HousePrecheckCheck an address

44 Champlain BlvdToronto · zoning, lot size and permit records

53.1 × 99.1 m5,261 m²on Touraine Avecorner, also on Champlain Blvd

Not a home

Yeshiva Bnei Tzion Of Bobov School

The City's school locations place Yeshiva Bnei Tzion Of Bobov School on this parcel. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • A school next doorDrop-off traffic around 8 to 9 am and 3 to 4 pm on school days, children walking; a short walk for a family.
  • Permits or applications open on this parcelRecent records on this lot: 24 249326 (The existing ¿SIMPLEX 4002¿ Fire Alarm Control Panel to be replaced with a new ¿MIRCOM..., 2025). Larger work can mean noise and trucks next door; read what each one is for.
  • 2 development applications open within 300 m, up to 33 storeysNew buildings may go up around here in the next years. More change nearby than at 94% of Toronto houses.
N50 m
53.1 m frontage99.1 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • Work or applications in progress

    Good to know

    Recent records on this lot: 24 249326 (The existing ¿SIMPLEX 4002¿ Fire Alarm Control Panel to be replaced with a new ¿MIRCOM..., 2025).

    What it means. The owner has planned or started work. Ask what it covers, whether it will be finished before closing, and who pays for what is left.

    How to confirm. Application details and decisions are in the City's Application Information Centre. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards); City of Toronto, Development Applications
  • 2 development applications open within 300 m

    Good to know

    2 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 33 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

5 records on file: more than at 93% of Toronto houses (median 0).

  • Building permit24 249326Permit Issued

    The existing ¿SIMPLEX 4002¿ Fire Alarm Control Panel to be replaced with a new ¿MIRCOM FA-1000¿ Fire Alarm Control Panel installed in the same location ¿ at the main entrance.The zone schedule to remain as is. All of the original signal and initiating wiring to remain with no alterations.All existing devices (manual pull stations, heat detectors, flow switches and horns) shall remain with no alterations.

    Jan 14, 2025 · 44 CHAMPLAIN BLVD
  • Zoning review24 138272 ZZUClosed
    Apr 19, 2024 · 44 CHAMPLAIN BLVD
  • Zoning review23 234674 ZZUCancelled
    Dec 11, 2023 · 44 CHAMPLAIN BLVD
  • Zoning review09 177724 ZPRClosed
    Oct 9, 2009 · 44 CHAMPLAIN BLVD
  • Building permit95 251149Closed - Dormant

    FIRE ALARM

    Nov 23, 1995 · 44 CHAMPLAIN BLVD

Check before you build

  • Zoning not in By-law 569-2013

    Needs a closer look

    This lot is not covered by the citywide zoning by-law's map. It is probably still governed by a former municipal by-law, which this tool does not read yet.

    Zoning By-law 569-2013

Lot facts

Area
5,261 m²
Frontage
53.1 m
Depth
99.1 m
Street
Touraine Ave
Corner lot
Yes, also on Champlain Blvd99.1 m along it
Public lane
None
House footprint
1,289 m²roof up to 10.3 m
Back yard
15.2 mhouse to rear lot line
Side yards
9 m and 22.3 mhouse to side lot lines
Buildings on the lot
2house, garage, sheds
Max height
—
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • 3 City trees in front of this lot. The City's street tree inventory lists 3 trees at this address: serviceberry (10 cm), serviceberry (8 cm), honey locust skyline (8 cm). Diameter is the trunk at breast height. Source

Around this lot

Minor variances approved
100%6 of 6 decisions
Garden suite permits
1
Laneway suite permits
0
Multiplex permits
5
Development applications
9

Within 300 m, last 10 years. 6 suite and multiplex permits: more than at 64% of Toronto houses (median 3). 6 variance decisions: no more than at most Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To alter the development standards for the mult-tower mixed use development (Block 2), as approved under Site-Specific By-law No. 1514-2025.

    50 WILSON HEIGHTS BLVD · Mar 26, 2026 · 498 m away
  • Minor varianceApproved

    Revised proposal for two towers of 14 and 17 storeys with an adjoined podium. Number of storeys increased from 13 to 14 and from 16 to 17 storeys, with no increase in metric height, and less non-residential space and more residential space. Reducing indoor amenity space and establishing new use permissions for home occupation (live work), in a mixed-use building.

    6 TIPPETT RD · Feb 19, 2026 · 254 m away
  • Minor varianceApproved

    The proposed variances seek to reduce the requirement for non-residential uses and an increase in residential GFA. A previous minor variance application for a reduction in non-residential GFA and increase in residential GFA was approved by the NY CofA in 2022.

    6 TIPPETT RD · Sep 12, 2024 · 254 m away
  • Minor varianceApproved

    To alter the existing dwelling by converting the existing garage into habitable space (a studio apartment).

    433 WILSON AVE · Aug 29, 2024 · 433 m away
  • Minor varianceApproved

    Proposal to construct a new dwelling.

    22 KING HIGH AVE · Jun 6, 2024 · 458 m away

Latest activity nearby

  • Zoning review

    Not Started

    6 TIPPETT RD · Nov 6, 2026 · 254 m away
  • Building permit

    Instalation of two maglocks on P1 level.

    6 TIPPETT RD · Nov 3, 2026 · 254 m away
  • Zoning review

    Closed

    500 WILSON AVE · Oct 14, 2026 · 295 m away
  • Building permitgarden suite

    NEW 2-STOREY GARDEN SUITE

    25 LUVERNE AVE · Oct 8, 2026 · 279 m away
  • Building permitmultiplex

    Revision No.1: Change of south exterior wall to rated assembly.Proposal for a ground floor, a second floor addition and interior alterations to convert to a four unit dwelling.

    25 LUVERNE AVE · Oct 2, 2026 · 279 m away
  • Development application

    Site Plan Amendment application to amend Site Plan application no. 18 150482 NNY 10 SA for the development of a 17-storey mixed-use building with 416 residential units, including eight (8) two (2)-storey live-work units, and 789 square metres of commercial/retail use (Express Condos - Phase 2), which is under construction

    6 TIPPETT RD · Sep 24, 2026 · 269 m away · City file
  • Building permit

    Proposed interior alterations. Scope of work includes partition walls, appliances and equipment, sinks, finish floor, walls, and ceiling - unit 33 (Nails Salon)

    500 WILSON AVE · Aug 18, 2026 · 295 m away
  • Building permit

    Proposal to demolish existing deck and construct a new rear deck.

    41 LUVERNE AVE · Jul 23, 2026 · 168 m away
  • Building permit

    Proposal for Heating and Domestic Hot Water Boiler Replacement.

    495 WILSON AVE · Jul 14, 2026 · 243 m away
  • Zoning review

    Closed

    21 TIPPETT RD · Jun 22, 2026 · 205 m away

Neighbourhood: Clanton Park

About the area around the lot, not the lot itself.

Nearest station
Wilson Station10 min walk
Nearest TTC stop
Wilson Ave at Faywood Blvd East Side4 min walk
Nearest cycling route
Faywood BlvdSharrows, 5 min walk
Nearest traffic count
5,503 vehicles in 14 hTippett Rd / Monte Kwinter Crt, 240 m away, Jul 8, 2025
Serious collisions within 500 m
42021–2026, killed or seriously injured: 1 fatal, 3 with pedestrians, 0 with cyclists
Parks
Champlain Parkette1 min walk
Milton Berger Park4 min walk
Delahaye Parkette4 min walk

Schools within 1 km

  • YESHIVA BNEI TZION OF BOBOV SCHOOL Private 1 min walk
  • YESHIVA DARCHEI TORAH SCHOOL Private 2 min walk
  • ST MARGARET - BEATRICE CAMPUS AND BAYCREST PUBLIC English Separate 8 min walk
  • ASSOCIATED HEBREW JR SCHOOL - POSLUNS CAMPUS Private 13 min walk
  • FAYWOOD ARTS BASED CURRICULUM SCHOOL English Public 13 min walk
  • BAIS CHOMESH HIGH SCHOOL FOR GIRLS Private 15 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureClanton ParkMedian neighbourhood
Median household income (2020)$88,000$84,500
Households that own their home54%54%
Population (2021)17,62016,813
Homes built in 1960 or before25%29%
Homes needing major repairs5%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleClanton ParkCity median
Assault584.1636.3
Robbery9569.5
Shootings4.710.5
Auto theft185.2192.6
Theft over $5,00090.246.1
Break and enter133172.8
Theft from vehicles194.7188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
  • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.