with AODA requirements.

    439 SHERBOURNE ST · Nov 3, 2026 · 292 m away
  • Building permitmultiplex

    Proposal for the legalization of the 5th unit at the existing 4th unit building.

    216 GERRARD ST E · Nov 2, 2026 · 295 m away
  • Building permit

    Minor renovations involving, Installing a 12-foot-wide patio door/screen assembly in an enlarged opening on the second floor; Removing a small section of the partition wall on the ground floor; andRelocating a fire exit door within the existing wall. - Unit A

    223 CARLTON ST · Oct 28, 2026 · 197 m away
  • Building permit

    Proposal for backwater valve installation

    490 ONTARIO ST · Oct 23, 2026 · 35 m away
  • Building permit

    Backwater valve installation

    488 ONTARIO ST · Oct 21, 2026 · 25 m away

Neighbourhood: Cabbagetown-South St.James Town

About the area around the lot, not the lot itself.

Nearest station
Sherbourne Station15 min walk
Nearest TTC stop
Carlton St at Ontario St1 min walk
Nearest cycling route
Ontario StCycle Track - Contraflow, 1 min walk
Nearest traffic count
486 vehicles in 8 hAberdeen Ave / Ontario St, 40 m away, Apr 24, 2007
Serious collisions within 500 m
82021–2026, killed or seriously injured: 1 fatal, 6 with pedestrians, 1 with cyclists
Parks
Winchester Square Park1 min walk
Winchester Park2 min walk
Allan Gardens3 min walk

Schools within 1 km

  • WINCHESTER JR & SR PUBLIC SCHOOL English Public 4 min walk
  • OUR LADY OF LOURDES CATHOLIC ELEMENTARY SCHOOL English Separate 5 min walk
  • NATIONAL BALLET SCHOOL - MARGARET MCCAIN ACEDEMIC CENTRE Private 8 min walk
  • NATIONAL BALLET SCHOOL Private 8 min walk
  • LORD DUFFERIN JR & SR PUBLIC SCHOOL English Public 8 min walk
  • NATIONAL BALLET SCHOOL - THE SHOE ROOM Private 9 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureCabbagetown-South St.James TownMedian neighbourhood
Median household income (2020)$76,500$84,500
Households that own their home45%54%
Population (2021)11,02016,813
Homes built in 1960 or before42%29%
Homes needing major repairs9%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleCabbagetown-South St.James TownCity median
Assault1078.6636.3
Robbery145.369.5
Auto theft91.8192.6
Theft over $5,00022.946.1
Break and enter321.3172.8
Theft from vehicles229.5188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 29, 2026, published Nov 27, 2026
  • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 29, 2026, published Nov 27, 2026
  • City-owned land: loaded Nov 29, 2026, published Nov 23, 2026
  • Committee of Adjustment open applications: loaded Nov 29, 2026, published Nov 28, 2026
  • Committee of Adjustment decisions: loaded Nov 29, 2026, published Nov 28, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 29, 2026, published Nov 28, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 29, 2026, published Nov 29, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 29, 2026, published Nov 24, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Nov 29, 2026, published Nov 23, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 29, 2026, published Nov 28, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 29, 2026, published Nov 28, 2026
  • Cleared building permits: loaded Nov 29, 2026, published Nov 28, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 29, 2026, published Nov 28, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 29, 2026, published Nov 28, 2026
  • Multi-tenant house licences: loaded Nov 29, 2026, published Nov 28, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Nov 29, 2026, published Nov 23, 2026
  • Short-term rental registrations: loaded Nov 29, 2026, published Nov 28, 2026
  • Traffic counts at intersections: loaded Nov 29, 2026, published Nov 28, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Nov 29, 2026, published Nov 23, 2026
  • Lot coverage overlay: loaded Nov 29, 2026, published Nov 23, 2026
  • Height overlay: loaded Nov 29, 2026, published Nov 23, 2026
  • Parking zone overlay: loaded Nov 29, 2026, published Nov 23, 2026
  • Policy area overlay: loaded Nov 29, 2026, published Nov 23, 2026
  • Priority retail streets: loaded Nov 29, 2026, published Nov 23, 2026
  • Rooming house overlay: loaded Nov 29, 2026, published Nov 23, 2026
  • Zoning setbacks: loaded Nov 29, 2026, published Nov 23, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.