HousePrecheckCheck an address

42 Overlea BlvdToronto · zoning, lot size and permit records

Employment · EO 2.0 (e0.75; o2.0) (x1)240.2 × 206.4 m43,877 m²on Overlea Blvd

Not a home

An employment area

The zoning by-law sets this parcel aside for employment: offices, workshops and industry. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Offices, workshops or industryTrucks and noise in working hours, quiet at night; check what is made or stored there.
  • 1 development application open within 300 m, up to 50 storeysNew buildings may go up around here in the next years. More change nearby than at 55% of Toronto houses.
  • Major Transit Station Area: Thorncliffe ParkThe City plans more homes around the station: good for transit, and more building over time.
N50 m
240.2 m frontage206.4 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • Heritage property: designated (Part IV)

    Needs a closer look

    On the City's Heritage Register. Demolition and exterior changes need heritage review.

    What it means. Renovations, additions and demolition can take longer, cost more or be refused.

    How to confirm. Heritage Planning at the City confirms the status and what it covers. Details

    City of Toronto Heritage Register
  • 1 development application open within 300 m

    Good to know

    1 rezoning, site plan, subdivision or condominium application within 300 m, submitted in the last 10 years, is not closed yet, including buildings of up to 50 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

23 records on file: more than at 100% of Toronto houses (median 0).

  • By-law investigation26 256340 ELS 00 IRClosed

    Election Signs

    Oct 18, 2026 · 42 OVERLEA BLVD
  • By-law investigation25 265875 SNI 00 IVClosed

    Notice Issued Snow and Ice: Exterior areas including: steps, landings, walks, driveways, parking spaces, ramps have not been cleared of snow and ice within twenty four (24) hours of a snow; Failing to apply suitable material to slippery surface on steps, landings, walks, driveways, parking spaces, ramps or similar area of yard.

    Dec 11, 2025 · 42 OVERLEA BLVD
  • By-law investigation25 265501 SNI 00 IRClosed

    Snow and Ice

    Dec 11, 2025 · 42 OVERLEA BLVD
  • By-law investigation25 241829 SIN 00 IRClosed

    Signs

    Oct 19, 2025 · 42 OVERLEA BLVD
  • Building permit25 162009Closed

    The construction consists of the partial demolition of the existing Deli / Meat cooler and the installation of a New Sushi Rice room including equipment, fixtures and finishes. The work includes, but not limited to fire protection, fire alarm, refrigeration, mechanical, plumbing, and electrical / lighting systems.

    Jun 27, 2025 · 42 OVERLEA BLVD
  • Zoning review20 229874 ZPRClosed
    Dec 16, 2020 · 42 OVERLEA BLVD
  • Building permit18 175957Cancelled

    Suspended ceiling added to food service seating area and employee locker room - Costco

    Jul 5, 2018 · 42 OVERLEA BLVD
  • Building permit18 175968Cancelled

    Suspended ceiling added to food service seating area and employee locker room - Costco

    Jun 11, 2018 · 42 OVERLEA BLVD
Show 15 older records
  • Building permit17 135122Closednew building

    Revise to the floor area see attched cover letter. One storey retail building with fully automatic fire-protection and fire alarm system - Costco Wholesale Thorncliffe Park

    May 18, 2018 · 42 OVERLEA BLVD
  • Building permit18 139155Closed

    Proposal to install racking and storage system to new Costco (NB permit 17-135122)

    May 7, 2018 · 42 OVERLEA BLVD
  • Building permit18 122025Closed

    Installation of 23 electromagetic locking devices Electromagnetic Locks under building permit 17 135122.

    Mar 27, 2018 · 42 OVERLEA BLVD
  • Building permit17 194582Closed

    In conjunction with a one storey warehouse on the premises, proposal to erect and display two wall signs (one of which is illuminated and one non-illuminated), one illuminated overhanging structure sign and one non-illuminated ground sign, all displaying static copy. The illuminated wall sign is 2.67 metres vertically by 9.75 metres horizontally, the non-illuminated wall sign is 0.53 metres vertically by 5.28 metres horizontally, and the overhanging structure sign is 2.22 metres vertically by 8.13 metres horizontally located on the east elevation. The proposed ground sign is located at the south frontage, and contains two sign faces, each measuring 2.05 metres vertically by 5.59 metres horizontally at a height of 2.35 metres.**COSTCO WHOLESALE**

    Sep 18, 2017 · 42 OVERLEA BLVD
  • Building permit17 113568Closeddemolition

    Demolition of addition and portion of original building while salvaging the front and facing Overlea Blvd.

    Jun 2, 2017 · 42-46 OVERLEA BLVD
  • Building permit17 113609Cancelled

    Structural bracing to be installed during demolition to brace the walls and facade Overlea Blvd. which are to be salvaged.

    Feb 6, 2017 · 42-46 OVERLEA BLVD
  • Building permit14 262124Closed

    Proposed demolition of all interior partition walls (7,701m2) on all three floors of existing three storey office building.

    Feb 11, 2015 · 42-46 OVERLEA BLVD
  • Building permit13 199490Closeddemolition

    Demolition of Industrial Building the Coca Cola plant at 46 Overlea Blvd 17,652.00 m2.

    Nov 25, 2013 · 42-46 OVERLEA BLVD
  • Development application13 190927 NNY 26 OZClosed

    Rezoning application to permit a one-storey, 14,752 square metre retail warehouse facility (Costco Warehouse Membership Club) on the western portion of the site and an ancillary 4 island, 8 pump gas bar and surface parking lot containing 566 parking spaces on the eastern portion of the site. A portion of the existing office building formerly occupied by Coca Cola Refreshments Canada would be retained and integrated into the proposed warehouse facility. The former bottling plant building on the site has been demolished. An application for Site Plan Approval has also been submitted.

    Jun 19, 2013 · 42 OVERLEA BLVD
  • Development application13 190948 NNY 26 SAClosed

    Site Plan Approval application to construct a one-storey, 15,403 square metre retail warehouse facility (Costco Warehouse Membership Club) on the western portion of the site and surface parking lot containing 669 spaces on the eastern portion of the site. A portion of the existing office building formerly occupied by Coca Cola Refreshments Canada would be retained and incorporated into the proposed retail warehouse facility. The former bottling plant on the eastern portion of the site has been demloshed.

    Jun 19, 2013 · 42-46 OVERLEA BLVD · City file
  • Zoning review12 286589 ZZUClosed
    Nov 29, 2012 · 42-46 OVERLEA BLVD
  • Zoning review12 286584 ZZUClosed
    Nov 29, 2012 · 42-46 OVERLEA BLVD
  • Building permit11 299097Closed

    Coca Cola - Install backflow preventer

    Nov 10, 2011 · 42-46 OVERLEA BLVD
  • Building permit10 296772Closed

    Upgrade 10 existing mag locks door and adding emergency lighting and proper pulsation and colleted fire alarm pull station system on the basement and parking , ground and third floor.

    Dec 9, 2010 · 42-46 OVERLEA BLVD
  • Building permit02 122020Closed

    interior renovations

    Apr 23, 2002 · 42-46 OVERLEA BLVD

Check before you build

  • Site-specific exception 900.24.10(1)

    Needs a closer look

    6 site-specific rules and 6 older by-laws that still prevail apply to this lot. They can override the standard rules on this page.

    Zoning By-law 569-2013, Chapter 900
Exception 900.24.10(1)Applies

These parts of the exception apply to this lot's address.

  1. Rule A

    On 42 and 46 Overlea Boulevard, if the requirements of By-law 1308-2015 are complied with, none of the provisions of 60.40.20.100(6), 60.40.40.70(2)(A)(ii) and 200.5.10.1, apply to prevent the erection or use of a retail store if the retail store complies with

  2. Rule B

    to (E) below: (B) A retail store may have a single propane tank if it contains no more than 7,570 litres of propane

  3. Rule C

    The total gross floor area of the retail store must not exceed a maximum of 15,550 square metres

  4. Rule D

    The minimum west side yard setback of the retail store is 4.50 metres

  5. Rule E

    A retail store with a gross floor area up to 15,550 square metres must provide 623 parking spaces

  6. Rule F

    A building or structur e may be erected in accordance with (A) to (E) above, if all requirements of Schedule 'A' of By-law 1308-2015 are complied with. Prevailing By-laws and Prevailing Sections:(None Apply) (A) Section 8.4.1(c), Section 8.4.1(d) and Section 8.4.1(e), former Borough of East York Town of Leaside By-law No. 1916.

  7. Older by-law A

    On 42 and 46 Overlea Boulevard, if the requirements of By-law 1308-2015 are complied with, none of the provisions of 60.40.20.100(6), 60.40.40.70(2)(A)(ii) and 200.5.10.1, apply to prevent the erection or use of a retail store if the retail store complies with

  8. Older by-law B

    to (E) below: (B) A retail store may have a single propane tank if it contains no more than 7,570 litres of propane

  9. Older by-law C

    The total gross floor area of the retail store must not exceed a maximum of 15,550 square metres

  10. Older by-law D

    The minimum west side yard setback of the retail store is 4.50 metres

  11. Older by-law E

    A retail store with a gross floor area up to 15,550 square metres must provide 623 parking spaces

  12. Older by-law F

    A building or structur e may be erected in accordance with (A) to (E) above, if all requirements of Schedule 'A' of By-law 1308-2015 are complied with. Prevailing By-laws and Prevailing Sections:(None Apply) (A) Section 8.4.1(c), Section 8.4.1(d) and Section 8.4.1(e), former Borough of East York Town of Leaside By-law No. 1916.

By-law 569-2013, Chapter 900

Lot facts

Area
43,877 m²
Frontage
240.2 m
Depth
206.4 m
Street
Overlea Blvd
Corner lot
No
Public lane
None
House footprint
7,198 m²
Back yard
24 mhouse to rear lot line
Side yards
1.6 m and 167.8 mhouse to side lot lines
Buildings on the lot
6house, garage, sheds
Max height
—
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • Major Transit Station Area: Thorncliffe Park. The lot is inside the Thorncliffe Park Major Transit Station Area approved by the Province (Site and Area Specific Policy 767). Source
  • Zone EO 2.0 (e0.75; o2.0) (x1) (Employment Office). Chapter 60, section 60.40 of the by-law. Source
  • 5 City trees in front of this lot. The City's street tree inventory lists 5 trees at this address: hackberry (8 cm), hackberry (8 cm), kentucky coffeetree, espresso (8 cm). Diameter is the trunk at breast height. Source

Around this lot

Minor variances approved
100%4 of 4 decisions
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
0
Development applications
1

Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 4 variance decisions: no more than at most Toronto houses (median 19).

Latest activity nearby

  • Zoning review

    Closed

    60 OVERLEA BLVD · Oct 30, 2026 · 221 m away
  • Development application

    OPA & Rezoning Application proposes the development of a 50-storey mixed-use building providing residential, and commercial use at grade. The building will provide a total of 1,261 residential units, being a mix of bachelor - 3-bedroom units. The building will also provide non-res and a daycare at grade. A paved access from Thorncliffe Park Dr along the north property line will be provided, leading to 2 levels of below-grade parking, providing a total of 238 parking spaces; as well as 694 bicycle parking spaces. The proposed development provides a total GFA of 83,337.83 square metres and a FSI of 14.27. Additionally, the proposed development provides 2,810.79 square metres of indoor amenity space and 2,258.63 square metres of outdoor amenity space.

    60 OVERLEA BLVD · Oct 13, 2026 · 204 m away · City file
  • Building permit

    One third party ground sign for the JOLT charging station**JOLT**

    60 OVERLEA BLVD · Apr 16, 2026 · 221 m away
  • Building permit

    3 WALL SIGNS**DAWAT / TEHZEEB**

    60 OVERLEA BLVD · Mar 31, 2026 · 221 m away
  • Building permit

    1 Wall Sign

    45 OVERLEA BLVD · Jan 26, 2026 · 247 m away
  • Building permit

    Proposal to replace defective 3" DCVA Backflow Preventer located in north east sprinkler room.

    45 OVERLEA BLVD · Jan 12, 2026 · 247 m away
  • Zoning review

    Closed

    45 OVERLEA BLVD · Dec 25, 2025 · 247 m away
  • Building permit

    Proposal for sprinkler.

    90 THORNCLIFFE PARK DR · Nov 12, 2025 · 214 m away
  • Building permit

    Proposed interior alterations to existing restaurant.

    45 OVERLEA BLVD · Oct 28, 2025 · 247 m away
  • Building permit

    Rev 02Rev 01:REVISION TO EX. BLD PERMIT #24 195120 BLD 00 BA & #24 195120 HVA 00 MS (FRAMING FOR NEW RTU'S AND EXISTING WALL REMOVAL)Proposal for interior alterations to convert entire building to a community centre, place of assembly, including a banquet hall.

    90 THORNCLIFFE PARK DR · Jul 16, 2025 · 214 m away

Neighbourhood: Thorncliffe Park

About the area around the lot, not the lot itself.

Nearest station
Sunnybrook Park Station18 min walk
Nearest TTC stop
46 Overlea Blvd2 min walk
Nearest cycling route
Thorncliffe Park DrCycle Track, 5 min walk
Nearest traffic count
11,680 vehicles in 8 hOverlea Blvd to Thorncliffe Park Dr, 110 m away, Jul 17, 2019
Serious collisions within 500 m
42021–2026, killed or seriously injured: 0 fatal, 3 with pedestrians, 1 with cyclists
Parks
R.V. Burgess Park5 min walk
Leaside Park7 min walk
E.T. Seton Park8 min walk

Schools within 1 km

  • FRASER MUSTARD EARLY LEARNING ACADEMY English Public 6 min walk
  • THORNCLIFFE PARK PUBLIC SCHOOL English Public 6 min walk
  • OVERLEA LINC English Public 9 min walk
  • VALLEY PARK MDL SCHOOL English Public 16 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureThorncliffe ParkMedian neighbourhood
Median household income (2020)$67,000$84,500
Households that own their home14%54%
Population (2021)20,40016,813
Homes built in 1960 or before21%29%
Homes needing major repairs9%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleThorncliffe ParkCity median
Assault638636.3
Robbery83.969.5
Auto theft377.7192.6
Theft over $5,00054.646.1
Break and enter104.9172.8
Theft from vehicles226.6188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 28, 2026, published Nov 28, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 28, 2026, published Nov 27, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 28, 2026, published Nov 27, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 28, 2026, published Nov 27, 2026
  • Multi-tenant house licences: loaded Nov 28, 2026, published Nov 27, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 28, 2026, published Nov 27, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.