HousePrecheckCheck an address

470 Yonge StToronto · zoning, lot size and permit records

Also 472 Yonge St, 474 Yonge St, 476 Yonge St

Commercial residential · CR 3.0 (c2.0; r3.0) SS1 (x2253)30.4 × 38.7 m1,165 m²on Yonge Stcorner, also on Grenville Stbacks onto St Luke Lane

Not a home

A commercial or mixed-use building

4 different civic addresses share this parcel, in a commercial zone: shops, offices or a mixed-use building rather than one house. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Shops, offices or a mixed buildingCustomers, deliveries and evening activity; errands within a short walk.
  • Permits or applications open on this parcelStill open in the City's records: 11 323026 (Revision to recladding in existing restaurant greater than 30 seats. - Mc Donalds, 2013, status Revision Issued). Larger work can mean noise and trucks next door; read what each one is for.
  • 13 development applications open within 300 m, up to 80 storeysNew buildings may go up around here in the next years. More change nearby than at 100% of Toronto houses.
  • Major Transit Station Area: WellesleyThe City plans more homes around the station: good for transit, and more building over time.
N20 m
30.4 m frontage38.7 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • Building permit open since 2013

    Needs a closer look

    Still open in the City's records: 11 323026 (Revision to recladding in existing restaurant greater than 30 seats. - Mc Donalds, 2013, status Revision Issued).

    What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.

    How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)
  • 3 by-law investigations closed in the last two years

    Good to know

    Closed files (Order Issued Property Standards, Property Standards): 26 150275 PRS 00 IR (Property Standards, 2026); 25 135931 PRS 00 IV (Order Issued Property Standards: The (verandah, porch, deck, loading dock, ramp, balcon..., 2025); 25 134619 PRS 00 IR (Property Standards, 2025).

    What it means. Someone raised an issue here and the City closed the file. Ask the seller what it was about.

    City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations
  • 13 development applications open within 300 m

    Good to know

    13 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 80 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

29 records on file: more than at 100% of Toronto houses (median 0).

  • By-law investigation26 150275 PRS 00 IRClosed

    Property Standards

    Apr 26, 2026 · 470 YONGE ST
  • By-law investigation26 107780 WST 00 IRClosed

    Waste

    Jan 22, 2026 · 470 YONGE ST
  • By-law investigation25 135931 PRS 00 IVClosed

    Order Issued Property Standards: The (verandah, porch, deck, loading dock, ramp, balcony, fire escape or other similar structure, and/or other appurtenant attachment) and/or the supporting stru

    Mar 25, 2025 · 470 YONGE ST
  • By-law investigation25 134619 PRS 00 IRClosed

    Property Standards

    Mar 25, 2025 · 470 YONGE ST
  • Building permit24 245816Closed

    1 first party wall signApplication for a permit to erect and display one first party wall sign, displaying static copy and illuminated, erected at the first storey. Dimensions:Wall sign: 1.12m L x 5.33m W x 0.10m D at a height of 5.51 on the east elevation.**FLAMING KITCHEN**

    Dec 9, 2024 · 472 YONGE ST
  • Building permit23 107779Closed

    Proposal to increase the occupancy load of an existing restaurant from 30 to 60 seats. Related permit is 22 237741 BLD.Convenience address is 472 Yonge St

    May 5, 2023 · 470 YONGE ST
  • Building permit23 111097Closed

    RENO TO EXISTING TAIPEI BEEF NOODLE RESTAURANT

    Feb 28, 2023 · 474 YONGE ST
  • Building permit22 237741Closed

    Proposal for interior alterations to an existing restaurant, less than 30 seats.Convenience address is 472 Yonge St

    Jan 10, 2023 · 470 YONGE ST
Show 21 older records
  • Building permit19 124067Closed

    To erect and display one illuminated wall sign displaying static copy located on the first storey of the easterly elevation,measuring 4.78 m by 1.12 m at a height of 5.50 m. **BLACK BALL TEA HOUSE**

    Mar 25, 2019 · 470 YONGE ST
  • Building permit18 271266Closed

    Proposed interior alterations to existing retail space for tenant fit out of a restaurant containing 30 seats. 'BLACK BALL TEA HOUSE'

    Jan 22, 2019 · 470 YONGE ST
  • Zoning review18 265594 ZZUClosed
    Dec 6, 2018 · 472 YONGE ST
  • Building permit18 153400Closed

    Proposed interior alterations to convert an existing Menchies to a take-out restauramt *Taipei Beef Noodle*

    May 18, 2018 · 474 YONGE ST
  • Building permit17 207404Closed

    Proposal to install a 3/4 inch backflow prevention device. Convenience address is '474 Yonge Street'.

    Aug 22, 2017 · 470 YONGE ST
  • Building permit17 147505Closed

    Install one new Backflow Prevention Devices (Water only)

    May 17, 2017 · 470 YONGE ST
  • Building permit11 323026Revision Issued

    Revision to recladding in existing restaurant greater than 30 seats. - Mc Donalds.

    Jul 3, 2013 · 470 YONGE ST
  • Building permit13 151975Closed

    To erect and display one projecting sign and one wall sign on the easterly elevation of first storey. Signs are both illuminated and in conjunction with a retail wine store.**Wine Rack**

    May 14, 2013 · 470 YONGE ST
  • Building permit13 134070Closed

    Proposal for interior alterations to existing ground floor retail unit of existing multiple unit building "Wine Rack" (178.7m2) with a convenience address of 472 Yonge St.

    Apr 12, 2013 · 470 YONGE ST
  • Building permit12 296212Closed

    Proposal for interior alterations to vacant retail space - new tenant is "Menchies" Convienence Address is 474 Yonge St.

    Feb 6, 2013 · 470 YONGE ST
  • Building permit12 133285Closed

    To erect and display three wall signs and one projecting sign on the southerly and easterly elevation levels. Signs are all illuminated and static copy and in conjunction with a fast food restaurant.**McDonalds**

    Mar 7, 2012 · 470 YONGE ST
  • Building permit12 121858Closed

    Proposal to install floor drains in restaurant. Tenant is Mcdonalds.

    Feb 15, 2012 · 470 YONGE ST
  • Building permit12 121849Closed

    Proposed alteration to duct layout and diffusers. Tenant is Mcdonalds.

    Feb 15, 2012 · 470 YONGE ST
  • Building permit11 318384Closed

    HVAC - Interior alterations to ground floor and basement for new restaurant with 80 seats. Tenant - "Cha Lau". Convenience address - 476 Yonge St.

    Jan 12, 2012 · 470 YONGE ST
  • Zoning review11 277214 ZBACancelled
    Sep 19, 2011 · 470 YONGE ST
  • Zoning review10 151182 LTOClosed
    Apr 13, 2010 · 470 YONGE ST
  • Zoning review97 026304 LTOClosed
    May 7, 1997 · 470 YONGE ST
  • Zoning review94 024582 LTOClosed
    Feb 24, 1994 · 472 YONGE ST
  • Zoning review93 025763 LTOClosed
    Nov 5, 1993 · 470 YONGE ST
  • Zoning review93 025611 LTOClosed
    Oct 4, 1993 · 474 YONGE ST
  • Zoning review81 030626 LTOClosed
    Aug 31, 1981 · 474 YONGE ST

Check before you build

  • Site-specific exception 900.11.10(2253)

    Needs a closer look

    1 older by-law that still prevails applies to this lot. It can override the standard rules on this page.

    Zoning By-law 569-2013, Chapter 900
Exception 900.11.10(2253)Applies

These parts of the exception apply to this lot's address.

  1. Older by-law A

    Section 12(2) 260 of former City of Toronto By-law 438-86

1 part for other addresses
  • B On the even numbered addresses of 10-18 Grenville St., former City of Toronto by-law 681-92.
By-law 569-2013, Chapter 900

Lot facts

Area
1,165 m²
Frontage
30.4 m
Depth
38.7 m
Street
Yonge St
Corner lot
Yes, also on Grenville St38.7 m along it
Public lane
St Luke Lane, 36.8 m along it
House footprint
908 m²roof up to 13.5 m
Back yard
7.4 mhouse to rear lot line
Side yards
0 m and 0 mhouse to side lot lines; 0 is a shared wall
Buildings on the lot
1house, garage, sheds
Max height
18 m
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • Site and Area Specific Policy 382. The Official Plan has a policy for this site or area that varies the general rules. Read it before relying on zoning alone. Source
  • Major Transit Station Area: Wellesley. The lot is inside the Wellesley Major Transit Station Area approved by the Province (Site and Area Specific Policy 602). Source
  • Downtown Plan Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
  • Priority retail street: Yonge Street. The lot is on a priority retail street. In this zone at least 60% of the ground floor along that street must hold retail, restaurants, offices or similar uses, with entrances within 5 m of the lot line and 60% of the ground floor wall in windows or doors. Source
  • Downtown building setback overlay. Towers over 36 m here need extra setbacks above 24 m and 25 m between towers. Houses and other low buildings are not affected. Source
  • Zone CR 3.0 (c2.0; r3.0) SS1 (x2253) (Commercial Residential). Chapter 40, section 40.10 of the by-law. Source
  • 4 City trees in front of this lot. The City's street tree inventory lists 4 trees at this address: honey locust (40 cm), honey locust (40 cm), honey locust (22 cm). Diameter is the trunk at breast height. Source

Around this lot

Minor variances approved
100%15 of 15 decisions
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
1
Development applications
26

Within 300 m, last 10 years. 1 suite and multiplex permits: no more than at most Toronto houses (median 3). 15 variance decisions: no more than at most Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To permit the existing entertainment place of assembly (nightclub) use within the two-storey commercial building.

    508 CHURCH ST · Sep 9, 2026 · 341 m away
  • Minor varianceApproved

    To alter the development standards (as approved under Site Specific Zoning By-law 88-2023(OLT)) for the 40-storey mixed-use building (which is currently under construction), by increasing the residential gross floor area, building height (41-storeys; 123.5 m to 127.6 m and 129.2 m to 133.6 m), and the height of the elevator overrun projection. There will be a total of 516 residential dwelling units on this site.

    20 MAITLAND ST · Apr 1, 2026 · 239 m away
  • Minor varianceApproved

    To alter the development standards for the previously approved 32-storey and 46-storey, two-tower mixed-use, purpose built rental development with 30 Percent affordable dwelling units and a child care center (approved under Site Specific Zoning By-law 1096-2021), by redistributing the building heights to 33 and 41storeys, increasing podium setbacks, reducing street wall heights, reducing the size of podium to create two separate buildings connected only below grade, decreasing the amount of indoor amenity space, reducing the number of two or more bedroom units, eliminating the resident and non-residential parking requirements, and decreasing the amount of residential visitor spaces. Site plan control application 19 127591 STE 13 SA is under review.

    27 GROSVENOR ST · Jul 30, 2025 · 117 m away
  • Minor varianceApproved

    To alter the development standards for the 40-storey mixed-use building (as approved under Site Specific Zoning By-law 88-2023) by increasing the total number of residential dwelling units, the overall and residential gross floor area, the building height, and the maximum projection height of an elevator overrun. Also, to reduce the total number of residential dwelling units with 3 or more bedrooms, the required amenity space, and the total number of residential visitor parking spaces. The new 45-storey mixed-use building (excluding the mechanical penthouse) will have a total of 572 residential dwelling units, 78 residential parking spaces, and 7 residential visitor parking spaces. This is currently undergoing Site Plan Control (Application Number 19 240163 STE 13 SA).

    26 MAITLAND ST · Apr 23, 2025 · 252 m away
  • Minor varianceApproved

    To alter the development standards (as approved under Site Specific Zoning By-law 193-2024(OLT)), for a new 59-storey mixed-use building, by permitting a private student residence use on this lot. There will be a total of 587 residential dwelling units within this building.

    510 YONGE ST · Mar 19, 2025 · 131 m away

Latest activity nearby

  • Minor variancePending

    To alter the development standards for the previously approved two-tower mixed-use development (approved under Site Specific Zoning By-law 1096-2021), by reducing the height of a portion of the first storey (to include a mezzanine level located between the first and second storeys). There will be a total of 767 rental dwelling units (of which 30.4% (233 units) will be affordable rental units), as well as a childcare center on this lot. A related Site Plan Control application (under File Number 19 127591 STE 13 SA) has received Notice of Approval conditions.

    27 GROSVENOR ST · Nov 25, 2026 · 117 m away
  • Zoning review

    Closed

    450 YONGE ST · Nov 23, 2026 · 97 m away
  • Building permit

    Interior alterations for a new medical office - Toronto Endoscopy Clinic - Unit 700

    790 BAY ST · Nov 19, 2026 · 276 m away
  • Building permit

    Interior demolition to the 3rd and 4th floors.

    77 GRENVILLE ST · Nov 18, 2026 · 263 m away
  • Building permit

    Proposal for interior alterations to lobby, main corridor, bar & restaurant at ground floor.

    475 YONGE ST · Nov 17, 2026 · 75 m away
  • Building permit

    INTERIOR ALTERATIONS TO GROUND FLOOR VACANT COMMERCIAL UNIT 3 FOR PROPOSED COFFEE SHOP: 'DARKHORSE ESPRESSO'

    484 YONGE ST · Nov 16, 2026 · 39 m away
  • Building permit

    Interior alteration to combine an existing gym room and adjacent pool room into one fitness room.

    475 YONGE ST · Nov 10, 2026 · 75 m away
  • Building permit

    1 projecting sign**SHIRIN JAAN**

    508 YONGE ST · Nov 5, 2026 · 126 m away
  • Zoning review

    Closed

    879 BAY ST · Nov 4, 2026 · 201 m away
  • Building permit

    1 Wall Sign

    522 YONGE ST · Nov 2, 2026 · 158 m away

Neighbourhood: Bay-Cloverhill

About the area around the lot, not the lot itself.

Nearest station
College Station4 min walk
Nearest TTC stop
Yonge St at Alexander St1 min walk
Nearest cycling route
Bay StSharrows - Arterial - Connector, 3 min walk
Nearest traffic count
6,108 vehicles in 8 hYonge St / Grenville St, 40 m away, Mar 2, 2022
Serious collisions within 500 m
112021–2026, killed or seriously injured: 2 fatal, 7 with pedestrians, 2 with cyclists
Parks
Alexander Street Parkette2 min walk
Opera Place3 min walk
Dr. Lillian McGregor Park3 min walk

Schools within 1 km

  • THE YMCA ACADEMY SECONDARY SCHOOL Private 3 min walk
  • TAIE INTERNATIONAL INSTITUTE SCHOOL Private 6 min walk
  • CHURCH ST JR & NATIVE LEARNING CTR English Public 7 min walk
  • TORONTO METROPOLITAN UNIVERSITY - THEATRE SCHOOL University 7 min walk
  • NATIONAL BALLET SCHOOL - MAISON STAINES HOUSE & SALLE CURRIE HALL Private 7 min walk
  • ST JOSEPH'S COLLEGE SCHOOL English Separate 8 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureBay-CloverhillMedian neighbourhood
Median household income (2020)$58,400$84,500
Households that own their home30%54%
Population (2021)16,67016,813
Homes built in 1960 or before4%29%
Homes needing major repairs3%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleBay-CloverhillCity median
Assault601.9636.3
Robbery74.769.5
Auto theft16.6192.6
Theft over $5,00087.246.1
Break and enter286.4172.8
Theft from vehicles145.3188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
  • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.