HousePrecheckCheck an address

449 Sentinel RdToronto · zoning, lot size and permit records

Also 1510 Finch Ave W, 445 Sentinel Rd

Open space · OR110.3 × 184.5 m20,220 m²on Sentinel Rdcorner, also on Finch Ave W

Not a home

Fountainhead Park

The City of Toronto's real estate inventory lists Fountainhead Park here, on City land in City use. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Green space next doorShade, play and walks; busy parks also bring events and evening noise.
  • Permits or applications open on this parcelRecent records on this lot: 26 137682 (A NEW PROPOSED GARAGE BUILDING AND ALL ASSOCIATED STRUCTURAL, MECHANICAL AND ELECTRICAL..., 2026). Larger work can mean noise and trucks next door; read what each one is for.
  • 5 development applications open within 300 m, up to 40 storeysNew buildings may go up around here in the next years. More change nearby than at 88% of Toronto houses.
N50 m
110.3 m frontage184.5 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • Work or applications in progress

    Good to know

    Recent records on this lot: 26 137682 (A NEW PROPOSED GARAGE BUILDING AND ALL ASSOCIATED STRUCTURAL, MECHANICAL AND ELECTRICAL..., 2026).

    What it means. The owner has planned or started work. Ask what it covers, whether it will be finished before closing, and who pays for what is left.

    How to confirm. Application details and decisions are in the City's Application Information Centre. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards); City of Toronto, Development Applications
  • 5 development applications open within 300 m

    Good to know

    5 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 40 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

4 records on file: more than at 88% of Toronto houses (median 0).

  • Building permit26 137682Permit Issued

    A NEW PROPOSED GARAGE BUILDING AND ALL ASSOCIATED STRUCTURAL, MECHANICAL AND ELECTRICAL WORK TO SUPPORT NEW PROPOSED ICE RINK AND SKATING TRAIL. PROPOSED PROJECT ALSO INCLUDES INTERIOR RENOVATIONS OF THE EXISTING CLUBHOUSE BUILDING TO INCORPORATE UNIVERSAL WASHROOMS, WASHROOMS, AND CHANGE ROOMS.

    Oct 7, 2026 · 449 SENTINEL RD
  • Zoning review25 255388 ZAPApplication On Hold
    Nov 18, 2025 · 449 SENTINEL RD
  • Building permit19 133931Closed

    Proposal for a new hexagon shade shelter with footings to be install next to the playground - Fountainhead Park

    May 15, 2019 · 449 SENTINEL RD
  • Zoning review13 161747 ZZCNotice Sent
    May 3, 2013 · 445 SENTINEL RD

Lot facts

Area
20,220 m²
Frontage
110.3 m
Depth
184.5 m
Street
Sentinel Rd
Corner lot
Yes, also on Finch Ave W184.5 m along it
Public lane
None
House footprint
234 m²roof up to 5.4 m
Back yard
100.4 mhouse to rear lot line
Side yards
35.1 m and 58.4 mhouse to side lot lines
Buildings on the lot
2house, garage, sheds
Max height
—
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • Keele Finch Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
  • Zone OR (Open Space Recreation). Chapter 90, section 90.30 of the by-law. Source
  • 8 City trees in front of this lot. The City's street tree inventory lists 8 trees at this address: maple, red (18 cm), maple, red (8 cm), maple, red (8 cm). Diameter is the trunk at breast height. Source

Around this lot

Minor variances approved
—no decisions on file
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
1
Development applications
6

Within 300 m, last 10 years. 1 suite and multiplex permits: no more than at most Toronto houses (median 3). 0 variance decisions: no more than at most Toronto houses (median 19).

Latest activity nearby

  • Building permit

    A NEW PROPOSED GARAGE BUILDING AND ALL ASSOCIATED STRUCTURAL, MECHANICAL AND ELECTRICAL WORK TO SUPPORT NEW PROPOSED ICE RINK AND SKATING TRAIL. PROPOSED PROJECT ALSO INCLUDES INTERIOR RENOVATIONS OF THE EXISTING CLUBHOUSE BUILDING TO INCORPORATE UNIVERSAL WASHROOMS, WASHROOMS, AND CHANGE ROOMS.

    449 SENTINEL RD · Oct 7, 2026 · 85 m away
  • Zoning review

    Closed

    41-75 FOUR WINDS DR · Aug 26, 2026 · 162 m away
  • Zoning review

    Closed

    41-75 FOUR WINDS DR · Jul 15, 2026 · 162 m away
  • Zoning review

    Closed

    41-75 FOUR WINDS DR · Apr 28, 2026 · 162 m away
  • Zoning review

    Cancelled

    37 FOUR WINDS DR · Mar 16, 2026 · 217 m away
  • Zoning review

    Cancelled

    37 FOUR WINDS DR · Mar 13, 2026 · 217 m away
  • Zoning review

    Cancelled

    37 FOUR WINDS DR · Mar 11, 2026 · 217 m away
  • Zoning review

    Closed

    470 SENTINEL RD · Mar 5, 2026 · 274 m away
  • Zoning review

    Closed

    41-75 FOUR WINDS DR · Jan 22, 2026 · 162 m away
  • Building permit

    1 NEW GROUND SIGN FOR ST. WILFRID'S CATHOLIC CHURCH INCLUDING READOGRAPH COPY CHANGED ELECTRONICALLY.***ST. WILFRID'S CATHOLIC CHURCH***

    1675 FINCH AVE W · Dec 5, 2025 · 256 m away

Neighbourhood: York University Heights

About the area around the lot, not the lot itself.

Nearest station
Sentinel Station2 min walk
Nearest TTC stop
Finch Ave West at Sentinel Rd2 min walk
Nearest cycling route
Sentinel RdBike Lane, 2 min walk
Nearest traffic count
30,528 vehicles in 14 hFinch Ave W / Sentinel Rd, 130 m away, Nov 8, 2025
Serious collisions within 500 m
12021–2026, killed or seriously injured: 1 fatal, 0 with pedestrians, 0 with cyclists
Parks
Fountainhead Park1 min walk
Four Winds Allotment Gardens3 min walk
Derrydowns Park7 min walk

Schools within 1 km

  • ST WILFRID CATHOLIC ELEMENTARY SCHOOL English Separate 6 min walk
  • C W JEFFERYS COLLEGIATE INSTITUTE English Public 7 min walk
  • JAMES CARDINAL MCGUIGAN CATHOLIC HIGH SCHOOL English Separate 7 min walk
  • DERRYDOWN PUBLIC SCHOOL English Public 9 min walk
  • ELIA MDL SCHOOL 416 395-3020 English Public 15 min walk
  • LAMBERTON PUBLIC SCHOOL English Public 16 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureYork University HeightsMedian neighbourhood
Median household income (2020)$76,000$84,500
Households that own their home47%54%
Population (2021)28,25516,813
Homes built in 1960 or before14%29%
Homes needing major repairs8%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleYork University HeightsCity median
Assault1274.1636.3
Robbery12869.5
Shootings11.910.5
Auto theft634.1192.6
Theft over $5,000178.646.1
Break and enter375.1172.8
Theft from vehicles312.6188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 28, 2026, published Nov 28, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 28, 2026, published Nov 27, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 28, 2026, published Nov 27, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 28, 2026, published Nov 27, 2026
  • Multi-tenant house licences: loaded Nov 28, 2026, published Nov 27, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 28, 2026, published Nov 27, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.