HousePrecheckCheck an address

425 King St EToronto · zoning, lot size and permit records

Residential · R (d1.0) (x4)38.4 × 51.6 m1,961 m²on King St Ecorner, also on Erin St

Not a home

Little Trinity Church Grounds

The City of Toronto's real estate inventory lists Little Trinity Church Grounds here, on City land in City use. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Green space next doorShade, play and walks; busy parks also bring events and evening noise.
  • 12 development applications open within 300 m, up to 55 storeysNew buildings may go up around here in the next years. More change nearby than at 100% of Toronto houses.
  • Major Transit Station Area: CorktownThe City plans more homes around the station: good for transit, and more building over time.
N20 m
38.4 m frontage51.6 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • Heritage property: listed

    Needs a closer look

    On the City's Heritage Register. Demolition and exterior changes need heritage review.

    What it means. Renovations, additions and demolition can take longer, cost more or be refused. A listing is not registered on title, so a title search will not show it.

    How to confirm. Heritage Planning at the City confirms the status and what it covers. Details

    City of Toronto Heritage Register
  • 1 by-law investigation closed in the last two years

    Good to know

    Closed files (Property Standards): 25 172480 PRS 00 IR (Property Standards, 2025).

    What it means. Someone raised an issue here and the City closed the file. Ask the seller what it was about.

    City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations
  • 12 development applications open within 300 m

    Good to know

    12 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 55 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

2 records on file: more than at 72% of Toronto houses (median 0).

  • By-law investigation25 172480 PRS 00 IRClosed

    Property Standards

    Jun 5, 2025 · 425 KING ST E
  • Building permit11 131217Closed

    permit for interior alterations to existing place of worship. Interior alterations on basement and ground floor.

    Mar 29, 2011 · 425 KING ST E

Check before you build

  • Site-specific exception 900.2.10(4)

    Needs a closer look

    2 older by-laws that still prevail apply to this lot. They can override the standard rules on this page.

    Zoning By-law 569-2013, Chapter 900
Exception 900.2.10(4)Applies

These parts of the exception apply to this lot's address.

  1. Older by-law A

    The lands must comply with exception 900.2.10(7). Prevailing By-laws and Prevailing Sections: (A) Section 12(1) 232 of former City of Toronto By-law 438-86

  2. Older by-law B

    on 310 to 320 Gerrard Street East, former City of Toronto By-law 664-1991.

By-law 569-2013, Chapter 900

Lot facts

Area
1,961 m²
Frontage
38.4 m
Depth
51.6 m
Street
King St E
Corner lot
Yes, also on Erin St51.6 m along it
Public lane
None
House footprint
527 m²roof up to 25.3 m
Back yard
4.6 mhouse to rear lot line
Side yards
7 m and 16.9 mhouse to side lot lines
Buildings on the lot
1house, garage, sheds
Max height
13 m
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • Major Transit Station Area: Corktown. The lot is inside the Corktown Major Transit Station Area approved by the Province (Site and Area Specific Policy 764). Source
  • King-Parliament Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
  • Downtown building setback overlay. Towers over 36 m here need extra setbacks above 24 m and 25 m between towers. Houses and other low buildings are not affected. Source
  • Zone R (d1.0) (x4) (Residential). Chapter 10, section 10.10 of the by-law. Source
  • 1 City tree in front of this lot. The City's street tree inventory lists 1 tree at this address: maple, norway (65 cm). Diameter is the trunk at breast height. Source

Around this lot

Minor variances approved
100%14 of 14 decisions
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
0
Development applications
31

Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 14 variance decisions: no more than at most Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To construct a new rooftop stair enclosure (vestibule and storage area) for Unit 701, within this existing seven-storey detached building. The existing private rooftop elevator enclosure will be demolished.

    90 SUMACH ST · Jan 8, 2025 · 496 m away
  • Minor varianceRefused

    To alter the existing seven-storey apartment building by constructing a new third storey rooftop deck (for Unit 319), to be located on the roof above the existing parking garage, on the north side of the building. There will be a partition fence on the rooftop deck.

    90 SUMACH ST · Aug 14, 2024 · 496 m away
  • Minor varianceApproved

    To alter the existing two-storey townhouse dwelling by constructing a partial rooftop structure (pergola and wood deck above the existing flat roof dwelling), attached to the enclosed stair enclosure.

    29 SACKVILLE ST · Aug 14, 2024 · 213 m away
  • Minor varianceApproved

    To alter the existing two-storey rowhouse by reconstructing new rear decks on the first and second storeys. The second storey deck will be constructed with a canopy.

    1 ASHBY PL · Dec 6, 2023 · 484 m away
  • Minor varianceApproved

    To alter the existing two-storey semi-detached dwelling by constructing a third storey addition with a rear third storey terrace.

    387 SHUTER ST · Aug 24, 2022 · 476 m away

Latest activity nearby

  • Minor variancePending

    To alter the development standards for a new mixed-use development (automotive dealership at-grade with dwelling units above, as approved under Site Specific Zoning By-law 1306-2023), by increasing the maximum building height from 29-storeys (93 m) to 37-storeys (116.25 m), increasing residential and total gross floor areas, and reducing the minimum height of the first storey containing the automotive dealership. There will be a total of 303 residential dwelling units on this lot. A related Site Plan Control application (File #20 22 204774 STE 13 SA) is currently under review.

    550 ADELAIDE ST E · Dec 9, 2026 · 194 m away
  • Building permit

    2 wall signs + 1 projecting sign**PUR & SIMPLE**

    373 FRONT ST E · Nov 19, 2026 · 267 m away
  • Zoning review

    Not Started

    16 EASTERN AVE · Nov 6, 2026 · 128 m away
  • Zoning review

    Closed

    10 EASTERN AVE · Oct 28, 2026 · 94 m away
  • Zoning review

    Application Acceptable

    398 KING ST E · Oct 14, 2026 · 126 m away
  • Building permit

    2 wall signs + 1 projecting sign**PUR & SIMPLE**

    373 FRONT ST E · Oct 7, 2026 · 267 m away
  • Zoning review

    Closed

    14 EASTERN AVE · Oct 5, 2026 · 123 m away
  • Minor variancePending

    To alter the existing two-storey townhouse dwelling by constructing a side (west) third storey staircase enclosure, a rooftop deck with guardrails (wooden fence), and a rooftop pergola.

    21 SACKVILLE ST · Oct 5, 2026 · 215 m away
  • Zoning review

    Cancelled

    10 EASTERN AVE · Sep 29, 2026 · 94 m away
  • Zoning review

    Closed

    281 FRONT ST E · Sep 28, 2026 · 183 m away

Neighbourhood: Moss Park

About the area around the lot, not the lot itself.

Nearest station
King Station22 min walk
Nearest TTC stop
King St East at Parliament St2 min walk
Nearest cycling route
Adelaide St ECycle Track, 2 min walk
Nearest traffic count
3,928 vehicles in 8 hKing St E / Trinity St, 40 m away, Jul 6, 2016
Serious collisions within 500 m
72021–2026, killed or seriously injured: 1 fatal, 3 with pedestrians, 2 with cyclists
Parks
Little Trinity Church Lands1 min walk
40 Power St Park2 min walk
Orphan's Green2 min walk

Schools within 1 km

  • INGLENOOK COMMUNITY SCHOOL English Public 4 min walk
  • ST PAUL CATHOLIC ELEMENTARY SCHOOL English Separate 4 min walk
  • LIBERTY PREP SCHOOL Private 5 min walk
  • VOICE INTEGRATIVE PRIVATE SCHOOL Private 6 min walk
  • MARKET LANE JR & SR PUBLIC SCHOOL English Public 7 min walk
  • GEORGE BROWN COLLEGE - YOUNG CENTRE FOR THE PERFORMING ARTS College 7 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureMoss ParkMedian neighbourhood
Median household income (2020)$65,000$84,500
Households that own their home35%54%
Population (2021)21,49016,813
Homes built in 1960 or before17%29%
Homes needing major repairs8%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleMoss ParkCity median
Assault2226.8636.3
Robbery166.669.5
Homicide3.45.3
Shootings3.410.5
Auto theft81.6192.6
Theft over $5,00064.646.1
Break and enter350.2172.8
Theft from vehicles275.4188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
  • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.