HousePrecheckCheck an address

4595 Dundas St WToronto · zoning, lot size and permit records

UT≈ 59.4 × 923.0 m27,474 m²on Dundas St Wcorner, also on Montgomery Rd

Not a home

Hydro Corridor - The Queensway & Park Lawn Rd

The City of Toronto's real estate inventory lists Hydro Corridor - The Queensway & Park Lawn Rd here, on City land in City use. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Green space next doorShade, play and walks; busy parks also bring events and evening noise.
  • Permits or applications open on this parcelRecent records on this lot: 26 182426 (REV02: Proposed revision to electrical building and RTU equipment relocation including..., 2026). Larger work can mean noise and trucks next door; read what each one is for.
  • No development applications within 300 m in 10 yearsA quiet stretch for new building, by the City's records.
N50 m
≈ 59.4 m frontage≈ 923.0 m deepirregular lot, estimated

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • Natural Heritage System (92% of lot)

    Good to know

    Part of the lot is in the Natural Heritage System shown on Official Plan Map 9.

    What it means. New buildings or additions in that part need a natural heritage impact study.

    How to confirm. City Planning confirms the policies that apply. Details

    City of Toronto Official Plan, Map 9
  • 1 by-law investigation closed in the last two years

    Good to know

    Closed files (Zoning): 26 225385 ZON 00 IR (Zoning, 2026).

    What it means. Someone raised an issue here and the City closed the file. Ask the seller what it was about.

    City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations
  • Work or applications in progress

    Good to know

    Recent records on this lot: 26 182426 (REV02: Proposed revision to electrical building and RTU equipment relocation including..., 2026).

    What it means. The owner has planned or started work. Ask what it covers, whether it will be finished before closing, and who pays for what is left.

    How to confirm. Application details and decisions are in the City's Application Information Centre. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards); City of Toronto, Development Applications
  • 3 Committee of Adjustment files on this lot

    Good to know

    2 approved. A0150/25EYK (To permit an offsite vehicle depot/parking lot on hydro lands for properties located at..., 2025); A293/16EYK (To use a portion of the Hydro Corridor for vehicular parking and outside storage in ass..., 2016); B57/08EYK (To create an ingress/egress right-of-way in favour of 98 Index Road and 150 North Queen..., 2008).

    What it means. Approved variances and consents stay with the property, including any conditions in the decision. They allow what was approved, not more.

    How to confirm. Decisions are in the Application Information Centre; older files are available from the Committee of Adjustment office. Details

    City of Toronto, Committee of Adjustment applications (2001 onwards)

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

23 records on file: more than at 100% of Toronto houses (median 0).

  • Building permit26 182426Revision Issued

    REV02: Proposed revision to electrical building and RTU equipment relocation including the re-routing of the incoming Toronto Hydro service (3-Phase) to the new buildingREV:Proposal for electrical building and RTU equipment relocation including the re-routing of the incoming Toronto Hydro service (3-Phase) to the new building.

    Sep 11, 2026 · 4595 DUNDAS ST W
  • By-law investigation26 235303 WST 00 IRClosed

    Waste

    Sep 10, 2026 · 4595 DUNDAS ST W
  • By-law investigation26 225385 ZON 00 IRClosed

    Zoning

    Aug 25, 2026 · 4595 DUNDAS ST W
  • By-law investigation26 151193 WST 00 IRClosed

    Waste

    Apr 28, 2026 · 4595 DUNDAS ST W
  • Building permit25 220723Cancelled

    Proposal to replace boiler and piping elements.

    Sep 5, 2025 · 4595 DUNDAS ST W
  • Minor varianceA0150/25EYKPending

    To permit an offsite vehicle depot/parking lot on hydro lands for properties located at 147 Belfield Road and 115 City View Drive.

    Apr 8, 2025 · 4595 DUNDAS ST W
  • Zoning review24 204740 ZAPNotice Sent
    Aug 28, 2024 · 4595 DUNDAS ST W
  • Zoning review23 181192 ZAPCancelled
    Jul 28, 2023 · 4595 DUNDAS ST W
Show 15 older records
  • Zoning review22 139699 ZAPCancelled
    Apr 28, 2022 · 4595 DUNDAS ST W
  • Zoning review22 136665 ZAPClosed
    Apr 21, 2022 · 4595 DUNDAS ST W
  • Zoning review20 155213 ZPRClosed
    Jun 11, 2020 · 4595 DUNDAS ST W
  • Zoning review19 193925 ZZUClosed
    Jul 23, 2019 · 4595 DUNDAS ST W
  • Zoning review18 261083 ZPRClosed
    Nov 26, 2018 · 4595 DUNDAS ST W
  • Zoning review17 161139 ZPRClosed
    May 16, 2017 · 4595 DUNDAS ST W
  • Building permit17 100912Closed

    In conjunction with a two storey building on the premises, proposal to erect and display four illuminated wall signs, all containing static copy on the first storey west, south and east elevations. Two of the proposed wall signs are 0.76 metres vertically by 3.96 metres horizontally. One of the proposed wall signs is 0.91 metres vertically by 2.13 metres horizontally. One of the proposed wall signs is 1.21 metres vertically by 8.22 metres horizontally.**GUARDIAN**

    Feb 23, 2017 · 4595 DUNDAS ST W
  • Minor varianceA293/16EYKApproved

    To use a portion of the Hydro Corridor for vehicular parking and outside storage in association with the property at 24 Bethridge Road.

    Jun 9, 2016 · 4595 DUNDAS ST W
  • Zoning review15 134156 PSPClosed
    Apr 2, 2015 · 4595 DUNDAS ST W
  • Zoning review14 257300 ZPRClosed
    Nov 27, 2014 · 4595 DUNDAS ST W
  • Zoning review14 159222 ZPRClosed
    May 21, 2014 · 4595 DUNDAS ST W
  • Zoning review11 218580 ZPRClosed
    Jun 14, 2011 · 4595 DUNDAS ST W
  • Zoning review10 116182 ZPRClosed
    Feb 9, 2010 · 4595 DUNDAS ST W
  • Zoning review10 104190 ZPUClosed
    Jan 13, 2010 · 4595 DUNDAS ST W
  • Consent (lot split)B57/08EYKApproved with conditions

    To create an ingress/egress right-of-way in favour of 98 Index Road and 150 North Queen Street.

    Sep 18, 2008 · 4595 DUNDAS ST W

Lot facts

Area
27,474 m²
Frontage
59.4 mestimated, irregular lot
Depth
923 mestimated, irregular lot
Street
Dundas St W
Corner lot
Yes, also on Montgomery Rd923 m along it
Public lane
None
Max height
—
Max lot coverage
—
  • Zone UT (Utility and Transportation). Chapter 100, section 100.10 of the by-law. Source

Around this lot

Minor variances approved
91%43 of 47 decisions
Garden suite permits
1
Laneway suite permits
0
Multiplex permits
1
Development applications
0

Within 300 m, last 10 years. 2 suite and multiplex permits: no more than at most Toronto houses (median 3). 47 variance decisions: more than at 82% of Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To use a portion of the Hydro Corridor for vehicular parking and outside storage in association with the property at 24 Bethridge Road.

    4595 DUNDAS ST W · Jun 9, 2016 · 381 m away

Latest activity nearby

  • Building permit

    REV 01: Addition of a skylight, increasing the height of the basement windows, and changing the unexcavated area below the new addition to a heated crawl space.Rear addition to the main floor and secondf floor, a rear deck and interior alterations.

    34 KINGSGROVE BLVD · Nov 9, 2026 · 163 m away
  • Building permit

    REVISION 01: To permit 26 213382 BLD 00 SRProposal for Interior alterations: - first floor 91 m² - Rear extension first floor: 129.50 m².Rear extension, basement floor: 129.50 m². Underpinning 18.36 metres.

    7 ELMVIEW CRT · Nov 4, 2026 · 62 m away
  • Zoning review

    Notice Sent

    50 OLD OAK RD · Oct 23, 2026 · 294 m away
  • Minor varianceRefused

    To construct a new garden suite in the rear yard.

    5 OLD OAK RD · Oct 8, 2026 · 295 m away
  • Building permit

    Drain - REAR TWO-STOREY ADDITION (63.4 SQ.M) AND INTERIOR ALTERATION (21.8 SQ.M) TO THE EXISTING TWO-STOREY DWELLING.

    14 HIGHGATE RD · Sep 4, 2026 · 281 m away
  • Building permit

    Proposal for constructing a covered front porch on the existing basement

    69 ALLANBROOKE DR · Aug 19, 2026 · 131 m away
  • Building permit

    Proposal for rebuildling Garage with partial existing walls and foundation to remain

    48 ALLANBROOKE DR · Jul 31, 2026 · 200 m away
  • Building permitmultiplex, secondary suite

    PROPOSED 3 UNIT DETACHED DWELLING WITH ADDITION TO GROUND FLOOR LEVEL AT FRONT AND SIDE, AND FULL SECOND FLOOR ADDITION, NEW FRONT PORCH AND SIDE PORCH, AND WALKOUT STAIRS AT REAR.

    43 OLD OAK RD · Jul 17, 2026 · 263 m away
  • Building permit

    Proposed deck

    28 OLD OAK RD · Jun 18, 2026 · 288 m away
  • Zoning review

    Closed

    48 ALLANBROOKE DR · Jun 4, 2026 · 200 m away

Neighbourhood: Kingsway South

About the area around the lot, not the lot itself.

Nearest station
Royal York Station15 min walk
Nearest TTC stop
Royal York Rd at Kingsgrove Blvd6 min walk
Nearest cycling route
Royal York RdSharrows - Arterial - Connector, 6 min walk
Nearest traffic count
11,014 vehicles in 8 hRoyal York Rd / Usher Ave, 370 m away, Feb 9, 2004
Serious collisions within 500 m
32021–2026, killed or seriously injured: 1 fatal, 0 with pedestrians, 0 with cyclists
Parks
Donnybrook Park2 min walk
Humbertown Park6 min walk
Tom Riley Park8 min walk

Schools within 1 km

  • KINGSWAY COLLEGE SCHOOL Private 7 min walk
  • ETOBICOKE COLLEGIATE INSTITUTE English Public 8 min walk
  • OUR LADY OF SORROWS CATHOLIC ELEMENTARY SCHOOL English Separate 10 min walk
  • LAMBTON KINGSWAY JR MDL SCHOOL English Public 15 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureKingsway SouthMedian neighbourhood
Median household income (2020)$184,000$84,500
Households that own their home81%54%
Population (2021)8,85516,813
Homes built in 1960 or before59%29%
Homes needing major repairs6%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleKingsway SouthCity median
Assault513.1636.3
Robbery2969.5
Auto theft125.9192.6
Theft over $5,00058.146.1
Break and enter271.1172.8
Theft from vehicles48.4188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 28, 2026, published Nov 28, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 28, 2026, published Nov 27, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 28, 2026, published Nov 27, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 28, 2026, published Nov 27, 2026
  • Multi-tenant house licences: loaded Nov 28, 2026, published Nov 27, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 28, 2026, published Nov 27, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.