Before you offer
From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.
1 development application open within 300 m
Good to know1 rezoning, site plan, subdivision or condominium application within 300 m, submitted in the last 10 years, is not closed yet. They are listed under Around this lot.
What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.
How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details
City of Toronto, Development Applications
Not in these records
- Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
- Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.
History of this lot
23 records on file: more than at 100% of Toronto houses (median 0).
- Zoning review24 160075 LPRClosedJun 5, 2024 · 45 IRON ST
- Zoning review23 181119 LPRClosedJul 28, 2023 · 45 IRON ST
- Zoning review20 151127 LPRApplication On HoldJun 1, 2020 · 45 IRON ST
- Zoning review18 195903 ZPRClosedJul 18, 2018 · 45 IRON ST
- Zoning review16 121961 LPRClosedFeb 29, 2016 · 45 IRON ST
- Zoning review16 106126 LPRClosedJan 19, 2016 · 45 IRON ST
- Zoning review12 284267 LPRClosedNov 23, 2012 · 45 IRON ST
- Zoning review12 255218 LTOClosedSep 28, 2012 · 45 IRON ST
Show 15 older records
- Zoning review12 194057 ZPUClosedJun 15, 2012 · 45 IRON ST
- Zoning review10 291208 LPRClosedNov 4, 2010 · 45 IRON ST
- Zoning review10 291191 LPRClosedNov 4, 2010 · 45 IRON ST
- Zoning review10 257797 LPRClosedSep 14, 2010 · 45 IRON ST
- Zoning review10 199426 LPRClosedJun 17, 2010 · 45 IRON ST
- Zoning review09 172732 LPRClosedSep 24, 2009 · 45 IRON ST
- Zoning review09 147635 ZPUClosedJun 9, 2009 · 45 IRON ST
- Zoning review09 114791 LPRClosedMar 6, 2009 · 45 IRON ST
- Zoning review08 196645 LPRClosedAug 25, 2008 · 45 IRON ST
- Zoning review07 253304 000CancelledAug 15, 2007 · 45 IRON ST
- Zoning review07 253284 LPRClosedAug 15, 2007 · 45 IRON ST
- Zoning review04 185623 LTOClosedOct 27, 2004 · 45 IRON ST
- Zoning review04 185603 000CancelledOct 27, 2004 · 45 IRON ST
- Zoning review02 103576 LTOClosedJan 16, 2002 · 45 IRON ST
- Building permit97 085316Closed
ILLUMINATED ROOF SIGN TO INDUSTRIAL BLDG
Dec 16, 1997 · 45 IRON ST
Lot facts
- Area
- 4,406 m²
- Frontage
- 66.7 m
- Depth
- 67.5 m
- Street
- Iron St
- Corner lot
- Yes, also on Belfield Rd67.5 m along it
- Public lane
- None
- House footprint
- 2,204 m²roof up to 11.5 m
- Back yard
- 15 mhouse to rear lot line
- Side yards
- 3.3 m and 13.7 mhouse to side lot lines
- Buildings on the lot
- 1house, garage, sheds
- Max height
- —
- Max lot coverage
- —
House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.
Around this lot
- Minor variances approved
- 100%2 of 2 decisions
- Garden suite permits
- 0
- Laneway suite permits
- 0
- Multiplex permits
- 0
- Development applications
- 1
Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 2 variance decisions: no more than at most Toronto houses (median 19).
Recent variance decisions in the same zone
- Minor varianceApproved
To convert a portion of the existing building into a vehicle dealership.
71 CITY VIEW DR · Mar 20, 2025 · 468 m away - Minor varianceApproved
To construct a one-storey rear addition.
180 BELFIELD RD · Jul 5, 2018 · 72 m away - Minor varianceApproved
To construct a raised platform.
195 BELFIELD RD · May 10, 2018 · 111 m away - Minor varianceApproved
To convert a portion of the existing building into a vehicle dealership.
71 CITY VIEW DR · Jan 11, 2018 · 468 m away
Latest activity nearby
- Building permit
Plumbing - Localized replacement of deteriorated metal roof deck.
195 BELFIELD RD · Nov 19, 2026 · 111 m away - Building permit
Proposal to demolish old security room
195 BELFIELD RD · Sep 17, 2026 · 111 m away - Building permit
Fire alarm system panel repair - Edwards EST3 to EST4
30 IRON ST · Jul 31, 2026 · 141 m away - Zoning review
Not Started
172 BELFIELD RD · May 8, 2026 · 143 m away - Building permit
Proposal for Additions and Alterations to create a security room.
195 BELFIELD RD · May 7, 2026 · 111 m away - Building permit
REV 01: Changes to location of roof drains and storm drainage piping.Proposal for addition of five (5) new supplemental roof drains.
195 BELFIELD RD · Oct 7, 2025 · 111 m away - Building permit
Rev. 1- revision to remove from scope of work the offices and mezzanine above the offices.Proposal to construct a rooftop penthouse and a mezzanine floor in an existing industrial building.
30 IRON ST · Jul 14, 2025 · 141 m away - Development application
Proposed one-storey addition to an existing industrial building for the use of warehouse storage and the production of fertilizers.
172 BELFIELD RD · Dec 31, 2024 · 127 m away · City file - Building permit
Proposal for interior alterations to install a freestanding structure in the existing warehouse to be used as office/lunchroom.
30 IRON ST · Dec 2, 2024 · 141 m away - Zoning review
Applicable Law Pending
172 BELFIELD RD · Jul 22, 2024 · 143 m away
Neighbourhood: West Humber-Clairville
About the area around the lot, not the lot itself.
- Nearest station
- Etobicoke North GO Station24 min walk
- Nearest TTC stop
- Belfield Rd at Iron St1 min walk
- Nearest traffic count
- 7,643 vehicles in 8 hBelfield Rd / Iron St, 70 m away, Feb 13, 2013
- Serious collisions within 500 m
- 22021–2026, killed or seriously injured: 0 fatal, 0 with pedestrians, 0 with cyclists
Schools within 1 km
- MADRESATUL BANAAT ALMUSLIMAAT SCHOOL Private 8 min walk
Being near a school does not mean the lot is in its catchment; check with the board.
2021 Census
| Figure | West Humber-Clairville | Median neighbourhood |
|---|---|---|
| Median household income (2020) | $92,000 | $84,500 |
| Households that own their home | 65% | 54% |
| Population (2021) | 33,300 | 16,813 |
| Homes built in 1960 or before | 13% | 29% |
| Homes needing major repairs | 4% | 7% |
Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.
Police-reported crime, 2025
| Per 100,000 people | West Humber-Clairville | City median |
|---|---|---|
| Assault | 933 | 636.3 |
| Robbery | 152.4 | 69.5 |
| Homicide | 2.7 | 5.3 |
| Shootings | 26.7 | 10.5 |
| Auto theft | 1320.6 | 192.6 |
| Theft over $5,000 | 245.9 | 46.1 |
| Break and enter | 347.5 | 172.8 |
| Theft from vehicles | 545.4 | 188.1 |
Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.