HousePrecheckCheck an address

451 Bloor St EToronto · zoning, lot size and permit records

Residential · R (d1.0) (x555)≈ 29.9 × 43.6 m892 m²on Bloor St Ecorner, also on Glen Rd

Not a single house

A rental apartment building

The City's RentSafeTO program evaluates this building as a rental apartment building (three storeys and ten units or more). Build options for a house do not apply.

Looking at a house nearby? What this means for you

  • 6 storeys, 41 rental units, built 1948More people, cars and deliveries than a street of houses alone. A tall building also shades the lots to its north.
  • 4 development applications open within 300 m, up to 69 storeysNew buildings may go up around here in the next years. More change nearby than at 98% of Toronto houses.
  • City upkeep score: 97 out of 100RentSafeTO rates common areas, building systems and records. A low score can show from the street.
  • Major Transit Station Area: Castle FrankThe City plans more homes around the station: good for transit, and more building over time.

Want to check this building before you buy?

We are building checks for apartment buildings. Leave your email and we will tell you when it is ready.

N20 m
≈ 29.9 m frontage≈ 43.6 m deepirregular lot, estimated

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • 4 development applications open within 300 m

    Good to know

    4 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 69 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications
  • Rental building evaluation: 97 out of 100

    Good to know

    The City's RentSafeTO program evaluated this rental building in 2025 (6 storeys, 41 units, built 1948).

    What it means. The score covers common areas, building systems and records. Read the evaluation details for the items that scored low.

    How to confirm. The City's RentSafeTO page has the evaluation results and any open orders for the building. Details

    City of Toronto, RentSafeTO Apartment Building Evaluations

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

3 records on file: more than at 81% of Toronto houses (median 0).

  • Building permit18 244500Closed

    Proposal to install a backflow prevention device in an existing apartment building.

    Nov 7, 2018 · 451 BLOOR ST E
  • Zoning review05 124024 ZPRClosed
    Apr 18, 2005 · 451 BLOOR ST E
  • Building permit01 165026Closed

    carry out remedial work to comply with retrofit privisions of the fire code for new fire alarm. "not approved for zoning purpses"

    Aug 7, 2001 · 451 BLOOR ST E

Check before you build

  • Site-specific exception 900.2.10(555)

    Needs a closer look

    1 site-specific rule and 1 older by-law that still prevails apply to this lot. They can override the standard rules on this page.

    Zoning By-law 569-2013, Chapter 900
Exception 900.2.10(555)Applies

These parts of the exception apply to this lot's address.

  1. Rule A

    The lands must comply with exception 900.2.10(7).

  2. Older by-law A

    Section 12(1) 434 of former City of Toronto By-law 438-86.

By-law 569-2013, Chapter 900

Lot facts

Area
892 m²
Frontage
29.9 mestimated, irregular lot
Depth
43.6 mestimated, irregular lot
Street
Bloor St E
Corner lot
Yes, also on Glen Rd43.6 m along it
Public lane
None
House footprint
494 m²roof up to 21.6 m
Back yard
6.7 mhouse to rear lot line
Side yards
0.3 m and 4.6 mhouse to side lot lines
Buildings on the lot
2house, garage, sheds
Max height
13 m
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • Major Transit Station Area: Castle Frank. The lot is inside the Castle Frank Major Transit Station Area approved by the Province (Site and Area Specific Policy 649). Source
  • Downtown Plan Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
  • Downtown building setback overlay. Towers over 36 m here need extra setbacks above 24 m and 25 m between towers. Houses and other low buildings are not affected. Source
  • Zone R (d1.0) (x555) (Residential). Chapter 10, section 10.10 of the by-law. Source
  • 12 City trees in front of this lot. The City's street tree inventory lists 12 trees at this address: mulberry, white (38 cm), mulberry, white (32 cm), black locust (25 cm). Diameter is the trunk at breast height. Source

Around this lot

Minor variances approved
100%13 of 13 decisions
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
2
Development applications
17

Within 300 m, last 10 years. 2 suite and multiplex permits: no more than at most Toronto houses (median 3). 13 variance decisions: no more than at most Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To alter the existing rear one-storey detached ancillary building (containing a three-car garage) by constructing a new roof (to increase the roof height).

    20 ELM AVE · Sep 23, 2026 · 486 m away
  • Minor varianceApproved

    To permit and maintain the existing two ground level parking spaces within the existing rear two-storey ancillary building (containing one garden suite on the second storey), abutting Dale Avenue. Also, to maintain the existing rear canopy above the garage door on the north side of the ancillary building. This application is necessitated as Minor Variance Decision A0388/25TEY approved a garden suite to occupy both the ground and second storeys of the ancillary building. There will be a total of two residential dwelling units on this through lot (one unit within the main dwelling and one unit within the ancillary building).

    8 MC KENZIE AVE · Sep 9, 2026 · 434 m away
  • Minor varianceApproved

    To alter the existing three-storey semi-detached dwelling by constructing a new front porch with stairs and a canopy, a partial rear one-storey addition, and a rear ground floor deck and patio. The existing rear two-storey addition and rear ground floor deck will be demolished. The basement level will be maintained as an entertainment room with one guest bedroom and wet bar.

    21 NANTON AVE · Aug 19, 2026 · 456 m away
  • Minor varianceApproved

    To alter the existing two-and-one-half-storey detached dwelling by reconstructing the existing basement walls (that will be under the new ground floor deck and stairs) and the entrance structure to access this basement area (cellar). This current application is necessitated to include additional variances not identified in the approved Minor Variance Decision A0921/25TEY, related to the construction of a rear third storey addition.

    66 GLEN RD · Apr 15, 2026 · 419 m away
  • Minor varianceApproved

    To alter the existing two-and-one-half-storey detached dwelling by constructing a rear third-storey addition.

    66 GLEN RD · Feb 4, 2026 · 419 m away

Latest activity nearby

  • Zoning review

    Not Started

    421 BLOOR ST E · Nov 23, 2026 · 195 m away
  • Building permit

    Three wall sign.***NO FRILLS***

    345 BLOOR ST E · Nov 10, 2026 · 283 m away
  • Building permit

    Proposal for interior alteration to fit the nails salon

    4 HOWARD ST · Oct 30, 2026 · 117 m away
  • Building permit

    Replacement of existing fire damaged balcony railings and repair of existing balconies for unit 2307 & 2407.

    375 BLEECKER ST · Oct 30, 2026 · 156 m away
  • Zoning review

    Closed

    100 HOWARD ST · Oct 29, 2026 · 217 m away
  • Building permit

    Interior alterations for a new nail salon in unit 4

    6 HOWARD ST · Oct 27, 2026 · 106 m away
  • Building permit

    Fire Damage in a High-rise Residential Building: Removing and replacing all damaged interior finishes and partition walls, balcony windows and doors, and balcony railings in the affected unit. If further investigation confirms damage to the concrete balcony slab, it will be repaired or replaced.

    666 ONTARIO ST · Oct 16, 2026 · 298 m away
  • Building permit

    Scope: to alter Designated Heritage houses in accordance with building design and Heritage Conservation Plan for integration with main tower.Construct a 61 storey market rental tower, with 4 levels of below grade parking. Proposed rental unit count is 716 units.

    37 LINDEN ST · Oct 9, 2026 · 214 m away
  • Building permit

    Scope: to alter Designated Heritage houses in accordance with building design and Heritage Conservation Plan for integration with main tower.Construct a 61 storey market rental tower, with 4 levels of below grade parking. Proposed rental unit count is 716 units

    29 LINDEN ST · Oct 9, 2026 · 247 m away
  • Building permit

    Scope: to alter Designated Heritage houses in accordance with building design and Heritage Conservation Plan for integration with main tower.Construct a 61 storey market rental tower, with 4 levels of below grade parking. Proposed rental unit count is 716 units.

    574 SHERBOURNE ST · Oct 9, 2026 · 224 m away

Neighbourhood: North St.James Town

About the area around the lot, not the lot itself.

Nearest station
Sherbourne Station2 min walk
Nearest TTC stop
Sherbourne Station - Eastbound Platform2 min walk
Nearest cycling route
Bloor St ECycle Track, 1 min walk
Nearest traffic count
20,033 vehicles in 8 hEdgedale Rd, 80 m away, Nov 7, 2006
Serious collisions within 500 m
52021–2026, killed or seriously injured: 1 fatal, 2 with pedestrians, 2 with cyclists
Parks
Rosedale Ravine Lands1 min walk
Dr. Gordon Chong Park2 min walk
St. James Town West Park2 min walk

Schools within 1 km

  • ROSE AVENUE JR PUBLIC SCHOOL English Public 4 min walk
  • MONSIGNOR FRASER COLLEGE - ISABELLA NORTH English Separate 5 min walk
  • MONSIGNOR FRASER COLLEGE - ISABELLA CAMPUS English Separate 5 min walk
  • BRANKSOME HALL GIRLS SCHOOL Private 9 min walk
  • OUR LADY OF LOURDES CATHOLIC ELEMENTARY SCHOOL English Separate 11 min walk
  • WINCHESTER JR & SR PUBLIC SCHOOL English Public 11 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureNorth St.James TownMedian neighbourhood
Median household income (2020)$59,200$84,500
Households that own their home11%54%
Population (2021)18,53516,813
Homes built in 1960 or before19%29%
Homes needing major repairs10%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleNorth St.James TownCity median
Assault1281.6636.3
Robbery76.969.5
Shootings4.310.5
Auto theft85.4192.6
Theft over $5,00038.446.1
Break and enter153.8172.8
Theft from vehicles136.7188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
  • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.