Before you offer
From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.
Heritage property: listed
Needs a closer lookOn the City's Heritage Register. Demolition and exterior changes need heritage review.
What it means. Renovations, additions and demolition can take longer, cost more or be refused. A listing is not registered on title, so a title search will not show it.
How to confirm. Heritage Planning at the City confirms the status and what it covers. Details
City of Toronto Heritage Register1 Committee of Adjustment file on this lot
Good to know1 approved. A0728/16TEY (To alter the existing three-storey detached institutional building by constructing: a n..., 2016).
What it means. Approved variances and consents stay with the property, including any conditions in the decision. They allow what was approved, not more.
How to confirm. Decisions are in the Application Information Centre; older files are available from the Committee of Adjustment office. Details
City of Toronto, Committee of Adjustment applications (2001 onwards)10 development applications open within 300 m
Good to know10 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 85 storeys. They are listed under Around this lot.
What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.
How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details
City of Toronto, Development Applications
Not in these records
- Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
- Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.
History of this lot
18 records on file: more than at 100% of Toronto houses (median 0).
- Development application22 242103 STE 13 OZClosed
This is an application that is to address two main objectives: 1) to bring the portion of the university's lands currently zoned under the former City of Toronto Zoning By-law 438-86 into the City-wide Zoning By-law 569-2013; and 2) to establish bicycle parking, loading space, and automobile parking rates for lands owned and operated by Toronto Metropolitan University as an overlay approach in By-law 569-2013. No development is proposed as part of this application.
Dec 23, 2022 · 44 GERRARD ST E · City file - Building permit20 234500Closed
Revision # 2 - add third floor interior alterations, equipment relocations extend wall.REVISION - to replace/relocate/add sprinklers[Laboratory fit out to 4th & 5th floor]
Dec 3, 2021 · 44 GERRARD ST E - Building permit21 199498Closed
Proposed structural modification to allow recessing of existing loading dock leveller into floor.
Nov 3, 2021 · 44 GERRARD ST E - Building permit21 150543Closed
Proposal to install 2 maglocks for doors D401 and D505 for existing university
May 10, 2021 · 44 GERRARD ST E - Building permit19 146214Closed
Proposal to install 3 (three) certified tents (Cert # 14-241365) (Two 10'X100' and one 10'x80') in existing open space to be erected on Friday May 10, 2019 and to be dismantled Sunday May 12, 2019.
May 3, 2019 · 44 GERRARD ST E - Building permit17 106776Closed
REV01: Revision to issued permit 17-106776 BLD as per bubbled area for Fire Protection and Life Safety. Proposal to construct a 3 storey and 5 storey addition, interior alterations and new 1 storey below grade mechanical space to the existing university building.
Oct 31, 2018 · 44 GERRARD ST E - Building permit16 233426Closed
Shoring and excavation for future addition to university building. See active permit 16 223649 for reference
Jan 30, 2017 · 44 GERRARD ST E - Building permit16 223649Closed
Proposal for partial demolition to a portion of exterior and interior building elements to make ready for a new addition and renovations to existing university building - "Ryerson University"
Dec 28, 2016 · 44 GERRARD ST E
Show 10 older records
- Minor varianceA0728/16TEYApproved
To alter the existing three-storey detached institutional building by constructing: a north three-storey addition and a southeast side five-storey addition.
Oct 5, 2016 · 44 GERRARD ST E - Zoning review16 203845 PSPClosedAug 11, 2016 · 44 GERRARD ST E
- Development application16 203845 STE 27 SAClosed
Site Plan Control application to permit the adaptive re-use of the existing heritage-listed building at 44 Gerrard St E; a 5-storey addition to the east (behind 46 Gerrard St E). The existing surface parking lot to the north would be replaced with a 3-storey addition with frontage onto McGill St. The altered building would continue to be used for institutional purposes by Ryerson University. No parking is proposed.
Aug 9, 2016 · 44 GERRARD ST E · City file - Zoning review16 168281 ZPRClosedJun 6, 2016 · 44 GERRARD ST E
- Building permit11 245616Closed
Revision to existing plumbing permit - revision to add new vent for new kitchen sink. plumbing stand alone permit for new kitchen / laundryroom in Ryerson University. - Room 109E
Aug 11, 2011 · 44 GERRARD ST E - Building permit10 128221Closed
Backflow prevention device (2") to be installed within the Theatre School building of Ryerson University.
Mar 15, 2010 · 44 GERRARD ST E - Building permit03 202154Closed
Mechanical - new dye vat exhaust fan exisitng and proposed - college
Mar 1, 2004 · 44 GERRARD ST E - Building permit03 202148Closed
Interior alteration to replace t-bar ceiling existing and proposed - college
Jan 15, 2004 · 44 GERRARD ST E - Building permit03 202157Closed
Install one kitchen sink.existing and propsed -college
Dec 29, 2003 · 44 GERRARD ST E - Building permit98 012440Closed
REPLACE BOILER LG
Jan 19, 1998 · 44 GERRARD ST E
Check before you build
Site-specific exception 900.11.10(2373)
Needs a closer look1 site-specific rule and 1 older by-law that still prevails apply to this lot. They can override the standard rules on this page.
Zoning By-law 569-2013, Chapter 900
These parts of the exception apply to this lot's address.
- Rule A
These premises must comply with Exception 900 11.10(2). Prevailing By-laws and Prevailing Sections: (None Apply)
- Older by-law A
These premises must comply with Exception 900 11.10(2). Prevailing By-laws and Prevailing Sections: (None Apply)
Lot facts
- Area
- 1,528 m²
- Frontage
- 31.7 m
- Depth
- 50.4 m
- Street
- Gerrard St E
- Corner lot
- No
- Public lane
- None
- House footprint
- 353 m²
- Back yard
- 16.8 mhouse to rear lot line
- Side yards
- 0 m and 0.5 mhouse to side lot lines; 0 is a shared wall
- Buildings on the lot
- 5house, garage, sheds
- Max height
- —
- Max lot coverage
- —
House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.
- Site and Area Specific Policy 151. The Official Plan has a policy for this site or area that varies the general rules. Read it before relying on zoning alone. Source
- Major Transit Station Area: Wellesley. The lot is inside the Wellesley Major Transit Station Area approved by the Province (Site and Area Specific Policy 602). Source
- Downtown Plan Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
- Downtown building setback overlay. Towers over 36 m here need extra setbacks above 24 m and 25 m between towers. Houses and other low buildings are not affected. Source
- Zone CR 3.0 (c2.0; r3.0) SS1 (x2373) (Commercial Residential). Chapter 40, section 40.10 of the by-law. Source
- 5 City trees in front of this lot. The City's street tree inventory lists 5 trees at this address: honey locust (30 cm), honey locust (30 cm), honey locust (8 cm). Diameter is the trunk at breast height. Source
Around this lot
- Minor variances approved
- 94%16 of 17 decisions
- Garden suite permits
- 0
- Laneway suite permits
- 0
- Multiplex permits
- 2
- Development applications
- 22
Within 300 m, last 10 years. 2 suite and multiplex permits: no more than at most Toronto houses (median 3). 17 variance decisions: no more than at most Toronto houses (median 19).
Recent variance decisions in the same zone
- Minor varianceApproved
To permit a new eating establishment with karaoke rooms on the second storey (with an increased total floor area), and an eating establishment on the ground floor with washrooms and storage located in the basement, within the existing two-storey commercial building.
332 YONGE ST · Oct 14, 2026 · 329 m away - Minor varianceApproved
To permit the existing entertainment place of assembly (nightclub) use within the two-storey commercial building.
508 CHURCH ST · Sep 9, 2026 · 485 m away - Minor varianceApproved
To alter the development standards (as approved under Site Specific Zoning By-law 1017-2022), for the 53-storey mixed-use building, by reducing the non-residential space, and the number of short-term bicycle parking spaces required on-site. There will be a total of 591 residential dwelling units on this site. This is currently under the review of Site Plan Control (File No. 21 206338 STE 13 SA).
241 CHURCH ST · Jul 30, 2025 · 409 m away - Minor varianceApproved
To alter the existing three-storey apartment building (containing 35 rental dwelling units) by converting the basement level (storage rooms and building management office) and a portion of the ground floor (vacant space) into an additional 11 rental dwelling units. There will be a total of 46 rental dwelling units on this lot.
134 CARLTON ST · Jul 9, 2025 · 484 m away - Minor varianceApproved
To alter the existing 15-storey apartment building by constructing a garbage storage enclosure (to be located on the upper-level of the underground parking garage), which will be the cause for a reduction in two vehicular parking spaces.
145 MUTUAL ST · Feb 26, 2025 · 283 m away
Latest activity nearby
- Consent (lot split)Pending
To obtain consent to sever a portion of stratified land (air-rights at-and-above an elevation of 121 m) for the purpose of a lot addition.
50 GERRARD ST E · Nov 25, 2026 · 27 m away - Building permit
Installation of new vertical condensate drain risers to collect condensate from existing piping outlets at the balconies
145 MUTUAL ST · Nov 20, 2026 · 283 m away - Zoning review
Closed
66 GERRARD ST E · Nov 9, 2026 · 65 m away - Zoning review
Not Started
66 GERRARD ST E · Nov 4, 2026 · 65 m away - Building permit
REVISION-01Proposal for interior alterations to existing vacant suite for new crisis centre - "Gerstein Crisis Centre"
355 CHURCH ST · Oct 30, 2026 · 105 m away - Building permit
Proposal to install a maglock in existing office space.
355 CHURCH ST · Oct 28, 2026 · 105 m away - Building permit
Interior alteration, second floor additional unit
27 MCGILL ST · Oct 27, 2026 · 119 m away - Zoning review
Closed
27 CARLTON ST · Oct 26, 2026 · 191 m away - Zoning review
Closed
30 CARLTON ST · Oct 20, 2026 · 232 m away - Zoning review
Closed
444 YONGE ST · Oct 19, 2026 · 297 m away
Neighbourhood: Downtown Yonge East
About the area around the lot, not the lot itself.
- Nearest station
- College Station4 min walk
- Nearest TTC stop
- Carlton St at Church St3 min walk
- Nearest cycling route
- Gerrard St ECycle Track, 1 min walk
- Nearest traffic count
- 8,027 vehicles in 8 hGerrard St E: Victoria St - Church St, 30 m away, Feb 17, 2005
- Serious collisions within 500 m
- 152021–2026, killed or seriously injured: 2 fatal, 10 with pedestrians, 4 with cyclists
- Parks
- Joseph Sheard Parkette3 min walk
- College Park4 min walk
- Toronto Metropolitan University Square4 min walk
Schools within 1 km
- TORONTO METROPOLITAN UNIVERSITY - THEATRE SCHOOL University 1 min walk
- TAIE INTERNATIONAL INSTITUTE SCHOOL Private 4 min walk
- TMU - HEIDELBERG CENTRE SCHOOL OF GRAPHIC COMM'NS MGMT University 4 min walk
- TORONTO METROPOLITAN UNIVERSITY - SCHOOL OF IMAGE ARTS University 5 min walk
- TORONTO METROPOLITAN UNIVERSITY - SCHOOL OF INTERIOR DESIGN University 5 min walk
- TMU - HEASLIP HOUSE University 5 min walk
Being near a school does not mean the lot is in its catchment; check with the board.
2021 Census
| Figure | Downtown Yonge East | Median neighbourhood |
|---|---|---|
| Median household income (2020) | $69,500 | $84,500 |
| Households that own their home | 36% | 54% |
| Population (2021) | 17,700 | 16,813 |
| Homes built in 1960 or before | 7% | 29% |
| Homes needing major repairs | 4% | 7% |
Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.
Police-reported crime, 2025
| Per 100,000 people | Downtown Yonge East | City median |
|---|---|---|
| Assault | 2360.8 | 636.3 |
| Robbery | 143.3 | 69.5 |
| Shootings | 11.9 | 10.5 |
| Auto theft | 75.6 | 192.6 |
| Theft over $5,000 | 99.5 | 46.1 |
| Break and enter | 274.7 | 172.8 |
| Theft from vehicles | 390.1 | 188.1 |
Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.