Before you offer
From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.
Heritage property: listed
Needs a closer lookOn the City's Heritage Register. Demolition and exterior changes need heritage review.
What it means. Renovations, additions and demolition can take longer, cost more or be refused. A listing is not registered on title, so a title search will not show it.
How to confirm. Heritage Planning at the City confirms the status and what it covers. Details
City of Toronto Heritage RegisterTRCA regulated area (5% of lot)
Needs a closer lookPart of the lot is near a valley, floodplain, shoreline or wetland. Work there needs a TRCA permit and may be restricted.
What it means. Additions, pools and new buildings in the regulated part need a TRCA permit and may be refused. Ask your insurer about flood coverage.
How to confirm. A TRCA property inquiry letter says which policies apply ($385, at least two weeks). Details
Ontario Regulation 41/24, TRCA Regulation LimitRavine and natural feature protection (7% of lot)
Needs a closer lookPart of the lot is in the area covered by the City's Ravine and Natural Feature Protection By-law. The City's map of the area was last published in 2019.
What it means. In that part, injuring or removing a tree of any size, grading, filling or dumping needs a City permit. Plans for a pool, addition or garden suite there may be refused.
How to confirm. Urban Forestry confirms where the protected area runs and whether work needs a permit. Details
Toronto Municipal Code, Chapter 65866 building permits open, the oldest since 2016
Needs a closer lookStill open in the City's records: 24 230251 (Install three magnetic locks and associated electrical components - Level 5, 2024, status Inspection); 24 170875 (Proposed golf simulator rooms and banquet to be built where current multipurpose rooms..., 2024, status Inspection); 24 162399 (PROVISION OF NEW (30) ELECTROMAGNETIC LOCKS ON 4TH & 8TH FLOORS OF ROSS BUILDING, 2024, status Inspection); and 63 more.
What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.
How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details
City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)Natural Heritage System (9% of lot)
Good to knowPart of the lot is in the Natural Heritage System shown on Official Plan Map 9.
What it means. New buildings or additions in that part need a natural heritage impact study.
How to confirm. City Planning confirms the policies that apply. Details
City of Toronto Official Plan, Map 925 by-law investigations closed in the last two years
Good to knowClosed files (Adequate Heat, Property Standards): 26 261470 PRS 00 IR (Property Standards, 2026); 26 227887 PRS 00 IR (Property Standards, 2026); 26 208938 PRS 00 IR (Property Standards, 2026); and 22 more.
What it means. Someone raised an issue here and the City closed the file. Ask the seller what it was about.
City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigationsWork or applications in progress
Good to knowRecent records on this lot: 26 254848 (Proposed interior alterations to existing washrooms including replacing fixtures, toile..., 2026); 26 238885 (Proposal for interior alteration of existing academic and office spaces for a new Schoo..., 2026); 26 248332 (Proposed renovate decommissioned washrooms at 190 Albany building used for a demolished..., 2026); and 31 more.
What it means. The owner has planned or started work. Ask what it covers, whether it will be finished before closing, and who pays for what is left.
How to confirm. Application details and decisions are in the City's Application Information Centre. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details
City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards); City of Toronto, Development Applications1 Committee of Adjustment file on this lot
Good to know1 approved. A0508/23EYK (To construct two new 8-storey student housing buildings, 2024).
What it means. Approved variances and consents stay with the property, including any conditions in the decision. They allow what was approved, not more.
How to confirm. Decisions are in the Application Information Centre; older files are available from the Committee of Adjustment office. Details
City of Toronto, Committee of Adjustment applications (2001 onwards)1 development application open within 300 m
Good to know1 rezoning, site plan, subdivision or condominium application within 300 m, submitted in the last 10 years, is not closed yet, including buildings of up to 8 storeys. They are listed under Around this lot.
What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.
How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details
City of Toronto, Development Applications
Not in these records
- Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
- Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.
History of this lot
902 records on file: more than at 100% of Toronto houses (median 0).
- Building permit26 254848Permit Issued
Proposed interior alterations to existing washrooms including replacing fixtures, toilet, partitions, plumbing, lighting, finishes, wall tiles etc.
Nov 16, 2026 · 170 CAMPUS WALK - Building permit26 238885Permit Issued
Proposal for interior alteration of existing academic and office spaces for a new School of Medicine which includes Student Academic and Study Spaces, Clinical Simulation Rooms, and Administration and Office Suites.
Nov 16, 2026 · 88 THE POND RD - Building permit26 267628Under Review
Proposal for Annual re-inflation of air-supported Dome structure on existing turf field within existing York Lions Dome stadium.
Nov 9, 2026 · 230 IAN MACDONALD BLVD - By-law investigation26 261470 PRS 00 IRClosed
Property Standards
Oct 28, 2026 · 4700 KEELE ST - Building permit26 248332Inspection
Proposed renovate decommissioned washrooms at 190 Albany building used for a demolished outdoor tennis stadium into a new engineering, shaker laboratory
Oct 23, 2026 · 4700 KEELE ST - Building permit26 254179Permit Issued
Full replacement of the Dry Sprinkler system in Arena 1 & 2 (Sprinkler Mains, Braches & Heads), due to age and rot of pipe.
Oct 22, 2026 · 989 MURRAY ROSS PKWY - Zoning review26 252116 LTOClosedOct 9, 2026 · 4700 KEELE ST
- Zoning review26 245857 ZAPClosedSep 28, 2026 · 4700 KEELE ST
Show 192 older records
- Building permit26 130850Cancelled
Revision 01: Revision as requested by inspector. HVAC - interior alterations to classrooms
Sep 14, 2026 · 4700 KEELE ST - Building permit26 207459Permit Issued
Proposed minor alterations on lower ground level to create a 184 sq.m. physics laboratory classroom by subdividing an existing library room, with associated minor electrical and HVAC updates.
Sep 3, 2026 · 4700 KEELE ST - By-law investigation26 227887 PRS 00 IRClosed
Property Standards
Aug 28, 2026 · 4700 KEELE ST - Building permit26 217067Inspection
Interior alterations to renovate existing classrooms.
Aug 27, 2026 · 165 CAMPUS WALK - By-law investigation26 208938 PRS 00 IRClosed
Property Standards
Jul 26, 2026 · 4700 KEELE ST - Building permit26 125851Revision Issued
REV 01: location of 1 of the dome structures is moving to the north-east corner of the siteThe purpose of this building permit is to erect 2 prefabricated geodesic growing domes on the Maloca Gardens site on the south-west corner of the York University Keele Campus Each Dome has a 26'-0" diameter, and 12'-7" height
Jul 2, 2026 · 4700 KEELE ST - Building permit26 136717Inspection
Proposed alterations to Infant Room at Lee Wiggin's Daycare Facility. Relocate wall and door to expand room.
Jun 25, 2026 · 4700 KEELE ST - Building permit25 199727Closed
Revision 1: revised scope of permit application 25-199727 BLD 00 BA. Renovate existing storage space into research lab.Proposed interior alterations to convert the existing storage space into a research lab (University Uses).
Jun 8, 2026 · 4700 KEELE ST - By-law investigation26 168626 PRS 00 IRClosed
Property Standards
May 27, 2026 · 4700 KEELE ST - By-law investigation26 168598 PRS 00 IRClosed
Property Standards
May 27, 2026 · 4700 KEELE ST - Building permit26 116769Permit Issued
Proposal to remove existing block wall in the central utilities room and replace with new block wall to facilitate removal of the existing equipment and delivery of new temporary shoring and support will be installed during construction to maintain structural stability. Existing brick veneer will be removed and replaced as required.
May 7, 2026 · 169 ALBANY RD - Building permit26 141490Inspection
Renovate 2 smaller classroom spaces and 1 student lounge area into 1 large active learning classroom.
May 6, 2026 · 4700 KEELE ST - By-law investigation26 148244 PRS 00 IRClosed
Property Standards
Apr 22, 2026 · 4700 KEELE ST - Building permit26 130370Permit Issued
Interior alterations to exist. washrooms including replacing fixtures, toilet partitions, plumbing, lighting, finishes, wall tiles, etc.
Apr 20, 2026 · 136 CAMPUS WALK - Building permit26 130356Permit Issued
Proposed interior alterations to existing washrooms including replacing fixtures, toilet partitions, plumbing, lighting, finishes, wall tiles.
Apr 20, 2026 · 170 CAMPUS WALK - Building permit26 130393Permit Issued
Interior alterations to exist. washrooms including replacing fixtures, toilet partitions, plumbing, lighting, finishes, wall tiles, etc.
Apr 17, 2026 · 72 WINTERS LANE - By-law investigation26 142145 PRS 00 IRClosed
Property Standards
Apr 11, 2026 · 4700 KEELE ST - Zoning review26 124650 LPRClosedMar 4, 2026 · 4700 KEELE ST
- By-law investigation26 113580 HEA 00 IRClosed
Adequate Heat
Feb 5, 2026 · 4700 KEELE ST - By-law investigation26 110557 PRS 00 IRClosed
Property Standards
Jan 29, 2026 · 4700 KEELE ST - By-law investigation26 106654 HEA 00 IRClosed
Adequate Heat
Jan 20, 2026 · 4700 KEELE ST - By-law investigation26 102522 HEA 00 IRClosed
Adequate Heat
Jan 9, 2026 · 4700 KEELE ST - By-law investigation26 101813 SNI 00 IRClosed
Snow and Ice
Jan 7, 2026 · 4700 KEELE ST - Zoning review25 268791 LTOClosedDec 22, 2025 · 4700 KEELE ST
- By-law investigation25 267090 HEA 00 IRClosed
Adequate Heat
Dec 16, 2025 · 4700 KEELE ST - Building permit25 252048Inspection
Proposed interior alterations for minor alteration on ground level to create new 137 m2 classroom by subdividing an existing reading room, with associated minor electrical and HVAC updates.
Dec 11, 2025 · 115 CAMPUS WALK - By-law investigation25 263463 PRS 00 IRClosed
Property Standards
Dec 7, 2025 · 4700 KEELE ST - By-law investigation25 263459 PRS 00 IRClosed
Property Standards
Dec 7, 2025 · 4700 KEELE ST - By-law investigation25 263455 PRS 00 IRClosed
Property Standards
Dec 7, 2025 · 4700 KEELE ST - Building permit25 234876Closed
HVAC - Proposed interior alterations to a commercial retail unit within York Lanes Shopping Center at York University. Scope of work includes demolition, minor alterations on hvac/sprinklers/plumbing/life-safety, and new mill-work & flooring. - unit # 32.
Dec 3, 2025 · 80 YORK BLVD - Building permit25 229454Permit Issued
Proposal for the installation of 3 Temporary Tents for Tennis Canada. ONE 15Mx5M Tent Cert#25 135657 000 00, ONE 25Mx20M Tent Cert#25 135831 000 00 and 25Mx50M Tent. Anchoring will be staked to ground, Install is Oct 2nd and Removal Oct 27thConvenience address is 1 Shoreham Dr.
Oct 22, 2025 · 4700 KEELE ST - Building permit25 232862Inspection
Interior renovation of an existing leasing office (Gross area= 269 m2) involving layout alterations, upgrade of one existing model suite, and addition of a new model suite type to expand leasing options related to an adjacent student residence on Haynes Ave
Oct 16, 2025 · 4700 KEELE ST - Building permit25 221056Inspection
Proposed alterations to renovate existing classrooms.
Oct 9, 2025 · 4700 KEELE ST - Building permit25 221005Inspection
Interior alterations to an existing classroom - York Classroom Renewal Y3
Oct 9, 2025 · 170 CAMPUS WALK - Building permit25 217475Closed
Proposal to extend an underground sanitary pipe to an adjacent commercial retail unit for future use.
Oct 2, 2025 · 80 YORK BLVD - Building permit25 203326Closed
Washroom alterations including HVAC, plumbing, lighting, new finishes, new washroom fixtures and partitions.
Oct 1, 2025 · 4700 KEELE ST - Zoning review25 229493 LPRCancelledSep 23, 2025 · 4700 KEELE ST
- Zoning review25 228031 LPRClosedSep 19, 2025 · 4700 KEELE ST
- Building permit25 203908Closed
Proposal for interior alterations to washrooms on first floor
Sep 3, 2025 · 4700 KEELE ST - Building permit25 203899Closed
Proposal for interior alterations to washrooms on first floor
Sep 3, 2025 · 4700 KEELE ST - Building permit25 203885Closed
Proposal for interior alterations to washrooms on first and second floor
Sep 3, 2025 · 4700 KEELE ST - Building permit25 199739Inspection
Proposed interior alterations to demolish existing office spaces, classrooms and interior fit-up for new laboratories, offices, exercise training facilities, washrooms and kitchen on the lower ground level of the building. The renovated space will include six specialty assessment rooms, two new offices, one new metabolic kitchen, a cryogenic storage room, a wet lab, two exercise training facilities, additional storage, a seminar room, a barrier free washroom and two additional gendered washrooms with a change room and shower.
Aug 20, 2025 · 4700 KEELE ST - By-law investigation25 213115 PRS 00 IRClosed
Property Standards
Aug 19, 2025 · 4700 KEELE ST - Building permit23 197187Inspection
Proposed installation of vented cabinet at McLaughlin College - Laboratory Prep Room157a.
Aug 14, 2025 · 4700 KEELE ST - By-law investigation25 205600 LGW 00 IRClosed
Long Grass and Weeds
Aug 5, 2025 · 4700 KEELE ST - By-law investigation25 200879 PRS 00 IRClosed
Property Standards
Jul 27, 2025 · 4700 KEELE ST - Building permit25 183428Closed
Proposed interior alteration for a quick serve restaurant.
Jul 22, 2025 · 4700 KEELE ST - By-law investigation25 187888 PRS 00 IRClosed
Property Standards
Jul 3, 2025 · 4700 KEELE ST - By-law investigation25 177577 PRS 00 IRClosed
Property Standards
Jun 15, 2025 · 4700 KEELE ST - Building permit25 175545Cancelled
Interior alterations to an existing classroom - York Classroom Renewal Y3
Jun 11, 2025 · 170 CAMPUS WALK - Building permit25 175436Cancelled
Proposed alterations to renovate existing classrooms.
Jun 11, 2025 · 4700 KEELE ST - By-law investigation25 172229 PRS 00 IRClosed
Property Standards
Jun 5, 2025 · 4700 KEELE ST - Building permit25 168585Permit Issued
Proposed installation of temporary tents (30'x50' retail tent, 30' x30' BOH tent, and 20'x20' staff tent) for OFSAA Track and Field event. Installation June 3. Removal June 8. Tents anchored with concrete weights.
Jun 4, 2025 · 4700 KEELE ST - By-law investigation25 170897 PRS 00 IRClosed
Property Standards
Jun 3, 2025 · 4700 KEELE ST - Building permit25 144776Closed
Proposal for interior alterations to firehouse subs.
May 23, 2025 · 4700 KEELE ST - Building permit24 116844Closed
REV 01: Proposal to revise fire ratings and door hardware.Proposed interior alteration to existing washrooms, including replacing fixtures, toilet partitions, plumbing, lighting, flooring, wall tiles, etc.
May 23, 2025 · 4700 KEELE ST - Building permit24 101460Inspection
Proposed new air-supported dome structure on new synthetic turf field within the field of play at the existing York Lions Stadium.
May 21, 2025 · 230 IAN MACDONALD BLVD - By-law investigation25 161665 PRS 00 IRClosed
Property Standards
May 19, 2025 · 4700 KEELE ST - By-law investigation25 161664 PRS 00 IRClosed
Property Standards
May 19, 2025 · 4700 KEELE ST - By-law investigation25 143159 PRS 00 IRClosed
Property Standards
Apr 11, 2025 · 4700 KEELE ST - Building permit25 117138Closed
HVAC - Basic renovation of Ground Floor - Food Court Area at First Student Centre, York University
Apr 10, 2025 · 4700 KEELE ST - Building permit24 117076Closed
REV01: Proposed revision to demising/partition wall revisions and additions of HVAC fire dampers as noted in attached drawings.HVAC - Proposed interior alteration to existing washrooms, including replacing fixtures, toilet partitions, plumbing, lighting, flooring, wall tiles, etc.
Mar 14, 2025 · 4700 KEELE ST - Zoning review25 126119 ZAPApplication On HoldMar 7, 2025 · 4700 KEELE ST
- Building permit24 247100Inspection
New interior finishes for existing retail suite
Mar 7, 2025 · 4700 KEELE ST - Building permit25 110749Inspection
construct new gates and railing at the entrance and exit
Mar 4, 2025 · 4700 KEELE ST - Building permit25 108654Inspection
Proposal to replace the existing fire alarm system with a new fire alarm system integrated with mass notification. - CHEMISTRY BUILDING
Feb 20, 2025 · 4700 KEELE ST - Building permit25 108643Permit Issued
Proposal to replace the existing fire alarm system with a new fire alarm system integrated with mass notification. - CALMUT BUILDING
Feb 20, 2025 · 4700 KEELE ST - Building permit25 108624Inspection
Proposal to replace the existing fire alarm system with a new fire alarm system integrated with mass notification. - MACLAUGHIN BUILDING
Feb 13, 2025 · 4700 KEELE ST - By-law investigation25 115748 PRS 00 IRClosed
Property Standards
Feb 11, 2025 · 4700 KEELE ST - Building permit24 211746Permit Issued
There are currently 5 steel pedestrian bridges in poor condition providing access to Calumet Residence. Rather than repair and replace the bridges, YorkU plans to permanently close the bridges for use. Through a code analysis with our code consultant, they have deemed that the closure of these bridges will not reduce the exit capacity to a non-compliant condition, and they have recommended we obtain a building permit to avoid any future concerns.
Dec 10, 2024 · 4700 KEELE ST - Zoning review24 246568 ZAPCancelledDec 4, 2024 · 4700 KEELE ST
- Building permit24 230251Inspection
Install three magnetic locks and associated electrical components - Level 5
Nov 1, 2024 · 4700 KEELE ST - Zoning review24 219608 LTOClosedSep 30, 2024 · 4700 KEELE ST
- Building permit24 174941Closed
Proposal for interior renovation to existing coffee shop (starbucks) kiosk
Sep 6, 2024 · 4700 KEELE ST - Building permit24 170875Inspection
Proposed golf simulator rooms and banquet to be built where current multipurpose rooms are. Scope of proposed restaurant renovation is to relocate plumbing fixtures and equipment. Proposed restaurant occupancy is to remain as is.
Aug 30, 2024 · 989 MURRAY ROSS PKWY - Building permit24 134736Closed
Interior alterations - Vari Hall, history department for the service counter
Aug 7, 2024 · 4700 KEELE ST - Zoning review24 171199 PSPClosedJul 31, 2024 · 4700 KEELE ST
- Building permit24 156880Closed
Proposed interior alterations of an existing suite - including HVAC, plumbing, and electrical work (Victor Phillip Dahdaleh Building).
Jul 26, 2024 · 4700 KEELE ST - Building permit19 195282Closed
Revision - Remove three demising walls and reconfigure classrooms.HVAC - Proposal to construct a new five storey building with basement and mechanical penthouse with minor renovations and service connections to the adjacent existing building to the north. (York University - School of Continuing Studies)
Jul 25, 2024 · 4700 KEELE ST - Building permit24 116886Closed
Proposed interior alteration to existing washrooms, including replacing fixtures, toilet partitions, plumbing, lighting, flooring, wall tiles, etc.
Jul 18, 2024 · 4700 KEELE ST - Building permit24 116864Closed
Proposed interior alteration to existing washrooms, including replacing fixtures, toilet partitions, plumbing, lighting, flooring, wall tiles, etc.
Jul 3, 2024 · 4700 KEELE ST - Development application24 171199 WET 07 SAClosed
To permit the construction of Phase 3 of the Quad Subdivision (York University) with two eight-storey purpose built student residences comprising a total of 579 residence units. The proposed locations are at the NE and NW corner of Haynes Avenue and Assiniboine Road.
Jun 27, 2024 · 4700 KEELE ST · City file - Building permit24 162399Inspection
PROVISION OF NEW (30) ELECTROMAGNETIC LOCKS ON 4TH & 8TH FLOORS OF ROSS BUILDING
Jun 14, 2024 · 4700 KEELE ST - Building permit24 155423Closed
HVAC - Interior alterations of an existing suite - including HVAC, plumbing and electrical work
Jun 14, 2024 · 4700 KEELE ST - Building permit24 136808Inspection
Proposal to erect a temporary tent structure; temporary shelter for equipment storage - York UniversitySetup date - April 15, 2024; Dismantle date September 30, 2024Convenience address is 190 Albany Rd.
Jun 14, 2024 · 4700 KEELE ST - Building permit24 117063Closed
HVAC - Proposed interior alteration to existing washrooms, including replacing fixtures, toilet partitions, plumbing, lighting, flooring, wall tiles, etc.
Jun 7, 2024 · 4700 KEELE ST - Building permit24 116974Closed
Proposed interior alteration to existing washrooms, including replacing fixtures, toilet partitions, plumbing, lighting, flooring, wall tiles, etc.
Jun 7, 2024 · 4700 KEELE ST - Building permit24 116911Closed
Proposed interior alteration to existing washrooms, including replacing fixtures, toilet partitions, plumbing, lighting, flooring, wall tiles, etc.
Jun 7, 2024 · 4700 KEELE ST - Building permit24 116811Closed
Proposed interior alteration to existing washrooms, including replacing fixtures, toilet partitions, plumbing, lighting, flooring, wall tiles, etc.
Jun 7, 2024 · 4700 KEELE ST - Zoning review24 139416 ZZUClosedApr 23, 2024 · 4700 KEELE ST
- Building permit24 103945Closed
Interior renovation of four tiered classrooms at second floor, and creation of new corridors for washrooms accessibility.
Apr 5, 2024 · 4700 KEELE ST - Building permit23 206891Inspection
Proposal for interior alterations to the existing student lounge - York University, Life Sciences Building
Mar 22, 2024 · 4700 KEELE ST - Minor varianceA0508/23EYKApproved
To construct two new 8-storey student housing buildings.
Mar 7, 2024 · 4700 KEELE ST - Building permit23 221094Closed
HVAC - Proposal for interior alterations to convet existing washrooms to gender neutral washrooms and inclusion of universal accessible washroom.
Mar 4, 2024 · 4700 KEELE ST - Building permit21 251303Closed
Part Permit - The project is a new research facility on York University Campus with 2-storeys in building height. The Project will be connected to the existing Sherman Health Sciences Facility by walkways at Levels 1 and 2. Level 1 (basement) contain labs with restricted access that will be classified as a Group F, Division 3 major occupancy. Level 2 (first storey) will include consultation offices and meeting spaces. Level 3 will consist of offices and workstations. Levels 2 and 3 will be classified as Group D major occupancies.
Dec 15, 2023 · 4700 KEELE ST - Building permit23 216821Closed
Proposal for guardrail and railing modifications to block access to portions of stair were travel along stair is not perpendicular to stair riser. Requested by TTC ACAT committee.
Dec 11, 2023 · 4700 KEELE ST - Building permit23 204699Closed
Interior renovation of an office space, including new offices, a new meeting room, demolition of private washroom, new finishes and mechanical and electrical modifications to suite.
Nov 10, 2023 · 4700 KEELE ST - Zoning review23 224391 ZAPCancelledNov 9, 2023 · 4700 KEELE ST
- Building permit23 180461Permit Issued
Proposal to construct interior alterations to suite 222.
Oct 26, 2023 · 4700 KEELE ST - Building permit23 131292Permit Issued
Proposal for interior alterations to existing office space for two rooms on levels 1 and 2 to create connections to the new Neuroscience Research Facility - Sherman Health Sciences Facility
Oct 24, 2023 · 4700 KEELE ST - Building permit20 172286Closed
Revision 01 - as requested by inspections due to fire separationsProposal for interior alterations to Ground Floor Research Labs to create two new Teaching Labs.Second Floor Teaching Labs to create new Research Labs, Grad Write-up Spaces and Faculty Offices. for existing York University, Building #355 110 Campus Walk
Oct 13, 2023 · 4700 KEELE ST - Building permit20 111828Cancelled
Revision # 2 - Revision 03 - Renovation of existing unoccupied space in the basement and dividing an existing vacant space into classrooms.Plumbing - Proposal for interior alteration to an unoccupied space in the basement to classrooms.
Oct 13, 2023 · 4700 KEELE ST - Building permit23 194277Cancelled
Interior alterations to ground floor research labs to create two new teaching labsInterior alterations to second floor teaching labs to create new research labs, grad write-up spaces and faculty offices
Aug 26, 2023 · 4700 KEELE ST - Building permit23 167162Closed
Interior alteratons to private and open office space - Seneca York Campus - Service Hub - SEQ S1150
Aug 23, 2023 · 4700 KEELE ST - Building permit23 115276Closed
Proposal to convert abandoned storage and washroom area previously associated with demolished outdoor tennis stadium into university field research lab for the study of bees.
Jun 12, 2023 · 190 ALBANY RD - Building permit23 151505Closed
Installation of one 15m x 25m clearspan tent anchored with concrete weights at York University. Installation will begin on June 1st, 2023 and removal will begin on June 5th, 2023.
Jun 9, 2023 · 4700 KEELE ST - Building permit22 134267Closed
REVISION 2 - design adjustments to avoid plumbing and hvac interference below the slabRenovation to existing washrooms Nos. 197 & 198 at Steacie Library
Jun 9, 2023 · 4700 KEELE ST - Building permit23 156887Cancelled
Partial replacement of existing 300mm diameter ductile watermain and upgrade to PVC including the replacement of isolation valves and fire hydrants.
Jun 6, 2023 · 4700 KEELE ST - Building permit21 230412Closed
HVAC - Proposal for interior alterations to McLaughlin College
Jun 5, 2023 · 4700 KEELE ST - Building permit22 134526Closed
REV #1-REVISE LAYOUT FOR W/C 115, 116Renovation to existing washrooms Nos. 115 & 116 at Founders College, York University
May 16, 2023 · 4700 KEELE ST - Building permit22 133765Closed
Revision 01: revisions to the Permit application No. 22 133765 BLDAlterations to an existing washroom Nos. 155 and 161 at Behavioural Science - York University.
May 2, 2023 · 4700 KEELE ST - Building permit21 229959Closed
Drain - Construct new one storey art gallery building with ground floor connection to existing Accolade East Building at York University.See also 21 173802 WET 07 SA. Convenience address is 83A York Blvd.
Mar 22, 2023 · 83 A YORK BLVD - Building permit22 190926Closed
Proposal for interior alterations for Seneca College. Work to include demolition of partitions between 2 classrooms, storage spaces, corridor wall and ceiling tiles (including t-bars). The extent of construction includes new partition walls, a preparation, instrumentation, GMP, and CL2 Lab space, new mechanical AHU, fans, and other equipment to support the space on a platform on the reinforced structure of the roof
Feb 28, 2023 · 70 THE POND RD - Building permit23 110523Permit Issued
Proposal to demolish the colonnade piece between the existing CFT and ACE building, to allow for the new Joan and Martin Goldfarb Gallery - York UniversitySee related building permit 21 229959 BLD
Feb 17, 2023 · 83 A YORK BLVD - Building permit22 238170Permit Issued
Proposal for stand alone HVAC permit, and plumbing permit to fit out a washroom inside of an existing tenant retail space.(RU 27) (22 238174 PSA 00 PS)
Feb 2, 2023 · 4700 KEELE ST - Zoning review23 108724 LTOCancelledJan 31, 2023 · 4700 KEELE ST
- Building permit22 219305Closed
HVAC - Construction of four new accessible ramps (interior) within an existing building.
Jan 24, 2023 · 4700 KEELE ST - Building permit22 238174Permit Issued
Proposal for stand alone HVAC permit, and plumbing permit to fit out a washroom inside of an existing tenant retail space.(RU 27) (22 238170 MSA 00 MS)
Jan 12, 2023 · 4700 KEELE ST - Building permit22 220115Permit Issued
Interior Alteration - New interior partitions and HVAC
Dec 14, 2022 · 4700 KEELE ST - Building permit19 260446Revision Issued
Revision 01- revision to door operation. Proposal for interior alterations to existing reception and offices with corresponding HVAC
Dec 14, 2022 · 4700 KEELE ST - Building permit22 141407Closed
Renovation to existing washrooms Nos. 007 + 008; 022 + 023; 106 at Atkinson, York University
Aug 17, 2022 · 4700 KEELE ST - Building permit22 179064Under Review
Proposed interior alteration to daycare area "Atkinson Daycare Centre"
Jul 19, 2022 · 4700 KEELE ST - Building permit22 176802Cancelled
Proposal to install a total of 32 temporary tents and a temporary structure (Bleacher seating) for the Rogers Cup Tennis Tournament from August 6, 2022 to August 14, 2022.Convenience address is 1 Shoreham Dr.
Jul 14, 2022 · 4700 KEELE ST - Building permit22 164616Closed
Upgrade number of plumbing fixtures to meet current child care facility standards
Jul 14, 2022 · 4700 KEELE ST - Building permit22 133771Closed
Renovation to existing washrooms Nos. 148 & 149 at Centre for Film & Theatre, York University
Jul 7, 2022 · 4700 KEELE ST - Building permit22 169228Response Received
Conversion of existing storeage room into a new locker room for the York Lions Football team.
Jun 28, 2022 · 230 IAN MACDONALD BLVD - Building permit22 134520Closed
Renovation to existing washrooms Nos. 232 & 233 at Stong College
Jun 27, 2022 · 4700 KEELE ST - Building permit22 133012Inspection
Proposal for interior renovations to washrooms and interior finishes to improve accessibility.
Jun 20, 2022 · 76 WINTERS LANE - Building permit22 135169Closed
Interior alterations to the existing washrooms 1110A, 111 and 112 at Calument College.
Jun 16, 2022 · 4700 KEELE ST - Building permit22 133168Closed
interior alterations to existing bank branch "BMO"
Jun 16, 2022 · 4700 KEELE ST - Building permit22 133002Closed
HVAC - Proposal for interior renovations to washrooms and interior finishes to improve accessibility.
Jun 13, 2022 · 115 CAMPUS WALK - Building permit22 132988Inspection
Proposal for interior renovations to washrooms and interior finishes to improve accessibility.
Jun 10, 2022 · 96 THE POND RD - Building permit22 134126Closed
Renovation to existing washrooms Nos. 166 & 178
Jun 8, 2022 · 4700 KEELE ST - Development application22 156452 WET 07 SAUnder Review
City of Vaughan SIte Plan Control application for 2300 STEELES AVENUES WEST (DA.08.051). Proposal for 5 office buildings having a total gross floor area of 90, 419 square metres and a 5,349 square metre neighbourhood park block. The development will consist of two 8-storey office buildings fronting onto Steeles Avenue (Phase 2 and 3), 8 and 6 storey office buildings (Phases 4 and 5) fronting onto the future east-west road (Street "X"), and a future one-storey 1,263 square metre expansion (Phase 5) to the existing 4-storey office building located at the northwest corner of Steeles Avenue and Keele Street.
Jun 3, 2022 · 130 IAN MACDONALD BLVD · City file - Building permit22 133507Closed
Proposal to renovate existing academic offices, work areas and reconfiguration of existing corridor.
May 30, 2022 · 4700 KEELE ST - Building permit22 151009Approved
Proposal for an alternative fire protection and life safety solution (Visual Notification Devices in lieu of Audible notification devices)
May 25, 2022 · 4700 KEELE ST - Zoning review21 173802 PSPClosedMay 17, 2022 · 4700 KEELE ST
- Zoning review22 145080 ZAPCancelledMay 11, 2022 · 4700 KEELE ST
- Building permit22 111666Permit Issued
Proposal for interior alterations to existing building for an interior fit up located on the 7th floor of the Ross Building North. Scope of work includes new feature wall in the lobby, reception office, 2 meeting rooms, multi- purpose room, student lounge, kitchenette, replacement of corridor floor finish, and replacement of window blinds.
May 5, 2022 · 115 CAMPUS WALK - Building permit22 133760Cancelled
Renovation to existing washrooms Nos. 007 + 008; 022 + 023; 106 at Atkinson, York University
Apr 12, 2022 · 4700 KEELE ST - Building permit22 111380Closed
Proposal for interior alterations to existing restaurant space - York University Student Centre, Break Room #335
Apr 6, 2022 · 4700 KEELE ST - Building permit21 235912Permit Issued
Water Damage to the interior finishes, fire separations, and building envelope. Recommendations to return the structure to pre-loss conditions. Please refer to report and drawings.
Mar 31, 2022 · 56 FINE ARTS RD - Building permit22 118751Closed
Permit for demising wall Only to re-demise unit 002 and unit 003.Provide and build a new storage room and service corridor by re-demising Commercial Retail Unit 002 / 003. Revise and or provide new mechanical and electrical components where required. Patch and make good all areas disturbed by construction in adjacent commercial retail units and mall common areas.
Mar 30, 2022 · 4700 KEELE ST - Building permit22 110687Inspection
Interior fitting for a Group 'E' restaurant under 30 seats. Install new plumbing and ductwork.
Mar 22, 2022 · 4700 KEELE ST - Building permit21 127316Closed
Curtis Lecture Halls - York University
Feb 7, 2022 · 4700 KEELE ST - Zoning review19 264466 PSPClosedDec 20, 2021 · 4700 KEELE ST
- Building permit21 226478Closed
Proposal for interior alterations for office for existing university
Dec 1, 2021 · 4700 KEELE ST - Building permit21 143457Closed
To erect and display one illuminated wall sign.***SOBEY'S STADIUM***
Oct 5, 2021 · 4700 KEELE ST - Building permit21 215453Cancelled
Proposal for roof renovations. (stair area, main arena, and restaurant)
Sep 21, 2021 · 989 MURRAY ROSS PKWY - Building permit21 188651Permit Issued
Proposal for the main fire alarm control panel replacement & three (3) annunciators.
Sep 7, 2021 · 4700 KEELE ST - Building permit21 200795Closed
5 certified temporary tents - Overflow study areas to allow for Social Distancing1 - 30 'x 60', 1- 30' x 50' std pipe frame tents (certification #14-251051)3 - 20' x 40' std pipe frame tents (certification #14-251050) Two tents anchored with steel stakes and one tent anchored with concrete blocks. - York UniversityInstallation - August 19th - September 19th, 2021
Aug 20, 2021 · 4700 KEELE ST - Building permit21 199417Closed
Install 2 certified tents - COVID-19 Pop Up for York University primarily for returning students15m x 20m Hoecker Ridid Frame Tents (Cert#14-251055) Anchored with steel stakesInstalled August 22,, 2021 to September 17, 2021
Aug 17, 2021 · 4700 KEELE ST - Building permit21 177441Closed
Construct interior renovation of existing computer lab into an interactive learning classroom at the Stephen E Quinlan Builidng - 70 The Pond Rd
Jul 23, 2021 · 4700 KEELE ST - Building permit21 132349Revision Issued
REVISION - layout changes : see attached letterProposal for interior alterations to ground floor - Central Square Suite 103, York UniversityConvenience address is 115 Campus Walk
Jul 14, 2021 · 4700 KEELE ST - Building permit20 167116Closed
FS - Sprinkler Shop Drawing - To construct a new glass and steel entry vestibule/portico to existing York University - Dahdaleh Building, natural ventilation with perimeter floor heating
Jun 22, 2021 · 4700 KEELE ST - Development application21 173802 WET 07 SAClosed
Construct new one storey art gallery building with ground floor connection to existing Accolade East Building at York University.
Jun 21, 2021 · 4700 KEELE ST · City file - Building permit21 171248Closed
Install 2 certificed tents15m x 20m Hoecker Ridid Frame Tents (Cert#14-251055) Anchored with steel stakesInstalled June 17th - June 25th - to be used on Juen 22, 2021 (Covid Pop Up)
Jun 18, 2021 · 4700 KEELE ST - Building permit20 164263Closed
FS - Sprinkler Shop Drawing - INTERIOR ALTERATIONS TO SOUTH WING, GROUND FLOOR VARI HALL
Jun 8, 2021 · 4700 KEELE ST - Building permit21 142708Closed
Proposal for interior alterations to existing office space on the ground floor of an existing commercial building. Convenience address is 4850 Keele St.
May 18, 2021 · 4700 KEELE ST - Building permit20 203217Closed
REV01: Area of renovation functions as a single laboratory unit.
May 17, 2021 · 4700 KEELE ST - Building permit20 220258Closed
Plumbing - Proposal for interior alterations to renovate existing washrooms - Tait McKenzie Physical Education Centre. Convenience address is 1 Thompson Rd.
Apr 1, 2021 · 4700 KEELE ST - Building permit21 113376Permit Issued
Proposed installation of new sprinklers in an existing university building. *York University*
Mar 31, 2021 · 4700 KEELE ST - Building permit21 118742Closed
Plumbing - Interior alterations of existing academic offices and seminar room renovation of existing washrooms and building new accessible washroom - Department of Politics, Ross Bldg South - 6th floor
Mar 25, 2021 · 4700 KEELE ST - Building permit20 220337Inspection
Proposal for interior alterations to renovate existing washrooms - Norman Bethune CollegeConvenience address is 170 Campus Walk.
Mar 23, 2021 · 4700 KEELE ST - Building permit20 220313Inspection
Proposal for interior alterations to renovate existing washrooms - McLaughlin CollegeConvenience address is 77 McLaughlin Road.
Mar 23, 2021 · 4700 KEELE ST - Building permit20 220305Inspection
Proposal for interior alterations to renovate existing washrooms - Petrie Science and EngineeringConvenience address is 140 Campus Walk.
Mar 23, 2021 · 4700 KEELE ST - Building permit21 110202Permit Issued
Hydronic piping to Vivarium Aquariums Room 002 and 038
Mar 9, 2021 · 4700 KEELE ST - Building permit20 220293Inspection
Proposal for interior alterations to renovate existing washrooms - Scott LibraryConvenience address is 115 Campus Walk.
Mar 9, 2021 · 4700 KEELE ST - Building permit21 116957Inspection
Interior alterations to provide additional faculty offices - Bergeron Centre - York University Faculty of Engineering
Mar 1, 2021 · 4700 KEELE ST - Building permit20 220321Inspection
Proposal for interior alterations to renovate existing washrooms - Joan & Martin Goldfarb Centre for Fine Arts. Convenience address is 86 Fine Arts Road.
Feb 26, 2021 · 4700 KEELE ST - Building permit20 185036Closed
Conditional Permit - Site Services Related to 2 Eight-storey student residence: 85 THE POND RD (20 184518) and 115 HAYNES AVE (20 184568)
Feb 22, 2021 · 4700 KEELE ST - Building permit20 234692Permit Issued
Demolition of Cooling Tower #3, mechanical components and supporting structure to foundation.
Feb 2, 2021 · 4700 KEELE ST - Building permit20 198818Inspection
Proposal for interior alterations to lecture halls for existing university 115 Campus Walk (Ross Building)
Jan 19, 2021 · 4700 KEELE ST - Building permit20 220142Inspection
Proposal for renewal of the existing washroom - Winters College
Dec 7, 2020 · 4700 KEELE ST - Building permit20 220162Inspection
Proposal to renew the existing washroom - Vanier College
Dec 3, 2020 · 4700 KEELE ST - Building permit20 217001Closed
Proposal for interior alterations to 2nd floor offices of existing university
Dec 3, 2020 · 4700 KEELE ST - Building permit20 213019Permit Issued
Proposal for the upgrade of HVAC in the electrical room (Physical Resources Building - 10 Rideau Road)
Nov 24, 2020 · 4700 KEELE ST - Building permit20 214924Permit Issued
Proposal for interior alterations for new tenant "Pita Land" in an existing Restaurant 30 Seats or Less Unit CRU 1, scope of work includes minor plumbing modification.
Nov 20, 2020 · 4700 KEELE ST - Building permit20 144201Revision Issued
Rev 1: Fire Alarm Upgrades - Stand Alone PermitUpgrade the Fire Alarm System, replace existing notifier and sensor devices with new per drawings and specifications throughout entire building"Permit Revision #1 - Changes to Second Floor Tower of Atkinson College"Upgrade the Fire Alarm System, replace existing notifier and sensor devices with new per drawings and specifications throughout entire building. [Atkinson Faculty of Liberal & Professional Studies]
Nov 18, 2020 · 4700 KEELE ST - Building permit20 198824Inspection
Proposal for new barrier free accessible ramp for existing university 90 Vanier Lane (Stedman Lecture Halls)
Oct 23, 2020 · 4700 KEELE ST - Building permit20 198809Permit Issued
Proposal for new barrier free accessible ramp for existing university 125 Campus Walk (Curtis Lecture Halls)
Oct 23, 2020 · 4700 KEELE ST - Building permit20 202513Approved
Proposed Alternative Solution for the Omission of Standpipe System at York University Lions Dome
Oct 5, 2020 · 230 IAN MACDONALD BLVD - Zoning review20 194137 LTOClosedSep 16, 2020 · 4700 KEELE ST
- Building permit19 206469Closed
Part Permit - New air-supported dome structure on new synthetic turf field within the field of play at the existing York Lions Stadium.
Sep 16, 2020 · 230 IAN MACDONALD BLVD - Building permit20 171687Closed
Proposal for interior alterations to repair water damage in an existing mixed use building.Convenience address is 56 Fine Arts Rd
Sep 9, 2020 · 4700 KEELE ST - Building permit20 178463Approved
Proposal for an alternative solution for the orientation of the openings through the second to 4th floors. The proposed openings through the floors are oriented in a vertical configuration through the continuation of the 1 hour floor fire separation.
Aug 10, 2020 · 4700 KEELE ST - Zoning review18 266532 PRZClosedJul 14, 2020 · 4700 KEELE ST
- Building permit20 144187Closed
Fire Alarm Upgrades PermitUpdate interconnected fire alarm system in Stong and Bethune Colleges per consultants drawings and specifications.
Jun 3, 2020 · 4700 KEELE ST - Building permit20 135526Closed
HVAC upgrades to Farquharson Vivarium (Animal Care Unit). To alter current system to provide room specific temparture or humidity controls required by the researchers and the current infrastructure
Apr 30, 2020 · 4700 KEELE ST - Building permit20 121102Inspection
Proposal for interior alterations to the existing unit to provide new electrical, mechanical, plumbing, tiling, paint, drywall etc. for Aroma Espresso Bar in unit 22 of the existing multiple use building.
Apr 21, 2020 · 4700 KEELE ST - Building permit19 256349Closed
Proposed Interior Alterations to existing washroom renewal to Post-secondary academic at Keel Campus.
Mar 11, 2020 · 90 VANIER LANE - Zoning review20 115663 LTOClosedFeb 14, 2020 · 4700 KEELE ST
Showing the latest 200 of 902 records.
Check before you build
Zoning not in By-law 569-2013
Needs a closer lookThis lot is not covered by the citywide zoning by-law's map. It is probably still governed by a former municipal by-law, which this tool does not read yet.
Zoning By-law 569-2013
Lot facts
- Area
- 1,353,718 m²
- Frontage
- 1,001.8 mestimated, irregular lot
- Depth
- 1,789.3 mestimated, irregular lot
- Street
- Keele St
- Corner lot
- No
- Public lane
- None
- House footprint
- Not showna new house or demolition permit since the City's 3D survey
- Max height
- —
- Max lot coverage
- —
House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.
- 265 City trees in front of this lot. The City's street tree inventory lists 265 trees at this address: elm, american (77 cm), maple, norway (65 cm), maple, norway (63 cm). Diameter is the trunk at breast height. Source
Around this lot
- Minor variances approved
- —no decisions on file
- Garden suite permits
- 0
- Laneway suite permits
- 0
- Multiplex permits
- 0
- Development applications
- 1
Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 0 variance decisions: no more than at most Toronto houses (median 19).
Recent variance decisions in the same zone
- Minor varianceApproved
To construct two new 8-storey student housing buildings.
4700 KEELE ST · Mar 7, 2024 · 314 m away - Minor varianceApproved
To permit a reduction to the number of parking spaces required on the University Lands from 8,915 spaces to 7,500 spaces.
4700 KEELE ST · Oct 15, 2015 · 314 m away - Minor varianceApproved
This is an application to permit a reduction in the parking supply within the York University lands to accommodate the construction of a stadium, on-going Toronto - York Spadina Subway Extension construction and on-going transportation demand management initiatives of the University prior to the opening of the subway.
4700 KEELE ST · Jun 6, 2012 · 314 m away - Minor varianceApproved
This is an application to permit the construction of a new fire station on the above noted property.
4700 KEELE ST · Feb 17, 2010 · 314 m away - Minor varianceApproved
This is an application to permit the construction of a four (4) storey univrsity building (Life Science Building) on the above noted site.
4700 KEELE ST · Sep 16, 2009 · 314 m away
Latest activity nearby
- Building permit
Proposal for Annual re-inflation of air-supported Dome structure on existing turf field within existing York Lions Dome stadium.
230 IAN MACDONALD BLVD · Nov 9, 2026 · 169 m away - Building permit
Interior alterations to exist. washrooms including replacing fixtures, toilet partitions, plumbing, lighting, finishes, wall tiles, etc.
136 CAMPUS WALK · Apr 20, 2026 · 170 m away - Building permit
Proposed new air-supported dome structure on new synthetic turf field within the field of play at the existing York Lions Stadium.
230 IAN MACDONALD BLVD · May 21, 2025 · 169 m away - Building permit
Conversion of existing storeage room into a new locker room for the York Lions Football team.
230 IAN MACDONALD BLVD · Jun 28, 2022 · 169 m away - Building permit
Proposal for interior renovations to washrooms and interior finishes to improve accessibility.
76 WINTERS LANE · Jun 20, 2022 · 247 m away - Development application
City of Vaughan SIte Plan Control application for 2300 STEELES AVENUES WEST (DA.08.051). Proposal for 5 office buildings having a total gross floor area of 90, 419 square metres and a 5,349 square metre neighbourhood park block. The development will consist of two 8-storey office buildings fronting onto Steeles Avenue (Phase 2 and 3), 8 and 6 storey office buildings (Phases 4 and 5) fronting onto the future east-west road (Street "X"), and a future one-storey 1,263 square metre expansion (Phase 5) to the existing 4-storey office building located at the northwest corner of Steeles Avenue and Keele Street.
130 IAN MACDONALD BLVD · Jun 3, 2022 · 197 m away · City file - Building permit
Proposed Alternative Solution for the Omission of Standpipe System at York University Lions Dome
230 IAN MACDONALD BLVD · Oct 5, 2020 · 169 m away - Building permit
Part Permit - New air-supported dome structure on new synthetic turf field within the field of play at the existing York Lions Stadium.
230 IAN MACDONALD BLVD · Sep 16, 2020 · 169 m away - Building permit
Proposed Interior Alterations to existing washroom renewal to Post-secondary academic at Keel Campus.
90 VANIER LANE · Mar 11, 2020 · 191 m away - Building permit
Proposed Interior Alterations to existing washroom renewal to Post-secondary academic at (Vanier College)
76 WINTERS LANE · Feb 7, 2020 · 247 m away
Neighbourhood: York University Heights
About the area around the lot, not the lot itself.
- Nearest station
- Pioneer Village Station6 min walk
- Nearest TTC stop
- 230 Ian MacDonald Blvd3 min walk
- Nearest cycling route
- York U TrailMulti-Use Trail, 2 min walk
- Nearest traffic count
- 35,343 vehicles in 14 hSteeles Ave W / Howard Moscoe Way, 440 m away, Nov 5, 2024
- Serious collisions within 500 m
- 02021–2026, killed or seriously injured
- Parks
- 175 the Pond Road Park10 min walk
- Black Creek Parkland13 min walk
- Fred Young Park14 min walk
Schools within 1 km
- YORK U - KEELE CAMPUS University 5 min walk
- SENECA COLLEGE (SENECA AT YORK CAMPUS) College 11 min walk
Being near a school does not mean the lot is in its catchment; check with the board.
2021 Census
| Figure | York University Heights | Median neighbourhood |
|---|---|---|
| Median household income (2020) | $76,000 | $84,500 |
| Households that own their home | 47% | 54% |
| Population (2021) | 28,255 | 16,813 |
| Homes built in 1960 or before | 14% | 29% |
| Homes needing major repairs | 8% | 7% |
Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.
Police-reported crime, 2025
| Per 100,000 people | York University Heights | City median |
|---|---|---|
| Assault | 1274.1 | 636.3 |
| Robbery | 128 | 69.5 |
| Shootings | 11.9 | 10.5 |
| Auto theft | 634.1 | 192.6 |
| Theft over $5,000 | 178.6 | 46.1 |
| Break and enter | 375.1 | 172.8 |
| Theft from vehicles | 312.6 | 188.1 |
Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.