HousePrecheckCheck an address

45 Sunnypoint CresToronto · zoning, lot size and permit records

Open space · ON≈ 28.6 × 246.5 m5,578 m²on Sunnypoint Cres

Not a home

A park or open space

The zoning by-law sets this parcel aside for parks and open space. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Green space next doorShade, play and walks; busy parks also bring events and evening noise.
  • No development applications within 300 m in 10 yearsA quiet stretch for new building, by the City's records.
N50 m
≈ 28.6 m frontage≈ 246.5 m deepirregular lot, estimated

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • TRCA regulated area (85% of lot)

    Needs a closer look

    Part of the lot is near a valley, floodplain, shoreline or wetland. Work there needs a TRCA permit and may be restricted.

    What it means. Additions, pools and new buildings in the regulated part need a TRCA permit and may be refused. Ask your insurer about flood coverage.

    How to confirm. A TRCA property inquiry letter says which policies apply ($385, at least two weeks). Details

    Ontario Regulation 41/24, TRCA Regulation Limit
  • Ravine and natural feature protection (80% of lot)

    Needs a closer look

    Part of the lot is in the area covered by the City's Ravine and Natural Feature Protection By-law. The City's map of the area was last published in 2019.

    What it means. In that part, injuring or removing a tree of any size, grading, filling or dumping needs a City permit. Plans for a pool, addition or garden suite there may be refused.

    How to confirm. Urban Forestry confirms where the protected area runs and whether work needs a permit. Details

    Toronto Municipal Code, Chapter 658
  • Environmentally Significant Area: Scarborough Bluffs Sequence

    Needs a closer look

    The lot touches an Environmentally Significant Area shown on Official Plan Map 12.

    What it means. Development in or next to the area needs an impact study and may be limited.

    How to confirm. City Planning confirms the policies that apply. Details

    City of Toronto Official Plan, Map 12
  • Natural Heritage System (95% of lot)

    Good to know

    Part of the lot is in the Natural Heritage System shown on Official Plan Map 9.

    What it means. New buildings or additions in that part need a natural heritage impact study.

    How to confirm. City Planning confirms the policies that apply. Details

    City of Toronto Official Plan, Map 9

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

No permits, applications or Committee of Adjustment files on this lot in the City's open records.

Lot facts

Area
5,578 m²
Frontage
28.6 mestimated, irregular lot
Depth
246.5 mestimated, irregular lot
Street
Sunnypoint Cres
Corner lot
No
Public lane
None
House footprint
274 m²roof up to 5.4 m
Back yard
217.9 mhouse to rear lot line
Side yards
1 m and 13.8 mhouse to side lot lines
Buildings on the lot
1house, garage, sheds
Max height
—
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • Zone ON (Open Space Natural). Chapter 90, section 90.20 of the by-law. Source

Around this lot

Minor variances approved
57%4 of 7 decisions
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
1
Development applications
0

Within 300 m, last 10 years. 1 suite and multiplex permits: no more than at most Toronto houses (median 3). 7 variance decisions: no more than at most Toronto houses (median 19).

Latest activity nearby

  • Building permitmultiplex, new building, new house, secondary suite

    Revision No.3: 1. At Basement, units are swapped such as previous unit-1 is now unit-2 and vice versa. Sleeping area, living and stove & fridge added as commented in PERMIT of Rev#2 (24 201222 BLD 02 NH); 2. The rear deck size is reduced; 3. Porch canopy proposed. 4. Window size increased at north elevation and within limit.Revison 02: 1. Roof plan/ 3rd floor: GFA increased; total building height remain unchanged and required front & rear setback maintained. 2. Basement: prayer room, elevator & heated closet proposed. 3. Ground floor: powder room converted to full washroom, kitchen door & wall alteration, elevator added, window added/revised, stair orientation revised. 4. 2nd floor: closet, kitchenette and laundry location alteration. Proposed construction of new duplex with finished basement

    22 EASTVILLE AVE · Oct 20, 2026 · 244 m away
  • Building permit

    Backwater Valve installation

    54 SUNNYPOINT CRES · Sep 25, 2026 · 253 m away
  • Zoning review

    Notice Sent

    37 SUNNYPOINT CRES · Aug 28, 2026 · 154 m away
  • Building permit

    INSTALL BACK WATER VALVE

    4 GRADWELL DR · Aug 13, 2026 · 278 m away
  • Building permit

    Installation of backwater valve.

    4 GRADWELL DR · Jul 28, 2026 · 278 m away
  • Building permitsecondary suite

    Rev 01 - Revision to front yard landscapeProposal for an one storey front addition, 2 storey side addition, new second floor addition, interior alterations, front porch, side deck, second floor balcony and a 2nd suite in the basement.See also 25 126187 ZAP.

    44 SUNNYPOINT CRES · Jun 25, 2026 · 190 m away
  • Building permitdemolition

    Proposed demolition of the existing dwelling (NH application: 24 201222)

    22 EASTVILLE AVE · Jan 29, 2026 · 244 m away
  • Building permit

    relocating window and installation of telecab from main to second floor.

    7 BROOKLAWN AVE · Jan 15, 2026 · 229 m away
  • Minor varianceApproved

    To construct a new two-storey detached dwelling with a front porch, front second storey balcony, front rooftop terrace, side (south) second storey balcony, rear basement walkout, rear ground floor deck and rear second storey balcony. The existing one-storey detached dwelling will be demolished.

    22 EASTVILLE AVE · Apr 9, 2025 · 244 m away
  • Zoning review

    Application On Hold

    44 SUNNYPOINT CRES · Mar 7, 2025 · 190 m away

Neighbourhood: Cliffcrest

About the area around the lot, not the lot itself.

Nearest station
Scarborough GO Station33 min walk
Nearest TTC stop
Brooklawn Ave at Barkdene Hills8 min walk
Nearest cycling route
Barkdene HillsSharrows - Wayfinding, 8 min walk
Nearest traffic count
560 vehicles in 8 hEastville Ave / Barkdene Hills, 470 m away, Jan 24, 2023
Serious collisions within 500 m
02021–2026, killed or seriously injured
Parks
Bluffer's Park1 min walk
Sunnypoint - Neilson Park3 min walk
Totts Tot Lot3 min walk

Schools within 1 km

  • ST JOHN HENRY NEWMAN CATHOLIC HIGH SCHOOL English Separate 12 min walk
  • FAIRMOUNT JR PUBLIC SCHOOL English Public 13 min walk
  • CHINE DRIVE PUBLIC SCHOOL English Public 14 min walk
  • ST JOHN HENRY NEWMAN CATHOLIC HIGH SCHOOL (FUTURE SITE) English Separate 15 min walk
  • ST THERESA SHRINE CATHOLIC ELEMENTARY SCHOOL English Separate 15 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureCliffcrestMedian neighbourhood
Median household income (2020)$92,000$84,500
Households that own their home64%54%
Population (2021)16,13016,813
Homes built in 1960 or before44%29%
Homes needing major repairs7%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleCliffcrestCity median
Assault803.6636.3
Robbery127.569.5
Shootings11.110.5
Auto theft271.6192.6
Theft over $5,00038.846.1
Break and enter188.4172.8
Theft from vehicles465.6188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 28, 2026, published Nov 28, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 28, 2026, published Nov 27, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 28, 2026, published Nov 27, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 28, 2026, published Nov 27, 2026
  • Multi-tenant house licences: loaded Nov 28, 2026, published Nov 27, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 28, 2026, published Nov 27, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.