HousePrecheckCheck an address

44 Gerrard St EToronto · zoning, lot size and permit records

Also 44 Gerrard St E, 46 Gerrard St E

Commercial residential · CR 3.0 (c2.0; r3.0) SS1 (x2373)31.7 × 50.4 m1,528 m²on Gerrard St E

Not a home

Toronto Metropolitan University - Theatre School

The City's school locations place Toronto Metropolitan University - Theatre School on this parcel. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • A school next doorDrop-off traffic around 8 to 9 am and 3 to 4 pm on school days, children walking; a short walk for a family.
  • 10 development applications open within 300 m, up to 85 storeysNew buildings may go up around here in the next years. More change nearby than at 99% of Toronto houses.
  • Major Transit Station Area: WellesleyThe City plans more homes around the station: good for transit, and more building over time.
N20 m
31.7 m frontage50.4 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • Heritage property: listed

    Needs a closer look

    On the City's Heritage Register. Demolition and exterior changes need heritage review.

    What it means. Renovations, additions and demolition can take longer, cost more or be refused. A listing is not registered on title, so a title search will not show it.

    How to confirm. Heritage Planning at the City confirms the status and what it covers. Details

    City of Toronto Heritage Register
  • 1 Committee of Adjustment file on this lot

    Good to know

    1 approved. A0728/16TEY (To alter the existing three-storey detached institutional building by constructing: a n..., 2016).

    What it means. Approved variances and consents stay with the property, including any conditions in the decision. They allow what was approved, not more.

    How to confirm. Decisions are in the Application Information Centre; older files are available from the Committee of Adjustment office. Details

    City of Toronto, Committee of Adjustment applications (2001 onwards)
  • 10 development applications open within 300 m

    Good to know

    10 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 85 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

18 records on file: more than at 100% of Toronto houses (median 0).

  • Development application22 242103 STE 13 OZClosed

    This is an application that is to address two main objectives: 1) to bring the portion of the university's lands currently zoned under the former City of Toronto Zoning By-law 438-86 into the City-wide Zoning By-law 569-2013; and 2) to establish bicycle parking, loading space, and automobile parking rates for lands owned and operated by Toronto Metropolitan University as an overlay approach in By-law 569-2013. No development is proposed as part of this application.

    Dec 23, 2022 · 44 GERRARD ST E · City file
  • Building permit20 234500Closed

    Revision # 2 - add third floor interior alterations, equipment relocations extend wall.REVISION - to replace/relocate/add sprinklers[Laboratory fit out to 4th & 5th floor]

    Dec 3, 2021 · 44 GERRARD ST E
  • Building permit21 199498Closed

    Proposed structural modification to allow recessing of existing loading dock leveller into floor.

    Nov 3, 2021 · 44 GERRARD ST E
  • Building permit21 150543Closed

    Proposal to install 2 maglocks for doors D401 and D505 for existing university

    May 10, 2021 · 44 GERRARD ST E
  • Building permit19 146214Closed

    Proposal to install 3 (three) certified tents (Cert # 14-241365) (Two 10'X100' and one 10'x80') in existing open space to be erected on Friday May 10, 2019 and to be dismantled Sunday May 12, 2019.

    May 3, 2019 · 44 GERRARD ST E
  • Building permit17 106776Closed

    REV01: Revision to issued permit 17-106776 BLD as per bubbled area for Fire Protection and Life Safety. Proposal to construct a 3 storey and 5 storey addition, interior alterations and new 1 storey below grade mechanical space to the existing university building.

    Oct 31, 2018 · 44 GERRARD ST E
  • Building permit16 233426Closed

    Shoring and excavation for future addition to university building. See active permit 16 223649 for reference

    Jan 30, 2017 · 44 GERRARD ST E
  • Building permit16 223649Closed

    Proposal for partial demolition to a portion of exterior and interior building elements to make ready for a new addition and renovations to existing university building - "Ryerson University"

    Dec 28, 2016 · 44 GERRARD ST E
Show 10 older records
  • Minor varianceA0728/16TEYApproved

    To alter the existing three-storey detached institutional building by constructing: a north three-storey addition and a southeast side five-storey addition.

    Oct 5, 2016 · 44 GERRARD ST E
  • Zoning review16 203845 PSPClosed
    Aug 11, 2016 · 44 GERRARD ST E
  • Development application16 203845 STE 27 SAClosed

    Site Plan Control application to permit the adaptive re-use of the existing heritage-listed building at 44 Gerrard St E; a 5-storey addition to the east (behind 46 Gerrard St E). The existing surface parking lot to the north would be replaced with a 3-storey addition with frontage onto McGill St. The altered building would continue to be used for institutional purposes by Ryerson University. No parking is proposed.

    Aug 9, 2016 · 44 GERRARD ST E · City file
  • Zoning review16 168281 ZPRClosed
    Jun 6, 2016 · 44 GERRARD ST E
  • Building permit11 245616Closed

    Revision to existing plumbing permit - revision to add new vent for new kitchen sink. plumbing stand alone permit for new kitchen / laundryroom in Ryerson University. - Room 109E

    Aug 11, 2011 · 44 GERRARD ST E
  • Building permit10 128221Closed

    Backflow prevention device (2") to be installed within the Theatre School building of Ryerson University.

    Mar 15, 2010 · 44 GERRARD ST E
  • Building permit03 202154Closed

    Mechanical - new dye vat exhaust fan exisitng and proposed - college

    Mar 1, 2004 · 44 GERRARD ST E
  • Building permit03 202148Closed

    Interior alteration to replace t-bar ceiling existing and proposed - college

    Jan 15, 2004 · 44 GERRARD ST E
  • Building permit03 202157Closed

    Install one kitchen sink.existing and propsed -college

    Dec 29, 2003 · 44 GERRARD ST E
  • Building permit98 012440Closed

    REPLACE BOILER LG

    Jan 19, 1998 · 44 GERRARD ST E

Check before you build

  • Site-specific exception 900.11.10(2373)

    Needs a closer look

    1 site-specific rule and 1 older by-law that still prevails apply to this lot. They can override the standard rules on this page.

    Zoning By-law 569-2013, Chapter 900
Exception 900.11.10(2373)Applies

These parts of the exception apply to this lot's address.

  1. Rule A

    These premises must comply with Exception 900 11.10(2). Prevailing By-laws and Prevailing Sections: (None Apply)

  2. Older by-law A

    These premises must comply with Exception 900 11.10(2). Prevailing By-laws and Prevailing Sections: (None Apply)

By-law 569-2013, Chapter 900

Lot facts

Area
1,528 m²
Frontage
31.7 m
Depth
50.4 m
Street
Gerrard St E
Corner lot
No
Public lane
None
House footprint
353 m²
Back yard
16.8 mhouse to rear lot line
Side yards
0 m and 0.5 mhouse to side lot lines; 0 is a shared wall
Buildings on the lot
5house, garage, sheds
Max height
—
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • Site and Area Specific Policy 151. The Official Plan has a policy for this site or area that varies the general rules. Read it before relying on zoning alone. Source
  • Major Transit Station Area: Wellesley. The lot is inside the Wellesley Major Transit Station Area approved by the Province (Site and Area Specific Policy 602). Source
  • Downtown Plan Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
  • Downtown building setback overlay. Towers over 36 m here need extra setbacks above 24 m and 25 m between towers. Houses and other low buildings are not affected. Source
  • Zone CR 3.0 (c2.0; r3.0) SS1 (x2373) (Commercial Residential). Chapter 40, section 40.10 of the by-law. Source
  • 5 City trees in front of this lot. The City's street tree inventory lists 5 trees at this address: honey locust (30 cm), honey locust (30 cm), honey locust (8 cm). Diameter is the trunk at breast height. Source

Around this lot

Minor variances approved
94%16 of 17 decisions
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
2
Development applications
22

Within 300 m, last 10 years. 2 suite and multiplex permits: no more than at most Toronto houses (median 3). 17 variance decisions: no more than at most Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To permit a new eating establishment with karaoke rooms on the second storey (with an increased total floor area), and an eating establishment on the ground floor with washrooms and storage located in the basement, within the existing two-storey commercial building.

    332 YONGE ST · Oct 14, 2026 · 329 m away
  • Minor varianceApproved

    To permit the existing entertainment place of assembly (nightclub) use within the two-storey commercial building.

    508 CHURCH ST · Sep 9, 2026 · 485 m away
  • Minor varianceApproved

    To alter the development standards (as approved under Site Specific Zoning By-law 1017-2022), for the 53-storey mixed-use building, by reducing the non-residential space, and the number of short-term bicycle parking spaces required on-site. There will be a total of 591 residential dwelling units on this site. This is currently under the review of Site Plan Control (File No. 21 206338 STE 13 SA).

    241 CHURCH ST · Jul 30, 2025 · 409 m away
  • Minor varianceApproved

    To alter the existing three-storey apartment building (containing 35 rental dwelling units) by converting the basement level (storage rooms and building management office) and a portion of the ground floor (vacant space) into an additional 11 rental dwelling units. There will be a total of 46 rental dwelling units on this lot.

    134 CARLTON ST · Jul 9, 2025 · 484 m away
  • Minor varianceApproved

    To alter the existing 15-storey apartment building by constructing a garbage storage enclosure (to be located on the upper-level of the underground parking garage), which will be the cause for a reduction in two vehicular parking spaces.

    145 MUTUAL ST · Feb 26, 2025 · 283 m away

Latest activity nearby

  • Consent (lot split)Pending

    To obtain consent to sever a portion of stratified land (air-rights at-and-above an elevation of 121 m) for the purpose of a lot addition.

    50 GERRARD ST E · Nov 25, 2026 · 27 m away
  • Building permit

    Installation of new vertical condensate drain risers to collect condensate from existing piping outlets at the balconies

    145 MUTUAL ST · Nov 20, 2026 · 283 m away
  • Zoning review

    Closed

    66 GERRARD ST E · Nov 9, 2026 · 65 m away
  • Zoning review

    Not Started

    66 GERRARD ST E · Nov 4, 2026 · 65 m away
  • Building permit

    REVISION-01Proposal for interior alterations to existing vacant suite for new crisis centre - "Gerstein Crisis Centre"

    355 CHURCH ST · Oct 30, 2026 · 105 m away
  • Building permit

    Proposal to install a maglock in existing office space.

    355 CHURCH ST · Oct 28, 2026 · 105 m away
  • Building permitsecondary suite

    Interior alteration, second floor additional unit

    27 MCGILL ST · Oct 27, 2026 · 119 m away
  • Zoning review

    Closed

    27 CARLTON ST · Oct 26, 2026 · 191 m away
  • Zoning review

    Closed

    30 CARLTON ST · Oct 20, 2026 · 232 m away
  • Zoning review

    Closed

    444 YONGE ST · Oct 19, 2026 · 297 m away

Neighbourhood: Downtown Yonge East

About the area around the lot, not the lot itself.

Nearest station
College Station4 min walk
Nearest TTC stop
Carlton St at Church St3 min walk
Nearest cycling route
Gerrard St ECycle Track, 1 min walk
Nearest traffic count
8,027 vehicles in 8 hGerrard St E: Victoria St - Church St, 30 m away, Feb 17, 2005
Serious collisions within 500 m
152021–2026, killed or seriously injured: 2 fatal, 10 with pedestrians, 4 with cyclists
Parks
Joseph Sheard Parkette3 min walk
College Park4 min walk
Toronto Metropolitan University Square4 min walk

Schools within 1 km

  • TORONTO METROPOLITAN UNIVERSITY - THEATRE SCHOOL University 1 min walk
  • TAIE INTERNATIONAL INSTITUTE SCHOOL Private 4 min walk
  • TMU - HEIDELBERG CENTRE SCHOOL OF GRAPHIC COMM'NS MGMT University 4 min walk
  • TORONTO METROPOLITAN UNIVERSITY - SCHOOL OF IMAGE ARTS University 5 min walk
  • TORONTO METROPOLITAN UNIVERSITY - SCHOOL OF INTERIOR DESIGN University 5 min walk
  • TMU - HEASLIP HOUSE University 5 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureDowntown Yonge EastMedian neighbourhood
Median household income (2020)$69,500$84,500
Households that own their home36%54%
Population (2021)17,70016,813
Homes built in 1960 or before7%29%
Homes needing major repairs4%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleDowntown Yonge EastCity median
Assault2360.8636.3
Robbery143.369.5
Shootings11.910.5
Auto theft75.6192.6
Theft over $5,00099.546.1
Break and enter274.7172.8
Theft from vehicles390.1188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
  • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.