Before you offer
From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.
Heritage property: designated (Part IV)
Needs a closer lookOn the City's Heritage Register. Demolition and exterior changes need heritage review.
What it means. Renovations, additions and demolition can take longer, cost more or be refused.
How to confirm. Heritage Planning at the City confirms the status and what it covers. Details
City of Toronto Heritage RegisterBuilding permit open since 2014
Needs a closer lookStill open in the City's records: 14 152302 (Proposal to replace the existing chilled water plant at St Michael's College (U of T bu..., 2014, status Permit Issued).
What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.
How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details
City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)1 development application open within 300 m
Good to know1 rezoning, site plan, subdivision or condominium application within 300 m, submitted in the last 10 years, is not closed yet, including buildings of up to 40 storeys. They are listed under Around this lot.
What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.
How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details
City of Toronto, Development Applications
Not in these records
- Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
- Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.
History of this lot
6 records on file: more than at 95% of Toronto houses (median 0).
- Building permit21 101985Closed
Proposal to erect and display a non-illuminated ground sign, displaying static copy along the north frontage.****UNIVERSITY OF ST MICHAEL'S COLLEGE****
Mar 26, 2021 · 47 QUEEN'S PARK CRES E - Building permit20 180515Closed
Install one new mean line full port Back Water Valve (Sewer only)
Oct 5, 2020 · 47 QUEEN'S PARK CRES E - Building permit15 155383Closed
Interior alterations to 4th floor of existing university building. University of St Michael's College (Allumni Hall - Slavic Department). Convenience address - 121 St Joseph St
May 15, 2015 · 47 QUEEN'S PARK CRES E - Building permit14 264982Closed
121 ST JOSEPH ST- Installation of Backflow Prevention Device for premise isolation.
Dec 22, 2014 · 47 QUEEN'S PARK CRES E - Building permit14 152302Permit Issued
Proposal to replace the existing chilled water plant at St Michael's College (U of T building). Convenience address is 161 St Joseph Street.
Nov 17, 2014 · 47 QUEEN'S PARK CRES E - Building permit14 195556Closed
121 ST JOSEPH ST- Installation of Backflow Prevention Device (Water only).
Sep 25, 2014 · 47 QUEEN'S PARK CRES E
Check before you build
Zoning not in By-law 569-2013
Needs a closer lookThis lot is not covered by the citywide zoning by-law's map. It is probably still governed by a former municipal by-law, which this tool does not read yet.
Zoning By-law 569-2013
Lot facts
- Area
- 5,176 m²
- Frontage
- 80.7 mestimated, irregular lot
- Depth
- 86.2 mestimated, irregular lot
- Street
- St Joseph St
- Corner lot
- Yes, also on Queen's Park Cres E86.2 m along it
- Public lane
- St Basil Lane, 7.3 m along it
- House footprint
- 968 m²roof up to 21.2 m
- Back yard
- 40.2 mhouse to rear lot line
- Side yards
- 4.8 m and 43.9 mhouse to side lot lines
- Buildings on the lot
- 7house, garage, sheds
- Max height
- —
- Max lot coverage
- —
House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.
- 3 City trees in front of this lot. The City's street tree inventory lists 3 trees at this address: oak, white (110 cm), maple, norway (20 cm), elm, princeton (8 cm). Diameter is the trunk at breast height. Source
Around this lot
- Minor variances approved
- 100%4 of 4 decisions
- Garden suite permits
- 0
- Laneway suite permits
- 0
- Multiplex permits
- 0
- Development applications
- 4
Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 4 variance decisions: no more than at most Toronto houses (median 19).
Recent variance decisions in the same zone
- Minor varianceApproved
To alter the development standards for the previously approved 32-storey and 46-storey, two-tower mixed-use, purpose built rental development with 30 Percent affordable dwelling units and a child care center (approved under Site Specific Zoning By-law 1096-2021), by redistributing the building heights to 33 and 41storeys, increasing podium setbacks, reducing street wall heights, reducing the size of podium to create two separate buildings connected only below grade, decreasing the amount of indoor amenity space, reducing the number of two or more bedroom units, eliminating the resident and non-residential parking requirements, and decreasing the amount of residential visitor spaces. Site plan control application 19 127591 STE 13 SA is under review.
27 GROSVENOR ST · Jul 30, 2025 · 456 m away - Minor varianceApproved
To alter the development standards (as approved under Site Specific Zoning By-law 193-2024(OLT)), for a new 59-storey mixed-use building, by permitting a private student residence use on this lot. There will be a total of 587 residential dwelling units within this building.
510 YONGE ST · Mar 19, 2025 · 496 m away - Minor varianceApproved
To alter the development standards (as approved under Site Specific Zoning By-Law 1422-2017), for the 40-storey mixed-use building by: increasing the podium height (from 3-storeys to 6-storeys); and altering building setbacks (in order to consolidate the non-residential institutional uses within the podium). No changes to the tower or residential uses are proposed. Also, to reduce the minimum required number of parking spaces for institutional uses (from 11 parking spaces to 5 parking spaces), which will be located within underground parking level P1.
70 ST MARY ST · Feb 26, 2025 · 310 m away - Minor varianceApproved
To alter the development standards for the site (as approved under Site Specific Zoning By-law 778-2016(OMB)), for the existing 44-storey mixed-use building, by constructing mezzanine space. Also, to convert the existing two-and-one-half-storey townhouses (located at the northeast corner on this lot, municipally known as 7 and 9 Gloucester Street) into mixed-use buildings, and to increase the non-residential gross floor areas.
593 YONGE ST · Nov 27, 2024 · 465 m away - Minor varianceApproved
To alter the development standards for the 32-storey and 46-storey, two-tower mixed-use development (approved under Site Specific Zoning By-Law 1096-2021), by extending the temporary use permission for an elevator, which has already been constructed, to provide loading access to the adjacent site at 25 Grosvenor Street for a further period of three years.
27 GROSVENOR ST · Nov 27, 2024 · 456 m away
Latest activity nearby
- Zoning review
Application Acceptable
95 ST JOSEPH ST · Nov 24, 2026 · 134 m away - Building permit
Proposed Hydro Vault Repairs
1001 BAY ST · Nov 13, 2026 · 264 m away - Building permit
Rev 01 - Proposed alterations to sprinkler system leve 3-14Proposal for sprinkler.
900 BAY ST · Nov 12, 2026 · 230 m away - Building permit
Proposal for sprinklers for Hearst Tower Level 8-11.
900 BAY ST · Nov 10, 2026 · 230 m away - Building permit
Proposal for sprinklers for Hepburn Tower Level 3-7.
900 BAY ST · Nov 10, 2026 · 230 m away - Building permit
Proposal for sprinklers for Hearst Tower Level 8-10.
900 BAY ST · Nov 9, 2026 · 230 m away - Building permit
Proposal for sprinklers for Hearst Tower Level 3-7.
900 BAY ST · Nov 9, 2026 · 230 m away - Building permit
REV 01: Fire separation revision of B2 level, interior alteration to B1 tenant storage area, Ground Floor 900 Bay Lobby layout revision.Proposed interior alterations - interior fit-out for following areas; Ground Floor 900 bay lobby (addition of 2 Security Desks, Secured Glazing and Turnstiles), 2nd floor Hearst lobby (to add relocated Conference Reception Desk), Basement 2 (addition of Pallet scanner and Parcel scanner area), and Basement 1( addition of 25 chain-link cages at Tenant Storage Room B1-042)
900 BAY ST · Nov 5, 2026 · 230 m away - Building permit
Revision 01 - Revision to project scope and construction phasing, including removal of Mowat Tower Levels 15 and 16 from the permit and addition of elevator lobby finish work for Levels 3 through 14Proposed Interior Fit-out to existing floors 3 to 16 (inclusive).
900 BAY ST · Oct 30, 2026 · 230 m away - Building permit
REV: Proposal for sprinkler.
900 BAY ST · Oct 29, 2026 · 230 m away
Neighbourhood: Bay-Cloverhill
About the area around the lot, not the lot itself.
- Nearest station
- Museum Station6 min walk
- Nearest TTC stop
- Wellesley St West at Queen's Park Cres East2 min walk
- Nearest cycling route
- Queen's Park CresCycle Track, 1 min walk
- Nearest traffic count
- 9,598 vehicles in 14 hQueen's Park Cres E / St Joseph St, 90 m away, Oct 15, 2025
- Serious collisions within 500 m
- 62021–2026, killed or seriously injured: 0 fatal, 3 with pedestrians, 1 with cyclists
- Parks
- Queen's Park1 min walk
- Clover Hill Park3 min walk
- Dr. Lillian McGregor Park5 min walk
Schools within 1 km
- TORONTO SCHOOL OF THEOLOGY - U OF T, BLDG 434 University 1 min walk
- ST JOSEPH'S COLLEGE SCHOOL English Separate 2 min walk
- THE YMCA ACADEMY SECONDARY SCHOOL Private 7 min walk
- ROSEDALE DAY SCHOOL Private 8 min walk
- MUNK SCHOOL OF GLOBAL AFFAIRS GRAHAM LIBRARY - U OF T, BLDG 12C University 9 min walk
- MUNK SCHOOL OF GLOBAL AFFAIRS AT TRINITY - U OF T, BLDG 12A University 9 min walk
Being near a school does not mean the lot is in its catchment; check with the board.
2021 Census
| Figure | Bay-Cloverhill | Median neighbourhood |
|---|---|---|
| Median household income (2020) | $58,400 | $84,500 |
| Households that own their home | 30% | 54% |
| Population (2021) | 16,670 | 16,813 |
| Homes built in 1960 or before | 4% | 29% |
| Homes needing major repairs | 3% | 7% |
Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.
Police-reported crime, 2025
| Per 100,000 people | Bay-Cloverhill | City median |
|---|---|---|
| Assault | 601.9 | 636.3 |
| Robbery | 74.7 | 69.5 |
| Auto theft | 16.6 | 192.6 |
| Theft over $5,000 | 87.2 | 46.1 |
| Break and enter | 286.4 | 172.8 |
| Theft from vehicles | 145.3 | 188.1 |
Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.