Before you offer
From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.
Building permit open since 2012
Needs a closer lookStill open in the City's records: 12 137473 (Sprinkler permit for new multi unit commercial residential building - Fees paid under b..., 2012, status Inspection).
What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.
How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details
City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)1 by-law investigation closed in the last two years
Good to knowClosed files (Property Standards): 25 270269 PRS 00 IR (Property Standards, 2025).
What it means. Someone raised an issue here and the City closed the file. Ask the seller what it was about.
City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations13 development applications open within 300 m
Good to know13 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 72 storeys. They are listed under Around this lot.
What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.
How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details
City of Toronto, Development Applications
Not in these records
- Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
- Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.
History of this lot
13 records on file: more than at 100% of Toronto houses (median 0).
- By-law investigation25 270269 PRS 00 IRClosed
Property Standards
Dec 29, 2025 · 426 UNIVERSITY AVE - Building permit10 153762Closed
REVISION: To increase the occupancy loads on the 2-5 levels of the existing 42 storey high rise building to a greater number than oringinally submitted.Construction of a new 42 storey high rise building with residential and assembly occupancies. 36 stories of this building will be residential units and storey's 1 thru 6 will be assembly occupancies. There are also 4 below grade parking levels. The ROYAL CANADIAN MILITARY INSTITUTE / TRIBUTE COMMUNITIES CONDOMINIUM building will be a 42 storey mixed use development consisting of Royal Canadian Military Institute (RCMI) assembly space (Group A, Division 2 major occupancy with Group D subsidiary offices occupancies) on the Ground to 6th Floors while the remaining 7th through 42nd Floors will consist of residential condominium suites (Group C major occupancy). Four underground levels will be provided beneath the residential building for tenant storage, bicycle storage, and vehicle parking. The building will be protected throughout by electronically supervised automatic sprinkler protection. 2269
Feb 11, 2014 · 426 UNIVERSITY AVE - Building permit13 264102Closed
To install 4 electromagnetic locks to the area occupied Royal Canadian Military Institute.
Dec 3, 2013 · 426 UNIVERSITY AVE - Development application13 143444 STE 20 CDClosed
Condominium Application for a 42 storey mixed-use building consisting of 318 units. Refer to related Re-zoning folder 08-163452 and Site Plan Approval 08-163490.
Apr 3, 2013 · 426 UNIVERSITY AVE - Building permit12 137473Inspection
Sprinkler permit for new multi unit commercial residential building - Fees paid under building permit = 10 153762 BLD
Oct 19, 2012 · 426 UNIVERSITY AVE - Building permit12 250577Approved
Proposal for alternative solution to sanitary piping system.
Sep 20, 2012 · 426 UNIVERSITY AVE - Building permit11 302731Approved
Alternative solution for Aluminum sandwiched panel with combustible components in a exterior cladding .
Nov 1, 2011 · 426 UNIVERSITY AVE - Building permit10 129668Closed
Proposal to demolish existing 3 storey office building, "Royal Canadian Military Institute". Future highrise development to be applied for at a later date.
Aug 10, 2010 · 426 UNIVERSITY AVE
Show 5 older records
- Zoning review10 173691 PSPClosedMay 12, 2010 · 426 UNIVERSITY AVE
- Building permit10 153825Closed
This alternative solution application has been prepared for the standpipe and hose system for 426 University Avenue in the City of Toronto. This is for the building to be known as the "ROYAL CANADIAN MILITARY INSTITUTE / TRIBUTE COMMUNITIES CONDOMINIUM"
Apr 16, 2010 · 426 UNIVERSITY AVE - Zoning review08 169426 PRZClosedJun 12, 2008 · 426 UNIVERSITY AVE
- Development application08 163452 STE 20 OZClosed
Zoning By Law Amendment for a proposed 42-storey (135 metre) mixed use building containing a private club (RCMI) at floors one to six and 312 residential units above with no parking proposed to be provided. Maintenance of the existing heritage facade, in conjunction witht the existing Royal Canadian Military Institute is proposed.
May 28, 2008 · 426 UNIVERSITY AVE - Development application08 163490 STE 20 SAClosed
Site Plan Approval for a proposed 42-storey (135 metre) mixed use building containing a private club (RCMI) at floors one to six and 312 residential units above with no parking proposed to be provided. Maintenance of the existing heritage facade, in conjunction witht the existing Royal Canadian Military Institute is proposed.
May 28, 2008 · 426 UNIVERSITY AVE
Check before you build
Zoning not in By-law 569-2013
Needs a closer lookThis lot is not covered by the citywide zoning by-law's map. It is probably still governed by a former municipal by-law, which this tool does not read yet.
Zoning By-law 569-2013
Lot facts
- Area
- 587 m²
- Frontage
- 16.6 m
- Depth
- 38.9 m
- Street
- University Ave
- Corner lot
- No
- Public lane
- None
- Max height
- —
- Max lot coverage
- —
- 2 City trees in front of this lot. The City's street tree inventory lists 2 trees at this address: elm (8 cm), honey locust (8 cm). Diameter is the trunk at breast height. Source
Around this lot
- Minor variances approved
- 100%8 of 8 decisions
- Garden suite permits
- 0
- Laneway suite permits
- 0
- Multiplex permits
- 0
- Development applications
- 30
Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 8 variance decisions: no more than at most Toronto houses (median 19).
Recent variance decisions in the same zone
- Minor varianceApproved
To alter the parking length standard for one residential parking space (Unit 11) on Parking Level 1 of the 32-storey mixed-use building, containing three levels of below grade parking.
292 DUNDAS ST W · Mar 4, 2026 · 208 m away - Minor varianceApproved
To alter the development standards (as approved under Site Specific Zoning By-law 588-2025) for a new 15-storey mixed-use building (East Block fronting Bay Street), by increasing the podium portions of the building heights, equipment height projections, and reducing the minimum height of the first storey. Also, the new 43-storey mixed-use building (West Block fronting Elizabeth Street) will be reducing the size of one parking space length. This is currently being reviewed under Site Plan Control (File Number 20 25 197844 STE 11 SA). There will be a total of 827 purpose-built rental units on this lot (617 residential dwelling units, and 210 affordable dwelling units).
130 ELIZABETH ST · Jan 14, 2026 · 310 m away - Minor varianceApproved
To alter the existing three-storey mixed-use building by converting the existing office space (Unit 1 located within the basement at the southern portion of the building) into medical office space with accessory uses.
150 BEVERLEY ST · Nov 19, 2025 · 479 m away - Minor varianceApproved
To alter the existing two-and-one-half-storey townhouse dwelling by constructing a rear two-storey addition with a platform and stairs, a third storey addition with a rear balcony, and a fourth storey rooftop deck with a staircase enclosure. There will be a total of three residential dwelling units on this lot (one unit occupying the basement and first level, one unit occupying the first and second level, and one unit occupying the second, third, and rooftop level).
3 GRANGE AVE · Nov 12, 2025 · 447 m away - Minor varianceApproved
To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a complete third storey addition, and a new rear three-storey addition (with a basement walkout level). Also, to construct a rear exterior staircase that will access each level. There will be a total of 4 residential dwelling units on this lot. The existing rear two-storey ancillary building will be maintained and unaltered.
28 D'ARCY ST · Feb 26, 2025 · 379 m away
Latest activity nearby
- Consent (lot split)Pending
To obtain consent to sever the property into two lots and to create new easements/rights-of-way.
123 EDWARD ST · Oct 2, 2027 · 237 m away - Consent (lot split)Pending
To obtain consent to sever a portion of land for the purpose of a lot addition, and to create and maintain easements/rights-of-way.
100 MCCAUL ST · Dec 16, 2026 · 233 m away - Building permit
Mechanical retrofit to improve building energy efficiency including working in various building Mechanical rooms and roofs. Work will be done on the chilled water, heating water and glycol piping networks. Equipment will be updated and replaced including rooftop air-source heat pumps, heat recovery chillers, updated air handling equipment, and steam network modifications.
124 EDWARD ST · Nov 25, 2026 · 268 m away - Zoning review
Closed
84 ST PATRICK ST · Nov 24, 2026 · 184 m away - Zoning review
Application On Hold
522 UNIVERSITY AVE · Nov 24, 2026 · 224 m away - Building permit
Interior Alteration of Existing Group D office- reconfigure existing office spaces, including dividing one room into two meeting rooms and opening another room to create an open workspace - 2nd Floor
190 SIMCOE ST · Nov 24, 2026 · 266 m away - Building permit
Proposal for interior alterations to existing office suite. To include HVAC, sprinkler alterations.
393 UNIVERSITY AVE · Nov 23, 2026 · 116 m away - Building permit
Proposal for interior alterations for Suite 2105 &2103
180 DUNDAS ST W · Nov 18, 2026 · 216 m away - Building permit
Interior alteration to existing office space (Unit 2200)
400 UNIVERSITY AVE · Nov 18, 2026 · 58 m away - Building permit
Tenant improvement to existing office suite located on the 8th floor of 375 University Avenue. No changes of use or exterior work proposed. No change to existing demising walls of suite.
375 UNIVERSITY AVE · Nov 17, 2026 · 132 m away
Neighbourhood: Kensington-Chinatown
About the area around the lot, not the lot itself.
- Nearest station
- St Patrick Station2 min walk
- Nearest TTC stop
- St Patrick Station - Southbound Platform1 min walk
- Nearest cycling route
- University AveCycle Track, 1 min walk
- Nearest traffic count
- 9,454 vehicles in 8 hDundas St W / Simcoe St, 90 m away, Apr 8, 2013
- Serious collisions within 500 m
- 42021–2026, killed or seriously injured: 0 fatal, 3 with pedestrians, 0 with cyclists
- Parks
- Gallery Park3 min walk
- Grange Park4 min walk
- St. Patricks Square6 min walk
Schools within 1 km
- OCAD UNIVERSITY - THE LEARNING ZONE University 2 min walk
- CONTACT ALTERNATIVE SCHOOL English Public 2 min walk
- OCAD UNIVERSITY - ANNEX BUILDING University 3 min walk
- OCAD UNIVERSITY - ROSALIE SHARP PAVILION University 3 min walk
- OCAD UNIVERSITY - MAIN BUILDING 416 977-6000 University 4 min walk
- OCAD UNIVERSITY - ABOVEGROUND ART SUPPLIES University 4 min walk
Being near a school does not mean the lot is in its catchment; check with the board.
2021 Census
| Figure | Kensington-Chinatown | Median neighbourhood |
|---|---|---|
| Median household income (2020) | $62,000 | $84,500 |
| Households that own their home | 32% | 54% |
| Population (2021) | 18,120 | 16,813 |
| Homes built in 1960 or before | 26% | 29% |
| Homes needing major repairs | 8% | 7% |
Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.
Police-reported crime, 2025
| Per 100,000 people | Kensington-Chinatown | City median |
|---|---|---|
| Assault | 2017.5 | 636.3 |
| Robbery | 193 | 69.5 |
| Shootings | 21.9 | 10.5 |
| Auto theft | 118.4 | 192.6 |
| Theft over $5,000 | 219.3 | 46.1 |
| Break and enter | 443 | 172.8 |
| Theft from vehicles | 850.8 | 188.1 |
Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.