HousePrecheckCheck an address

4245 Sheppard Ave EToronto · zoning, lot size and permit records

Commercial residential · CR 0.4 (c0.4; r0.0) SS3 (x323)47.0 × 94.4 m3,860 m²on Sheppard Ave E

Not a home

A commercial or mixed-use building

Its main building is large, in a commercial zone: shops, offices or a mixed-use building rather than one house. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Shops, offices or a mixed buildingCustomers, deliveries and evening activity; errands within a short walk.
  • 5 development applications open within 300 m, up to 35 storeysNew buildings may go up around here in the next years. More change nearby than at 85% of Toronto houses.
  • Major Transit Station Area: AgincourtThe City plans more homes around the station: good for transit, and more building over time.
N50 m
47.0 m frontage94.4 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • 5 development applications open within 300 m

    Good to know

    5 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 35 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

7 records on file: more than at 97% of Toronto houses (median 0).

  • Zoning review26 141937 ZZUCancelled
    Apr 10, 2026 · 4245 SHEPPARD AVE E
  • Zoning review20 203975 LPRClosed
    Oct 7, 2020 · 4245 SHEPPARD AVE E
  • Zoning review15 187400 LTOClosed
    Jul 8, 2015 · 4245 SHEPPARD AVE E
  • Building permit09 161117Closed

    RECONSTRUCT CONCRETE RETAINING WALL

    Sep 29, 2009 · 4245 SHEPPARD AVE E
  • Building permit05 104020Closed

    interior alterations existing use: doctors office proposed use: doctors office

    Jan 24, 2005 · 4245 SHEPPARD AVE E
  • Building permit04 176887Closed - Dormant

    HVAC - interior alterations to doctor's office - Interior Alterations

    Sep 27, 2004 · 4245 SHEPPARD AVE E
  • Building permit96 200103Closed

    FUTURE MULTI TENANT

    Sep 25, 1996 · 4245 SHEPPARD AVE E

Check before you build

  • Site-specific exception 900.11.10(323)

    Needs a closer look

    3 site-specific rules and 3 older by-laws that still prevail apply to this lot. They can override the standard rules on this page.

    Zoning By-law 569-2013, Chapter 900
Exception 900.11.10(323)Applies

These parts of the exception apply to this lot's address.

  1. Rule A

    The maximum gross floor area of all buildings is 0.4 times the area of the lot

  2. Rule B

    The minimum building setback from a lot line that abuts a street is: (i) the greater of 21.0 metres from the original centre line of Sheppard Ave. E. or 3.0 metres from a lot line abutting Sheppard Ave. E.; and (ii) the greater of 16.5 metres from the original centre line of Midland Ave. or 3.0 metres from a lot line abutting Midland Ave.

  3. Rule C

    The minimum building setback from the rear lot line is 7.5 metres. Prevailing By-laws and Prevailing Sections: (None Apply)

  4. Older by-law A

    The maximum gross floor area of all buildings is 0.4 times the area of the lot

  5. Older by-law B

    The minimum building setback from a lot line that abuts a street is: (i) the greater of 21.0 metres from the original centre line of Sheppard Ave. E. or 3.0 metres from a lot line abutting Sheppard Ave. E.; and (ii) the greater of 16.5 metres from the original centre line of Midland Ave. or 3.0 metres from a lot line abutting Midland Ave.

  6. Older by-law C

    The minimum building setback from the rear lot line is 7.5 metres. Prevailing By-laws and Prevailing Sections: (None Apply)

By-law 569-2013, Chapter 900

Lot facts

Area
3,860 m²
Frontage
47 m
Depth
94.4 m
Street
Sheppard Ave E
Corner lot
No
Public lane
None
House footprint
625 m²roof up to 7.7 m
Back yard
55 mhouse to rear lot line
Side yards
5.6 m and 14 mhouse to side lot lines
Buildings on the lot
1house, garage, sheds
Max height
11 m
Max lot coverage
33%

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • Major Transit Station Area: Agincourt. The lot is inside the Agincourt Major Transit Station Area approved by the Province (Site and Area Specific Policy 694). Source
  • Zone CR 0.4 (c0.4; r0.0) SS3 (x323) (Commercial Residential). Chapter 40, section 40.10 of the by-law. Source

Around this lot

Minor variances approved
—no decisions on file
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
0
Development applications
5

Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 0 variance decisions: no more than at most Toronto houses (median 19).

Latest activity nearby

  • Zoning review

    Closed

    4246 SHEPPARD AVE E · Nov 2, 2026 · 76 m away
  • Zoning review

    Closed

    8 GLEN WATFORD DR · Oct 29, 2026 · 142 m away
  • Building permit

    HVAC ductwork with existing RTU

    8 GLEN WATFORD DR · Oct 26, 2026 · 142 m away
  • Building permit

    Add interior walls, change ceilings and related mechanical items. [Wellness Centre] UNIT G-62

    8 GLEN WATFORD DR · Oct 13, 2026 · 142 m away
  • Zoning review

    Closed

    4246 SHEPPARD AVE E · Sep 18, 2026 · 76 m away
  • Zoning review

    Closed

    8 GLEN WATFORD DR · Jun 8, 2026 · 142 m away
  • Zoning review

    Closed

    8 GLEN WATFORD DR · Jun 3, 2026 · 142 m away
  • Zoning review

    Cancelled

    4245 SHEPPARD AVE E · Apr 10, 2026 · 14 m away
  • Zoning review

    Closed

    8 GLEN WATFORD DR · Apr 1, 2026 · 142 m away
  • Building permit

    Proposal for repair vehicle impact damages

    8 GLEN WATFORD DR · Jan 13, 2026 · 142 m away

Neighbourhood: Agincourt South-Malvern West

About the area around the lot, not the lot itself.

Nearest station
Agincourt GO Station11 min walk
Nearest TTC stop
Sheppard Ave East at Glen Watford Dr2 min walk
Nearest cycling route
Agincourt DrSharrows - Wayfinding, 11 min walk
Nearest traffic count
17,807 vehicles in 14 hSheppard Ave E / Glen Watford Dr, 80 m away, Oct 19, 2025
Serious collisions within 500 m
02021–2026, killed or seriously injured
Parks
Agincourt Park4 min walk
Garden Avenue Parkette5 min walk
Collingwood Park9 min walk

Schools within 1 km

  • UNIQUE CHINESE SCHOOL - MIDLAND CAMPUS Private 1 min walk
  • BLUE GENE EDUCATION SCHOOL Private 3 min walk
  • AGINCOURT MONTESSORI SCHOOL Private 3 min walk
  • AGINCOURT COLLEGIATE INSTITUTE English Public 7 min walk
  • AGINCOURT JR PUBLIC SCHOOL English Public 8 min walk
  • SIR ALEXANDER MACKENZIE SR PUBLIC SCHOOL English Public 9 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureAgincourt South-Malvern WestMedian neighbourhood
Median household income (2020)$79,500$84,500
Households that own their home70%54%
Population (2021)24,17016,813
Homes built in 1960 or before10%29%
Homes needing major repairs6%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleAgincourt South-Malvern WestCity median
Assault467636.3
Robbery94.869.5
Homicide75.3
Shootings21.110.5
Auto theft273.9192.6
Theft over $5,00038.646.1
Break and enter259.9172.8
Theft from vehicles242.3188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 28, 2026, published Nov 28, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 28, 2026, published Nov 27, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 28, 2026, published Nov 27, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 28, 2026, published Nov 27, 2026
  • Multi-tenant house licences: loaded Nov 28, 2026, published Nov 27, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 28, 2026, published Nov 27, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.