HousePrecheckCheck an address

426 Queen St EToronto · zoning, lot size and permit records

Commercial residential · CR 3.5 (c1.0; r2.5) SS2 (x338)13.2 × 54.1 m704 m²on Queen St Ebacks onto Ln N Queen W Sackville St

Not a single house

A condominium parcel

The City's property boundaries show this parcel as a condominium: the homes on it are units of a condominium corporation, which owns the land and common elements. Build options for a house do not apply; the corporation's status certificate is the document to read before an offer.

Looking at a house nearby? What this means for you

  • A condominium on 0.1 haIts owners share the land and decide together on changes; expect more cars and visitors than a house.
  • Permits or applications open on this parcelStill open in the City's records: 11 126737 (install backflow prevention device, 2011, status Permit Issued). Larger work can mean noise and trucks next door; read what each one is for.
  • 5 development applications open within 300 m, up to 28 storeysNew buildings may go up around here in the next years. More change nearby than at 97% of Toronto houses.
  • Major Transit Station Area: Moss ParkThe City plans more homes around the station: good for transit, and more building over time.

Want to check this condo before you buy?

We are building checks for condominiums. Leave your email and we will tell you when it is ready.

N20 m
13.2 m frontage54.1 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • Heritage property: listed

    Needs a closer look

    On the City's Heritage Register. Demolition and exterior changes need heritage review.

    What it means. Renovations, additions and demolition can take longer, cost more or be refused. A listing is not registered on title, so a title search will not show it.

    How to confirm. Heritage Planning at the City confirms the status and what it covers. Details

    City of Toronto Heritage Register
  • Building permit open since 2011

    Needs a closer look

    Still open in the City's records: 11 126737 (install backflow prevention device, 2011, status Permit Issued).

    What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.

    How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)
  • 1 by-law investigation closed in the last two years

    Good to know

    Closed files (Zoning): 25 223963 ZON 00 IR (Zoning, 2025).

    What it means. Someone raised an issue here and the City closed the file. Ask the seller what it was about.

    City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations
  • 5 development applications open within 300 m

    Good to know

    5 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 28 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

10 records on file: more than at 99% of Toronto houses (median 0).

  • By-law investigation26 162319 WST 00 IRClosed

    Waste

    May 18, 2026 · 426 QUEEN ST E
  • By-law investigation26 130245 WST 00 IRClosed

    Waste

    Mar 16, 2026 · 426 QUEEN ST E
  • By-law investigation25 248570 WST 00 IRClosed

    Waste

    Nov 3, 2025 · 426 QUEEN ST E
  • By-law investigation25 223963 ZON 00 IRClosed

    Zoning

    Sep 11, 2025 · 426 QUEEN ST E
  • By-law investigation25 205698 WST 00 IRClosed

    Waste

    Aug 6, 2025 · 426 QUEEN ST E
  • By-law investigation25 186022 WST 00 IRClosed

    Waste

    Jun 30, 2025 · 426 QUEEN ST E
  • Building permit21 129071Closed

    Proposal for interior alterations to existing residential suite on the 4th floor - UNIT 406

    Jun 4, 2021 · 426 QUEEN ST E
  • Building permit17 134568Cancelled

    Proposal for interior alterations to existing residential suite on the 4th floor - Unit 406

    Mar 27, 2017 · 426 QUEEN ST E
Show 2 older records
  • Building permit11 126737Permit Issued

    install backflow prevention device

    Mar 3, 2011 · 426 QUEEN ST E
  • Building permit99 012248Closed

    INSTALL ON LIVE-WORK UNIT SUITE 405 ON 4TH FLOOR: 1 K.S., 1 DISHWASHER, 1 W.B. EDC SEE 391093

    Jan 8, 1999 · 426 QUEEN ST E

Check before you build

  • Site-specific exception 900.11.10(338)

    Needs a closer look

    6 site-specific rules and 9 older by-laws that still prevail apply to this lot. They can override the standard rules on this page.

    Zoning By-law 569-2013, Chapter 900
Exception 900.11.10(338)Applies

These parts of the exception apply to this lot's address.

  1. Rule A

    In the CR zone, a drive-through facility is not permitted

  2. Rule B

    These premises must comply with Exception 900.11.10(2)

  3. Rule C

    Despite regulation 40.5.40.10(4), equipment and structures on the roof of a building may not exceed the permitted maximum height

  4. Rule D

    If a lot with a building is identified as a heritage site , any portion of a building that exceeds the height of the conserved heritage building , whether an addition above the conserved heritage building or as a separate building on the same lot , must be set back from a lot line that abuts a street a distance equal to the original building setback of the conserved heritage building from that lot line that abuts a street , plus 5.0 metres

  5. Rule E

    Despite regulation 40.10.40.10(5), if a lot is abutting a lot with a building identified as a heritage site fronting on the same street , the height of the first storey may be less than 4.5 metres provided it is no less 3.7 metres

  6. Rule F

    Despite regulation 40.10.40.70(2)(E) and (F), (i) if a lot abuts a lot in the O, ON or OR zone or the Residential Zone category or Residential Apartment zone, no building or structure may penetrate a 45 degrees angular plane projected over the lot along the entire required rear yard setback , starting at a height of 10.5 metres above the average elevation of the ground along the rear lot line ; or (ii) if a lot is separated from a lot in the O, ON or OR zone or the Residential Zone catory by a lane, no building or structure may penetrate a 45 degrees angular plane projected over the lot , starting at a height of 10.5 metres above the average elevation of the ground along the entire rear lot line of the lot abutting the lane on the opposite side of the lane .

  7. Older by-law A

    Section 12 (1) 352 of former City of Toronto By-law 438-86

  8. Older by-law B

    Section 12 (2) 132 of former City of Toronto By-law 438-86

  9. Older by-law C

    Section 12 (2) 156 of former City of Toronto By-law 438-86

  10. Older by-law D

    Section 12 (2) 270 (a) of former City of Toronto By-law 438-86

  11. Older by-law E

    Former City of Toronto by-law 532-78

  12. Older by-law F

    Former City of Toronto by-law 59-82

  13. Older by-law G

    Former City of Toronto by-law 546-83

  14. Older by-law H

    Former City of Toronto by-law 547-83

  15. Older by-law I

    Former City of Toronto by-law 1990-0049

By-law 569-2013, Chapter 900

Lot facts

Area
704 m²
Frontage
13.2 m
Depth
54.1 m
Street
Queen St E
Corner lot
No
Public lane
Ln N Queen W Sackville St, 29.2 m along it
Max height
25 m
Max lot coverage
—
  • Major Transit Station Area: Moss Park. The lot is inside the Moss Park Major Transit Station Area approved by the Province (Site and Area Specific Policy 763). Source
  • Downtown Plan Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
  • Priority retail street: Queen Street East. The lot is on a priority retail street. In this zone at least 60% of the ground floor along that street must hold retail, restaurants, offices or similar uses, with entrances within 5 m of the lot line and 60% of the ground floor wall in windows or doors. Source
  • Downtown building setback overlay. Towers over 36 m here need extra setbacks above 24 m and 25 m between towers. Houses and other low buildings are not affected. Source
  • Zone CR 3.5 (c1.0; r2.5) SS2 (x338) (Commercial Residential). Chapter 40, section 40.10 of the by-law. Source
  • 1 City tree in front of this lot. The City's street tree inventory lists 1 tree at this address: kentucky coffeetree (8 cm). Diameter is the trunk at breast height. Source

Around this lot

Minor variances approved
83%20 of 24 decisions
Garden suite permits
0
Laneway suite permits
1
Multiplex permits
3
Development applications
14

Within 300 m, last 10 years. 4 suite and multiplex permits: more than at 54% of Toronto houses (median 3). 24 variance decisions: more than at 55% of Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To construct a new rear one-storey detached ancillary building (one-car garage) abutting the laneway.

    60 WASCANA AVE · Oct 14, 2026 · 488 m away
  • Minor varianceApproved

    To legalize and to maintain the interior ground floor staircase, leading to the mezzanine, which was constructed without an authorized building permit. It should be noted that access to the mezzanine was only from the exterior of the building.

    53 ONTARIO ST · Sep 23, 2026 · 472 m away
  • Minor varianceApproved

    The existing one-storey and two-storey commercial buildings (retail and daycare) will be maintained and unaltered.

    4 GILEAD PL · Sep 9, 2026 · 338 m away
  • Minor varianceApproved

    The existing undersized public parking lot will be maintained and unaltered.

    4 GILEAD PL · Sep 9, 2026 · 338 m away
  • Minor varianceApproved

    To permit and construct a second storey rooftop outdoor patio to be used as a children's play area. The existing two-storey non-residential detached building is under renovation for a day nursery (child care facility) as approved by Building Permit #25 143317 BLD 00 BA.

    14 EASTERN AVE · May 6, 2026 · 412 m away

Latest activity nearby

  • Building permit

    Proposal to add new washrooms on ground floor and second floor, finish basement, and interior alteration to add load bearing beams in basement and on ground floor.

    13 BRIGHT ST · Nov 24, 2026 · 249 m away
  • Zoning review

    Not Started

    290 SHUTER ST · Nov 17, 2026 · 282 m away
  • Zoning review

    Under Review

    339 QUEEN ST E · Nov 6, 2026 · 239 m away
  • Zoning review

    Under Review

    20 REGENT ST · Oct 27, 2026 · 231 m away
  • Building permit

    Proposed basement finishing, including new bathroom

    12 BRIGHT ST · Oct 23, 2026 · 242 m away
  • Zoning review

    Application Acceptable

    398 KING ST E · Oct 14, 2026 · 271 m away
  • Zoning review

    Closed

    234 PARLIAMENT ST · Oct 8, 2026 · 296 m away
  • Building permit

    Proposed basement finishing, including new bathroom

    12 BRIGHT ST · Oct 7, 2026 · 242 m away
  • Building permit

    REVISION - revised drawingsProposed commercial kitchen ventilation system.

    368 QUEEN ST E · Oct 5, 2026 · 144 m away
  • Building permit

    Demolish rear yard deteriorated stand alone building extension. The rear wall of the original building shall remain intact (addition was not connected to the existing building).

    314 QUEEN ST E · Sep 11, 2026 · 287 m away

Neighbourhood: Regent Park

About the area around the lot, not the lot itself.

Nearest station
Queen Station23 min walk
Nearest TTC stop
Queen St East at Sackville St1 min walk
Nearest cycling route
Shuter StCycle Track, 2 min walk
Nearest traffic count
7,538 vehicles in 14 hQueen St E / Sackville St, 60 m away, Sep 10, 2025
Serious collisions within 500 m
72021–2026, killed or seriously injured: 1 fatal, 4 with pedestrians, 2 with cyclists
Parks
Orphan's Green3 min walk
Bright Street Playground3 min walk
Sackville Playground3 min walk

Schools within 1 km

  • ST PAUL CATHOLIC ELEMENTARY SCHOOL English Separate 2 min walk
  • NELSON MANDELA PARK PUBLIC SCHOOL English Public 4 min walk
  • LIBERTY PREP SCHOOL Private 4 min walk
  • INGLENOOK COMMUNITY SCHOOL English Public 6 min walk
  • LORD DUFFERIN JR & SR PUBLIC SCHOOL English Public 10 min walk
  • GEORGE BROWN COLLEGE - YOUNG CENTRE FOR THE PERFORMING ARTS College 12 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureRegent ParkMedian neighbourhood
Median household income (2020)$65,500$84,500
Households that own their home30%54%
Population (2021)12,75016,813
Homes built in 1960 or before13%29%
Homes needing major repairs5%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleRegent ParkCity median
Assault947.8636.3
Robbery83.569.5
Shootings610.5
Auto theft95.4192.6
Theft over $5,00011.946.1
Break and enter166.9172.8
Theft from vehicles125.2188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
  • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.