HousePrecheckCheck an address

460 Eglinton Ave EToronto · zoning, lot size and permit records

Residential · R (f9.0; d2.0) (x942)38.2 × 56.7 m2,150 m²on Eglinton Ave Ecorner, also on Marmot St

Not a single house

A rental apartment building

The City's RentSafeTO program evaluates this building as a rental apartment building (three storeys and ten units or more). Build options for a house do not apply.

Looking at a house nearby? What this means for you

  • 6 storeys, 72 rental units, built 1959More people, cars and deliveries than a street of houses alone. A tall building also shades the lots to its north.
  • 5 development applications open within 300 m, up to 25 storeysNew buildings may go up around here in the next years. More change nearby than at 96% of Toronto houses.
  • City upkeep score: 95 out of 100RentSafeTO rates common areas, building systems and records. A low score can show from the street.
  • Major Transit Station Area: Mount PleasantThe City plans more homes around the station: good for transit, and more building over time.

Want to check this building before you buy?

We are building checks for apartment buildings. Leave your email and we will tell you when it is ready.

N20 m
38.2 m frontage56.7 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • 4 by-law investigations closed in the last two years

    Good to know

    Closed files (Adequate Heat, Order Issued Property Standards, Property Standards): 26 218494 PRS 00 IV (Order Issued Property Standards: Dwelling unit window that is capable of being opened h..., 2026); 26 218457 PRS 00 IR (Property Standards, 2026); 26 170744 000 00 IR (Adequate Heat, 2026); and 1 more.

    What it means. Someone raised an issue here and the City closed the file. Ask the seller what it was about.

    City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations
  • 5 development applications open within 300 m

    Good to know

    5 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 25 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications
  • Rental building evaluation: 95 out of 100

    Good to know

    The City's RentSafeTO program evaluated this rental building in 2026 (6 storeys, 72 units, built 1959).

    What it means. The score covers common areas, building systems and records. Read the evaluation details for the items that scored low.

    How to confirm. The City's RentSafeTO page has the evaluation results and any open orders for the building. Details

    City of Toronto, RentSafeTO Apartment Building Evaluations

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

7 records on file: more than at 97% of Toronto houses (median 0).

  • By-law investigation26 218494 PRS 00 IVClosed

    Order Issued Property Standards: Dwelling unit window that is capable of being opened has screen that is not maintained in good repair and free from defects or missing components.Namely: Units ; In a dwelling unit, a window located more than 2,000 millimetres above grade opens within 1,500 millimetres of the floor not leading to a balcony does not emplo

    Aug 12, 2026 · 460 EGLINTON AVE E
  • By-law investigation26 218457 PRS 00 IRClosed

    Property Standards

    Aug 12, 2026 · 460 EGLINTON AVE E
  • By-law investigation26 170744 000 00 IRClosed

    Adequate Heat

    Jun 1, 2026 · 460 EGLINTON AVE E
  • By-law investigation26 170743 000 00 IRClosed

    Property Standards

    Jun 1, 2026 · 460 EGLINTON AVE E
  • Building permit09 165794Closed

    Proposal to install a back flow preventor in existing apartment building.

    Nov 13, 2009 · 460 EGLINTON AVE E
  • Building permit03 122129Closed

    Replace existing balcony gaurds on 48 units. APPLICANT TO SUBMIT ELEVATIONS AND SITE PLAN. AO 04/08/03

    Apr 17, 2003 · 460 EGLINTON AVE E
  • Building permit96 015358Closed

    CARRY OUT REMEDIAL WORK TO COMPLY WITH RETROFIT PROVISIONS OF THE FIRE CODE. EDC

    May 7, 1996 · 460 EGLINTON AVE E

Check before you build

  • Site-specific exception 900.2.10(942)

    Needs a closer look

    A Chapter 900 exception applies here, but its text was not found in the City's consolidation of the by-law. Read it before relying on the rest of this page.

    Zoning By-law 569-2013, Chapter 900
Exception 900.2.10(942)Check

The exception text was not found in the City's consolidation.

Lot facts

Area
2,150 m²
Frontage
38.2 m
Depth
56.7 m
Street
Eglinton Ave E
Corner lot
Yes, also on Marmot St56.7 m along it
Public lane
None
House footprint
986 m²roof up to 25.1 m
Back yard
1.6 mhouse to rear lot line
Side yards
3 m and 6 mhouse to side lot lines
Buildings on the lot
3house, garage, sheds
Max height
18 m
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • Major Transit Station Area: Mount Pleasant. The lot is inside the Mount Pleasant Major Transit Station Area approved by the Province (Site and Area Specific Policy 680). Source
  • Yonge-Eglinton Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
  • Minimum frontage 9 m. Frontage is about 38.2 m: meets the zone minimum. Source
  • Zone R (f9.0; d2.0) (x942) (Residential). Chapter 10, section 10.10 of the by-law. Source
  • 1 City tree in front of this lot. The City's street tree inventory lists 1 tree at this address: ash, white (27 cm). Diameter is the trunk at breast height. Source

Around this lot

Minor variances approved
95%38 of 40 decisions
Garden suite permits
3
Laneway suite permits
1
Multiplex permits
1
Development applications
11

Within 300 m, last 10 years. 5 suite and multiplex permits: more than at 59% of Toronto houses (median 3). 40 variance decisions: more than at 75% of Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To alter the existing two-storey detached dwelling by constructing a two-storey rear addition and a new rear deck.

    44 FAIRFIELD RD · Sep 17, 2026 · 222 m away
  • Minor varianceApproved

    To construct a three-storey apartment building containing six (6) dwelling units.

    406 ROEHAMPTON AVE · Sep 17, 2026 · 178 m away
  • Minor varianceApproved

    To construct an ancillary building (cabana) in the rear yard.

    32 BANFF RD · Jul 23, 2026 · 247 m away
  • Minor varianceApproved

    To construct a two-storey detached dwelling and alter the use of the existing ancillary structure(garage) at the rear yard of the property.

    44 BANFF RD · Dec 4, 2025 · 213 m away
  • Minor varianceApproved

    To alter the existing detached dwelling by constructing a ground floor addition and a second storey addition.

    61 BANFF RD · Nov 6, 2025 · 220 m away

Latest activity nearby

  • Building permit

    PROPOSED TWO-STOREY REAR ADDITION AND ATTACHED GARAGE TO EXISTING DETACHED DWELLING

    44 FAIRFIELD RD · Nov 24, 2026 · 222 m away
  • Building permit

    Interior Alterations on ground Floor

    56 PETMAN AVE · Nov 18, 2026 · 191 m away
  • Building permit

    Proposed interior alterations on all levels of the existing residential builidng including the enclosure of the existing porch.

    23 FAIRFIELD RD · Nov 18, 2026 · 285 m away
  • Building permit

    REVISION-01: To remove load bearing wall and install beam at kitchen/dining.Proposal for repairs to skylight and localized reinstatement of interior finishes to match pre-loss conditions

    43 CARDIFF RD · Nov 12, 2026 · 188 m away
  • Building permit

    THE PROPOSAL IS TO CONSTRUCT A NEW CABANA WITH A PERGOLA AND INTERLOCK PATIO IN THE REAR YARD OF AN EXISTING DWELLING.

    32 BANFF RD · Nov 5, 2026 · 247 m away
  • Building permitnew building, new house, secondary suite

    Proposal to demolish existing house and construct a new two-storey, two-unit detached dwelling with an attached garage.

    134 BANFF RD · Oct 26, 2026 · 140 m away
  • Building permit

    install a back water valve

    31 PETMAN AVE · Sep 24, 2026 · 238 m away
  • Minor varianceApproved

    To construct a three-storey apartment building containing six (6) dwelling units.

    406 ROEHAMPTON AVE · Sep 17, 2026 · 178 m away
  • Minor varianceApproved

    To alter the existing two-storey detached dwelling by constructing a two-storey rear addition and a new rear deck.

    44 FAIRFIELD RD · Sep 17, 2026 · 222 m away
  • Zoning review

    Closed

    55 BANFF RD · Sep 11, 2026 · 231 m away

Neighbourhood: Mount Pleasant East

About the area around the lot, not the lot itself.

Nearest station
Mount Pleasant Station9 min walk
Nearest TTC stop
Eglinton Ave East at Banff Rd2 min walk
Nearest cycling route
Broadway AveSigned Route (No Pavement Markings), 4 min walk
Nearest traffic count
23,197 vehicles in 14 hEglinton Ave E / Banff Rd, 150 m away, May 6, 2025
Serious collisions within 500 m
02021–2026, killed or seriously injured
Parks
Charlotte Maher Park5 min walk
Cudmore Creek Park8 min walk
Broadway Avenue Parkette9 min walk

Schools within 1 km

  • TORONTO STEM SCHOOL Private 6 min walk
  • NORTHERN SECONDARY SCHOOL English Public 8 min walk
  • EGLINTON JR PUBLIC SCHOOL English Public 10 min walk
  • MANOR MONTESSORI SCHOOL - MT PLEASANT Private 10 min walk
  • MAURICE CODY JR PUBLIC SCHOOL English Public 13 min walk
  • WILLOWDALE HIGH SCHOOL Private 13 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureMount Pleasant EastMedian neighbourhood
Median household income (2020)$110,000$84,500
Households that own their home55%54%
Population (2021)16,37016,813
Homes built in 1960 or before52%29%
Homes needing major repairs5%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleMount Pleasant EastCity median
Assault336.5636.3
Robbery10.269.5
Auto theft224.4192.6
Theft over $5,00045.946.1
Break and enter204172.8
Theft from vehicles107.1188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
  • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.