Everything here comes from public records: City of Toronto open data, TRCA and Statistics Canada, 15 sets in all. Each item leads to the record it comes from. Our sources
This house at a glance
Each score from 0 to 10: 0 needs attention, 10 all clear. Build potential is how much more you could add.
About 460 Yonge St
460 Yonge St is on a 7.4 m by 9.8 m lot on Yonge St in Bay-Cloverhill. This lot is not covered by Toronto's city-wide zoning by-law 569-2013, so a by-law of the former city or borough most likely still applies. Toronto Building can confirm which one. The lot also fronts Grenville St.
The City has 23 records on this lot since 1997. That is more than at 99% of Toronto houses. In 2019, a building permit was filed: "Proposal to install 2 maglocks on 3rd floor of existing multi use building". Status: closed. In 2018, a building permit was filed: "Proposal to install 3 electromagnetic locks 1 on the 5th floor and 2 on the 61st floor of the building". Status: closed. In 2015, a building permit was filed: "Proposing to use stainless steel piping with welded stainless steel fittings". Status: approved. Nothing on file is open right now.
Within 300 m, 16 development applications are open (the tallest up to 80 storeys). Within 300 m, the Committee of Adjustment decided 15 minor variance applications in the last 10 years and approved 100%. College station is a 3-minute walk.
Summary
What the City's records show on this house
- Zoning not in By-law 569-2013Moderate
- 16 development applications open within 300 mLowFree check
Left unchecked, any of these can mean unexpected costs, trouble after closing, or plans you can't carry out. Found before you offer, they give you room to negotiate. The full report explains what each one means for this house and what to do next.
15 sets of public records, already checked for you. Searching each one yourself and working out what it means for you takes time. We have done that work: what matters about this house and lot, in plain English, in a few minutes.
What to find out first
1 thing to check before you offer.
What to find out before an offer, the steps to take, what each costs and how long it takesUnlock
Open City files
How much in the City's records needs answers before an offer
- No open orders or by-law investigations
- No permits left open for years
- No work or applications in progress
What this part means for this house, in plain EnglishUnlock
City files on this lot
23 records on file, more than at 99% of Toronto houses (median 0 records).
| Date | Record | As the City filed it | In plain words | Status |
|---|---|---|---|---|
| 2026-04-23 | By-law investigation26 152035 WST 00 IV | Notice Issued Waste: Owner of land failed to clean and clear refuse that has been thrown, placed, dumped or deposited, including but not limited to | Closed | |
| 2026-04-23 | By-law investigation26 148616 WST 00 IR | Waste | Closed | |
| 2019-06-18 | Building permit19 172841 | Proposal to install 2 maglocks on 3rd floor of existing multi use building | Closed | |
| 2018-10-22 | Building permit18 244745 | Proposal to install 3 Electromagnetic Locks 1 on the 5th floor and 2 on the 61st floor of the building. | Closed | |
| 2015-08-07 | Building permit15 203387 | Proposing to use stainless steel piping with welded stainless steel fittings | Approved | |
| 2015-01-29 | Building permit14 186513 | Conditional Permit - Part Permit - Proposal to construct a 60 sty condo with 636 residential units, commercial at grade and 3rd floor, and 5 levels of below grade parking. | Cancelled | |
| 2014-09-09 | Zoning review11 302426 PSP | No description on file | Closed | |
| 2011-10-20 | Development application11 296426 STE 27 OZ | Rezoning application to permit the redevelopment of the lands for a new mixed use building. First submission (October 14, 2011) included a tower of 60 storey (207 metre including mechanical penthouse) in height with 3 levels of commercial/office space, 599 residential units above and 196 parking spaces in a below grade parking structure and typical floorplate of 709 sq.m.. Second submission (April 2013) revision includes same tower height, increase in units to 660, increase in total amenity space, increase in the amount of bicycle parking from 608 to 670 spaces and vehicular parking from 196 to 217 spaces and typical floorplate of 769 sq.m. By-law 2013-1724 | Closed | |
| 2011-10-20 | Development application11 296431 STE 27 SA | Site Plan Approval application to permit the redevelopment of the lands for a new mixed use building 60 stories in height complete with 3 levels of commercial/office space, 636 residential units, 159 vehicular parking spaces and typical floorplate of 769 sq.m. | Closed | |
| 2005-11-28 | Zoning review05 206049 LTO | No description on file | Closed | |
| 2005-10-21 | Zoning review05 195887 LTO | No description on file | Closed | |
| 2005-08-02 | Building permit05 156141 | New kitchen exhaust. BLD permit # 05 156131 | Closed | |
| 2005-08-02 | Building permit05 156131 | Interior alterations to existing ground floor. Convenience address 454 Yonge St. | Closed | |
| 2005-07-15 | Building permit05 159603 | Adding two fire alarm devices and one bell to be connected to existing fire alarm system | Closed | |
| 2005-02-03 | Building permit05 106435 | Interior alterations to offices on 2nd floor | Closed | |
| 2004-05-14 | Building permit04 131181 | Make interior alterations to existing restaurant; no change in seating; in connection with #04-131188 MSA. | Closed | |
| 2004-05-10 | Building permit04 131188 | Install special ventilation system for DSA; in connection with #04-131181 BLD. | Closed | |
| 2001-07-13 | Building permit01 149180 | alter storefront (addition); remove non-loadbearing wall on ground floor to make into 1 restaurant. increase seating to 100 seats. tenant: hoops sports bar and grille. health dept. approval in file. | Closed | |
| 1999-03-16 | Building permit99 014126 | MAKE INTERIOR ALTERS TO 1ST FLOOR OFFICES - ERECT PARTITIONS (468 YONGE IS CONVENIENCE ADDRESS) AREA 37.16 M2 (FEE COLLECTED $120.77) TENANT: ROYAL BANK (W24)/SP "CALL WHEN READY" | Closed | |
| 1998-06-03 | Building permit98 016262 | REMOVE CONVENIENCE STAIRS FROM 1ST TO 2ND FLOOR AND INSTALL NEW ELEVATOR IN ITS PLACE. ALSO INSTALL NEW STAIRS FROM 1ST FLOOR TO BASEMENT AND MAKE INTERIOR ALTERATIONS. CONVENIENCE ADDRESS: 464 YONGE ST EDC | Closed | |
| 1998-01-22 | Zoning review98 025554 LTO | No description on file | Closed | |
| 1997-03-13 | Building permit97 013989 | H.V.A.C. INSTALL KITCHEN EXHAUST ON GROUND FLOOR RESTAURANT. TENANT: STEAK-OUT. EDC SEE 395084 | Closed | |
| 1997-02-25 | Building permit97 013284 | MAKE INTERIOR ALTERATIONS ON 1ST FLOOR FOR RESTAURANT PURPOSES. BP MAXIMUM NUMBER OF SEATS ALLOWED IS 30 | Closed |
Restrictions
How much heritage, nature and site-specific rules limit changes to the house
- Zoning not in By-law 569-2013
- No heritage listing or designation
What this part means for this house, in plain EnglishUnlock
Zoning not in By-law 569-2013
ModerateCheck before you offerWhat the record shows, what it means for you and what to doUnlock
Flood and erosion rules
How much of the lot lies in the areas TRCA regulates for flooding and erosion
- Outside the areas TRCA regulates
From TRCA's regulated areas only. Basement flooding, sewer back-up and the TRCA flood plain are not in this score yet; ask the seller and your insurer about water in the basement.
What this part means for this house, in plain EnglishUnlock
Build potential
How much more the rules allow on this lot, beyond what is on record
What this part means for this house, in plain EnglishUnlock
The lot and what the rules allow
- Zone
- —
- Height limit
- —
- Corner lot
- Yes, also on Grenville St
- Public lane
- None
- House footprint
- 25 m²
- Back yard
- 0 m
- Buildings on the lot
- 3
House and yards from the City's 3D Massing; a survey gives exact figures.
What you can build
Why, measured on this lot, and the most you could buildUnlock
Building nearby
How much neighbours are building and applying to change within 300 m
- 16 development applications open within 300 m, up to 80 storeys
- 1 suite and multiplex permits within 300 m in 10 years
- 15 minor variance decisions within 300 m, 100% approved
What this part means for this house, in plain EnglishUnlock
16 development applications open within 300 m
LowCheck if it appliesSee the next door check for this house
What the record shows, what it means for you and what to doUnlock
What this means: Committee of Adjustment
What the City allowed next door
Within 500 m, last 10 years: a guide if you plan to build or apply for something similar.
What neighbours have built and changed around you, and how the City decidedUnlock
Area safety
Police-reported crime in the neighbourhood against the Toronto median
- Lower than the Toronto median in 3 of 6 categories
- Theft over $5,000: 1.9 times the Toronto median
- Break and enter: 1.7 times the Toronto median
Neighbourhood rates per 100,000 people from the Toronto Police Service, not this street.
What this part means for this house, in plain EnglishUnlock
Bay-Cloverhill neighbourhood
About the area, not this house.
2021 Census, against the median Toronto neighbourhood
Getting around and schools
- College StationNearest station3 min walk
- Yonge St at Carlton St North Side - College StationNearest TTC stop1 min walk
- Bay StNearest cycling route3 min walk
- The YMCA Academy Secondary SchoolSchool3 min walk
- Taie International Institute SchoolSchool6 min walk
- Toronto Metropolitan University - Theatre SchoolSchool6 min walk
- Church St Jr & Native Learning CtrSchool7 min walk
Police-reported crime, 2025, per 100,000 people
- Assaultcity median 636.3601.9
- Robberycity median 69.574.7
- Auto theftcity median 192.616.6
- Theft over $5,000city median 46.187.2
- Break and entercity median 172.8286.4
- Theft from vehiclescity median 188.1145.3
What we checked, and what the City's records don't cover
We checked 48 sets of City of Toronto, TRCA and Statistics Canada open data for this address, last updated Nov 27, 2026. Our records don't cover flooding history, ownership and mortgages, or the condition of the house: ask the seller and your insurer about water in the basement, your lawyer about title, and book a home inspection.
See every source and when we loaded it · Pre-offer checklist