HousePrecheckCheck an address

420 Yonge StToronto · zoning, lot size and permit records

Open space · OR (x30)38.3 × 85.3 m2,781 m²on Yonge St

Not a home

A park or open space

The zoning by-law sets this parcel aside for parks and open space. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Green space next doorShade, play and walks; busy parks also bring events and evening noise.
  • 15 development applications open within 300 m, up to 85 storeysNew buildings may go up around here in the next years. More change nearby than at 100% of Toronto houses.
  • Major Transit Station Area: WellesleyThe City plans more homes around the station: good for transit, and more building over time.
N20 m
38.3 m frontage85.3 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • 15 development applications open within 300 m

    Good to know

    15 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 85 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

7 records on file: more than at 97% of Toronto houses (median 0).

  • By-law investigation26 174275 WST 00 IRClosed

    Waste

    May 30, 2026 · 420 YONGE ST
  • Development application25 191175 STE 11 OZClosed

    Official Plan Amendment and Zoning By-law Amendment application for three towers of 65, 75 and 96 storeys proposed above the existing designated heritage College Park building, which will form the base of the towers. A total of 2,342 residential units are proposed, including the replacement of 210 existing rental units, 6 additional rental replacement units, and 2,126 additional dwelling units. The proposal also includes 6,169 square metres of cultural space, a 1,537 square metre daycare facility, a 20,509 square metres of hotel space, 45,000 square metres of commercial and retail space and 600 square metres of new on-site parkland to expand the existing adjacent College Park.

    Jul 9, 2025 · 420 YONGE ST · City file
  • By-law investigation25 165503 SIN 00 IRClosed

    Signs

    May 26, 2025 · 420 YONGE ST
  • Building permit24 132794Cancelled

    New partition in Room MS-252, M-Level, multi-tenant floor. Alter plan to 23 152441 HVA 00 MS.

    Apr 5, 2024 · 420 YONGE ST
  • Building permit19 150681Closed

    HVAC - Alteration of Interior layout (open office, private offices and boardroom spaces), along with revision to HVAC and electrical components (Address: 777 R BAY Street, unit 1910).

    Jun 13, 2019 · 420 YONGE ST
  • Building permit16 130667Closed

    REVISION - structural changes as per the drawingsCollege Park - Podium deck repairs.

    May 5, 2017 · 420 YONGE ST
  • Building permit16 234454Cancellednew building

    REVISION - structural changes as per the drawingsProposal to construct a single storey service building to house zambonis for the future ice rink

    Apr 27, 2017 · 420 YONGE ST

Check before you build

  • Site-specific exception 900.42.10(30)

    Needs a closer look

    7 older by-laws that still prevail apply to this lot. They can override the standard rules on this page.

    Zoning By-law 569-2013, Chapter 900
Exception 900.42.10(30)Applies

These parts of the exception apply to this lot's address.

  1. Older by-law A

    Section 12(1) 334 of former City of Toronto By-law 438-86

  2. Older by-law B

    Section 12(1) 335 of former City of Toronto By-law 438-86

  3. Older by-law C

    Section 12(1) 397 of former City of Toronto By-law 438-86

  4. Older by-law D

    Section 12(1) 305 of former City of Toronto By-law 438-86

  5. Older by-law E

    Section 12(2) 132 of former City of Toronto By-law 438-86

  6. Older by-law F

    Section 12(2) 208 of former City of Toronto By-law 438-86

  7. Older by-law G

    Former City of Toronto by-laws 840-78, 41-79, 245-79, 834-79, 71-91 and City of Toronto by-law 1330-08.

By-law 569-2013, Chapter 900

Lot facts

Area
2,781 m²
Frontage
38.3 m
Depth
85.3 m
Street
Yonge St
Corner lot
No
Public lane
None
House footprint
106 m²
Back yard
—house to rear lot line
Buildings on the lot
2house, garage, sheds
Max height
61 m
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • Major Transit Station Area: Wellesley. The lot is inside the Wellesley Major Transit Station Area approved by the Province (Site and Area Specific Policy 602). Source
  • Downtown Plan Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
  • Downtown building setback overlay. Towers over 36 m here need extra setbacks above 24 m and 25 m between towers. Houses and other low buildings are not affected. Source
  • Zone OR (x30) (Open Space Recreation). Chapter 90, section 90.30 of the by-law. Source

Around this lot

Minor variances approved
100%12 of 12 decisions
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
1
Development applications
25

Within 300 m, last 10 years. 1 suite and multiplex permits: no more than at most Toronto houses (median 3). 12 variance decisions: no more than at most Toronto houses (median 19).

Latest activity nearby

  • Building permit

    Proposal for replacement of existing windows of office floors from Level 2-24.

    700 BAY ST · Nov 24, 2026 · 197 m away
  • Zoning review

    Closed

    450 YONGE ST · Nov 23, 2026 · 195 m away
  • Building permit

    Proposal for interior demolition of existing office floors from Level 2 - 24.

    700 BAY ST · Nov 23, 2026 · 197 m away
  • Building permit

    POST-TENSIONED CABLE REPLACEMENT, LOCALIZED CONCRETE REPAIRS, NEW WATERPROOFING INSTALLATION

    201 ELIZABETH ST · Nov 20, 2026 · 213 m away
  • Building permit

    Four wall signs.***INTERNATIONAL BUSINESS UNIVERSITY***

    655 BAY ST · Nov 19, 2026 · 215 m away
  • Building permit

    Interior alterations for a new medical office - Toronto Endoscopy Clinic - Unit 700

    790 BAY ST · Nov 19, 2026 · 197 m away
  • Building permit

    Interior demolition to the 3rd and 4th floors.

    77 GRENVILLE ST · Nov 18, 2026 · 278 m away
  • Building permit

    Proposed interior alterations to replace existing revolving door with security gate.See approved AS permit 26-229850-AS

    686 BAY ST · Nov 17, 2026 · 269 m away
  • Building permit

    Proposal for interior alterations to install 5 phone booths, sprinkler connections and new strobe lights

    777 BAY ST · Nov 2, 2026 · 152 m away
  • Building permit

    New water service and fire service to existing medical building, addition of back flow preventer on fire protection service. - site services

    790 BAY ST · Oct 29, 2026 · 197 m away

Neighbourhood: Yonge-Bay Corridor

About the area around the lot, not the lot itself.

Nearest station
College Station2 min walk
Nearest TTC stop
College Station - Southbound Platform2 min walk
Nearest cycling route
Gerrard St WCycle Track, 2 min walk
Nearest traffic count
26,759 vehicles in 14 hBay St / Gerrard St W, 160 m away, Apr 8, 2025
Serious collisions within 500 m
112021–2026, killed or seriously injured: 2 fatal, 7 with pedestrians, 3 with cyclists
Parks
College Park1 min walk
Joseph Sheard Parkette3 min walk
Alexander Street Parkette6 min walk

Schools within 1 km

  • TORONTO METROPOLITAN UNIVERSITY - THEATRE SCHOOL University 5 min walk
  • THE YMCA ACADEMY SECONDARY SCHOOL Private 7 min walk
  • TMU - HEASLIP HOUSE University 7 min walk
  • TAIE INTERNATIONAL INSTITUTE SCHOOL Private 7 min walk
  • TORONTO METROPOLITAN UNIVERSITY - ENTR TO BUSINESS SCHOOL LOBBY University 8 min walk
  • TORONTO METROPOLITAN UNIVERSITY - SCHOOL OF IMAGE ARTS University 8 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureYonge-Bay CorridorMedian neighbourhood
Median household income (2020)$68,500$84,500
Households that own their home32%54%
Population (2021)12,64516,813
Homes built in 1960 or before2%29%
Homes needing major repairs2%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleYonge-Bay CorridorCity median
Assault3361.1636.3
Robbery300.169.5
Homicide125.3
Shootings1210.5
Auto theft162.1192.6
Theft over $5,000210.146.1
Break and enter552.2172.8
Theft from vehicles402.1188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
  • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.