Before you offer
From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.
2 building permits open, the oldest since 2018
Needs a closer lookStill open in the City's records: 19 215283 (Proposal to replace 686lm of balcony guards in existing apartment building, 2019, status Permit Issued); 18 158676 (Proposal to install smoke detectors in the corridors of an existing 9 storey mixed use..., 2018, status Permit Issued).
What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.
How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details
City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)6 by-law investigations closed in the last two years
Good to knowClosed files (Property Standards, Zoning): 26 229029 PRS 00 IR (Property Standards, 2026); 26 217257 PRS 00 IR (Property Standards, 2026); 26 142281 PRS 00 IR (Property Standards, 2026); and 3 more.
What it means. Someone raised an issue here and the City closed the file. Ask the seller what it was about.
City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations1 Committee of Adjustment file on this lot
Good to know1 approved. A0023/01TO (Construct canopy roof (7.62 metres by 20.11 metres) over rear garage ramp of existing a..., 2001).
What it means. Approved variances and consents stay with the property, including any conditions in the decision. They allow what was approved, not more.
How to confirm. Decisions are in the Application Information Centre; older files are available from the Committee of Adjustment office. Details
City of Toronto, Committee of Adjustment applications (2001 onwards)7 development applications open within 300 m
Good to know7 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 56 storeys. They are listed under Around this lot.
What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.
How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details
City of Toronto, Development ApplicationsRental building evaluation: 92 out of 100
Good to knowThe City's RentSafeTO program evaluated this rental building in 2025 (9 storeys, 143 units, built 1960).
What it means. The score covers common areas, building systems and records. Read the evaluation details for the items that scored low.
How to confirm. The City's RentSafeTO page has the evaluation results and any open orders for the building. Details
City of Toronto, RentSafeTO Apartment Building Evaluations
Not in these records
- Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
- Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.
History of this lot
17 records on file: more than at 100% of Toronto houses (median 0).
- By-law investigation26 229029 PRS 00 IRClosed
Property Standards
Aug 31, 2026 · 433 JARVIS ST - By-law investigation26 217257 PRS 00 IRClosed
Property Standards
Aug 10, 2026 · 433 JARVIS ST - By-law investigation26 142281 PRS 00 IRClosed
Property Standards
Apr 12, 2026 · 433 JARVIS ST - By-law investigation25 250312 ZON 00 IRClosed
Zoning
Nov 6, 2025 · 433 JARVIS ST - By-law investigation25 123126 PRS 00 IRClosed
Property Standards
Feb 28, 2025 · 433 JARVIS ST - By-law investigation25 108373 PRS 00 IRClosed
Property Standards
Jan 24, 2025 · 433 JARVIS ST - Building permit20 187165Closed
Proposal to install a 2" D.C.V.A. back flow prevention device in the existing apartment building.
Sep 28, 2020 · 433 JARVIS ST - Building permit19 215283Permit Issued
Proposal to replace 686lm of balcony guards in existing apartment building.
Oct 2, 2019 · 433 JARVIS ST
Show 9 older records
- Building permit18 158676Permit Issued
Proposal to install smoke detectors in the corridors of an existing 9 storey mixed use building.
Jun 19, 2018 · 433 JARVIS ST - Zoning review17 242879 ZPRClosedOct 4, 2017 · 433 JARVIS ST
- Zoning review13 139627 LPRClosedMar 25, 2013 · 433 JARVIS ST
- Zoning review13 113255 LTOClosedJan 30, 2013 · 433 JARVIS ST
- Building permit09 146795Closed
Proposal to install 1 backflow prevention device to the existing water line.
Jun 15, 2009 · 433 JARVIS ST - Zoning review03 175663 LTOClosedSep 17, 2003 · 433 JARVIS ST
- Building permit01 137333Closed
construct canopy roof (7.62 m x 20.11m) over rear garage ramp of existing apt bldg see c of a decision final & binding
Jun 8, 2001 · 433 JARVIS ST - Minor varianceA0023/01TOApproved
Construct canopy roof (7.62 metres by 20.11 metres) over rear garage ramp of existing apartment building.
Feb 13, 2001 · 433 JARVIS ST - Zoning review86 028126 LTOClosedJun 2, 1986 · 433 JARVIS ST
Check before you build
Site-specific exception 900.2.10(644)
Needs a closer look2 site-specific rules and 1 older by-law that still prevails apply to this lot. They can override the standard rules on this page.
Zoning By-law 569-2013, Chapter 900
These parts of the exception apply to this lot's address.
- Rule A
The lands must comply with exception 900.2.10(4)
- Rule B
The minimum front yard setback is 6.0 metres.
- Older by-law A
Section 12(1) 434 of former City of Toronto By-law 438-86.
Lot facts
- Area
- 2,681 m²
- Frontage
- 30.7 m
- Depth
- 88.5 m
- Street
- Jarvis St
- Corner lot
- Yes, also on Sirman Lane88.5 m along it
- Public lane
- None
- House footprint
- 898 m²roof up to 35.9 m
- Back yard
- 4.1 mhouse to rear lot line
- Side yards
- 6.3 m and 7 mhouse to side lot lines
- Buildings on the lot
- 8house, garage, sheds
- Max height
- 46 m
- Max lot coverage
- —
House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.
- Major Transit Station Area: Wellesley. The lot is inside the Wellesley Major Transit Station Area approved by the Province (Site and Area Specific Policy 602). Source
- Downtown Plan Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
- Downtown building setback overlay. Towers over 36 m here need extra setbacks above 24 m and 25 m between towers. Houses and other low buildings are not affected. Source
- Zone R (d2.5) (x644) (Residential). Chapter 10, section 10.10 of the by-law. Source
Around this lot
- Minor variances approved
- 100%10 of 10 decisions
- Garden suite permits
- 0
- Laneway suite permits
- 0
- Multiplex permits
- 4
- Development applications
- 19
Within 300 m, last 10 years. 4 suite and multiplex permits: more than at 54% of Toronto houses (median 3). 10 variance decisions: no more than at most Toronto houses (median 19).
Recent variance decisions in the same zone
- Minor varianceApproved
To construct a new four-storey apartment building with a west side courtyard area at the centre of the building, a front (north) green roof, and a maintenance equipment storage area on the roof level. There will be a total of 17 bicycle parking spaces on the lot and no vehicular parking spaces will be provided. Also, to construct a rear one-storey detached ancillary building (waste storage enclosure) on the southwest corner on the lot. There will be a total of 15 residential dwelling units (12 studio units and 3 one bedroom units) on the lot.
185 GERRARD ST E · Oct 14, 2026 · 457 m away - Minor varianceApproved
To alter the existing three-storey townhouse dwelling by constructing interior alterations to the existing open-to-above area between the basement and ground floor level of the dwelling by enclosing the floor (increasing the area of habitable space).
97 GRANBY ST · Oct 15, 2025 · 332 m away - Minor varianceApproved
To construct a new four-storey apartment building with front and rear rooftop decks. This building will contain a total of 28 residential dwelling units.
185 GERRARD ST E · Oct 4, 2023 · 457 m away - Minor varianceApproved
To alter the existing two-and-one-half-storey semi-detached rooming house by constructing a rear four-storey addition. A total of 26 rooms for living accommodation will be provided.
344 JARVIS ST · Sep 21, 2022 · 113 m away - Minor varianceApproved
To convert the existing single family, two-storey building into a two-storey duplex by constructing a front basement walkout and porch.
64 MCGILL ST · Jan 26, 2022 · 462 m away
Latest activity nearby
- Building permit
Proposal for addition of a bathroom in unit 1. Layout changes in units 1, 26, 32 & 35.
134 CARLTON ST · Nov 26, 2026 · 132 m away - Building permit
1 Wall Sign***** T-DOT DENTAL*****
306 JARVIS ST · Nov 17, 2026 · 238 m away - Zoning review
Closed
405 SHERBOURNE ST · Oct 30, 2026 · 273 m away - Zoning review
Closed
140 CARLTON ST · Oct 27, 2026 · 139 m away - Building permit
Layout changes + addition of a bathroom in units1A, 12, 24 & 25.
134 CARLTON ST · Oct 23, 2026 · 132 m away - Building permit
Proposed geothermal system for new building
405 SHERBOURNE ST · Oct 20, 2026 · 273 m away - Building permit
Proposed storage addition on the parking area in the building
105 CARLTON ST · Oct 15, 2026 · 215 m away - Building permit
Replacement of the existing make up air unit, DHW storage tank and boilers including ductwork, piping, pumps, etc. in the penthouse mechanical room.
330 JARVIS ST · Oct 13, 2026 · 150 m away - Zoning review
Closed
473 CHURCH ST · Sep 2, 2026 · 291 m away - Building permit
Proposed converting the existing parking spot (parking spot # A69) to a storage unit.
130 CARLTON ST · Aug 27, 2026 · 118 m away
Neighbourhood: Cabbagetown-South St.James Town
About the area around the lot, not the lot itself.
- Nearest station
- Wellesley Station10 min walk
- Nearest TTC stop
- Carlton St at Jarvis St2 min walk
- Nearest cycling route
- Maitland PlBike Lane - Contraflow, 3 min walk
- Nearest traffic count
- 29,525 vehicles in 14 hCarlton St / Jarvis St, 160 m away, Nov 12, 2026
- Serious collisions within 500 m
- 102021–2026, killed or seriously injured: 0 fatal, 6 with pedestrians, 2 with cyclists
- Parks
- Montague Parkette1 min walk
- Allan Gardens3 min walk
- Bleecker Parkette6 min walk
Schools within 1 km
- NATIONAL BALLET SCHOOL Private 1 min walk
- NATIONAL BALLET SCHOOL - MARGARET MCCAIN ACEDEMIC CENTRE Private 2 min walk
- NATIONAL BALLET SCHOOL - THE SHOE ROOM Private 2 min walk
- NATIONAL BALLET SCHOOL - BETTY OLIPHANT THEATRE Private 2 min walk
- LE COLLEGE FRANCAIS - CARLTON CAMPUS Private 3 min walk
- CHURCH ST JR & NATIVE LEARNING CTR English Public 3 min walk
Being near a school does not mean the lot is in its catchment; check with the board.
2021 Census
| Figure | Cabbagetown-South St.James Town | Median neighbourhood |
|---|---|---|
| Median household income (2020) | $76,500 | $84,500 |
| Households that own their home | 45% | 54% |
| Population (2021) | 11,020 | 16,813 |
| Homes built in 1960 or before | 42% | 29% |
| Homes needing major repairs | 9% | 7% |
Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.
Police-reported crime, 2025
| Per 100,000 people | Cabbagetown-South St.James Town | City median |
|---|---|---|
| Assault | 1078.6 | 636.3 |
| Robbery | 145.3 | 69.5 |
| Auto theft | 91.8 | 192.6 |
| Theft over $5,000 | 22.9 | 46.1 |
| Break and enter | 321.3 | 172.8 |
| Theft from vehicles | 229.5 | 188.1 |
Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.