Everything here comes from public records: City of Toronto open data, TRCA and Statistics Canada, 15 sets in all. Each item leads to the record it comes from. Our sources
This house at a glance
Each score from 0 to 10: 0 needs attention, 10 all clear. Build potential is how much more you could add.
About 437 Roehampton Ave
437 Roehampton Ave is on a 8.1 m by 59.5 m lot on Roehampton Ave in Mount Pleasant East. The zoning is R. A site-specific exception, 900.2.10(956), changes some of the usual rules for this address.
The City has 5 records on this lot since 2022. That is more than at 93% of Toronto houses. In 2024, a building permit was filed: "Rev 1: changes to the main floor mechanical room layout and for an additional washroom on the second floor". Status: closed. In 2024, a building permit was filed: "Proposal for installation of backwater valve". Status: closed. In 2024, a building permit was filed: "Garden suite will be located 57m from roehampton ave. it is proposed to apply the city of toronto laneway suite policy for buildings exceeding 45 m to a…". Status: approved. Nothing on file is open right now.
Within 300 m, 4 development applications are open (the tallest up to 11 storeys). Mount Pleasant station is a 8-minute walk, and the lot is in its Major Transit Station Area.
Summary
What the City's records show on this house
- Records mention garden suite, laneway suiteModerateFree check
- Site-specific exception 900.2.10(956)Moderate
- 4 development applications open within 300 mLowFree check
- Minimum frontage 9 mLow
- Yonge-Eglinton Secondary PlanLow
- 1 Committee of Adjustment file on this lotLowFree check
Left unchecked, any of these can mean unexpected costs, trouble after closing, or plans you can't carry out. Found before you offer, they give you room to negotiate. The full report explains what each one means for this house and what to do next.
What the rules allow here: Multiplex up to 4 units
15 sets of public records, already checked for you. Searching each one yourself and working out what it means for you takes time. We have done that work: what matters about this house and lot, in plain English, in a few minutes.
What to find out first
1 thing to check before you offer.
What to find out before an offer, the steps to take, what each costs and how long it takesUnlock
Open City files
How much in the City's records needs answers before an offer
- Records mention garden suite, laneway suite
- No open orders or by-law investigations
- No permits left open for years
What this part means for this house, in plain EnglishUnlock
Records mention garden suite, laneway suite
ModerateCheck before you offerSee the basement apartment check for this house
What the record shows, what it means for you and what to doUnlock
1 Committee of Adjustment file on this lot
LowFor later, once you own itSee the next door check for this house
What the record shows, what it means for you and what to doUnlock
What this means: Toronto zoning by addressWhat this means: Committee of Adjustment
City files on this lot
5 records on file, more than at 93% of Toronto houses (median 0 records).
| Date | Record | As the City filed it | In plain words | Status |
|---|---|---|---|---|
| 2024-10-30 | Building permit23 235688 | REV 1: changes to the main floor mechanical room layout and for an additional washroom on the second floor | Closed | |
| 2024-10-10 | Building permit24 223448 | Proposal for installation of backwater valve. | Closed | |
| 2024-04-08 | Building permit24 133906 | Garden suite will be located 57m from Roehampton Ave. It is proposed to apply the City of Toronto Laneway suite policy for buildings exceeding 45 m to a street, including sprinkler protection designed per NFPA 13D, maintaining a clear path to the building 1.5 m wide by 2.1 m high, providing a residential fire warning system, and providing an exterior strobe light facing the street refer to codenext letter dated April4, 2024 | Approved | |
| 2023-10-12 | Minor varianceA0257/23NY | To construct a second storey addition and expand the main floor of the existing rear garage,in order to add to a Garden Suite to the garage. | Approved | |
| 2022-10-17 | Zoning review22 217822 ZAP | No description on file | Closed |
Restrictions
How much heritage, nature and site-specific rules limit changes to the house
- Site-specific exception 900.2.10(956)
- No heritage listing or designation
What this part means for this house, in plain EnglishUnlock
Site-specific exception 900.2.10(956)
ModerateCheck if it appliesWhat the record shows, what it means for you and what to doUnlock
Yonge-Eglinton Secondary Plan
LowFor later, once you own itWhat the record shows, what it means for you and what to doUnlock
If you want to change or build
What the site-specific rules mean for an addition, a garage or a rebuild.
Site-specific exception 900.2.10(956)
What the exception changes for this address, rule by ruleUnlock
Flood and erosion rules
How much of the lot lies in the areas TRCA regulates for flooding and erosion
- Outside the areas TRCA regulates
From TRCA's regulated areas only. Basement flooding, sewer back-up and the TRCA flood plain are not in this score yet; ask the seller and your insurer about water in the basement.
What this part means for this house, in plain EnglishUnlock
Build potential
How much more the rules allow on this lot, beyond what is on record
- On record: garden suite, laneway suite
- Multiplex up to 4 units: likely fits
- Secondary suite: likely fits
What this part means for this house, in plain EnglishUnlock
Minimum frontage 9 m
LowFor later, once you own itWhat the record shows, what it means for you and what to doUnlock
Multiplex up to 4 units
LowFor later, once you own itWhat the record shows, what it means for you and what to doUnlock
The lot and what the rules allow
- Zone
- R (f9.0; u4; d0.6) (x956)
- Height limit
- 10 m
- Corner lot
- No
- Public lane
- None
- New house permit
- None since 2000
- House footprint
- 99 m²
- Back yard
- 38.1 m
- Buildings on the lot
- 1
House and yards from the City's 3D Massing; a survey gives exact figures.
What you can build
Why, measured on this lot, and the most you could buildUnlock
Building nearby
How much neighbours are building and applying to change within 300 m
- 4 development applications open within 300 m, up to 11 storeys
- In the Mount Pleasant station area
- 5 suite and multiplex permits within 300 m in 10 years
What this part means for this house, in plain EnglishUnlock
4 development applications open within 300 m
LowCheck if it appliesSee the next door check for this house
What the record shows, what it means for you and what to doUnlock
What the City allowed next door
Within 500 m, last 10 years: a guide if you plan to build or apply for something similar.
What neighbours have built and changed around you, and how the City decidedUnlock
Area safety
Police-reported crime in the neighbourhood against the Toronto median
- Lower than the Toronto median in 4 of 6 categories
Neighbourhood rates per 100,000 people from the Toronto Police Service, not this street.
What this part means for this house, in plain EnglishUnlock
Mount Pleasant East neighbourhood
About the area, not this house.
2021 Census, against the median Toronto neighbourhood
Getting around and schools
- Mount Pleasant StationNearest station8 min walk
- Eglinton Ave East at Forman AveNearest TTC stop3 min walk
- Broadway AveNearest cycling route3 min walk
- Toronto Stem SchoolSchool5 min walk
- Northern Secondary SchoolSchool7 min walk
- Manor Montessori School - Mt PleasantSchool9 min walk
- Eglinton Jr Public SchoolSchool9 min walk
Police-reported crime, 2025, per 100,000 people
- Assaultcity median 636.3336.5
- Robberycity median 69.510.2
- Auto theftcity median 192.6224.4
- Theft over $5,000city median 46.145.9
- Break and entercity median 172.8204
- Theft from vehiclescity median 188.1107.1
Ready emails
Copy and send as they are.
2 questions for the seller and your lawyer, written outUnlock
What we checked, and what the City's records don't cover
We checked 48 sets of City of Toronto, TRCA and Statistics Canada open data for this address, last updated Nov 27, 2026. Our records don't cover flooding history, ownership and mortgages, or the condition of the house: ask the seller and your insurer about water in the basement, your lawyer about title, and book a home inspection.
See every source and when we loaded it · Pre-offer checklist