HousePrecheckCheck an address

42 Colborne StToronto · zoning, lot size and permit records

Also 46 Colborne St

Commercial residential · CR 4.0 (c3.0; r4.0) SS1 (x135)≈ 43.2 × 28.1 m927 m²on Colborne St

Not a home

A commercial or mixed-use building

Its main building is large, in a commercial zone: shops, offices or a mixed-use building rather than one house. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Shops, offices or a mixed buildingCustomers, deliveries and evening activity; errands within a short walk.
  • Permits or applications open on this parcelRecent records on this lot: 26 234780 (Proposed sprinkler design drawings including hydraulic calculations for interior altera..., 2026); 26 194927 (Proposed interior alterations to convert existing retail space to golf simulator facili..., 2026). Larger work can mean noise and trucks next door; read what each one is for.
  • 17 development applications open within 300 m, up to 80 storeysNew buildings may go up around here in the next years. More change nearby than at 100% of Toronto houses.
  • Major Transit Station Area: QueenThe City plans more homes around the station: good for transit, and more building over time.
N20 m
≈ 43.2 m frontage≈ 28.1 m deepirregular lot, estimated

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • Heritage property: in a Heritage Conservation District (Part V)

    Needs a closer look

    On the City's Heritage Register. Demolition and exterior changes need heritage review.

    What it means. Renovations, additions and demolition can take longer, cost more or be refused.

    How to confirm. Heritage Planning at the City confirms the status and what it covers. Details

    City of Toronto Heritage Register
  • Work or applications in progress

    Good to know

    Recent records on this lot: 26 234780 (Proposed sprinkler design drawings including hydraulic calculations for interior altera..., 2026); 26 194927 (Proposed interior alterations to convert existing retail space to golf simulator facili..., 2026).

    What it means. The owner has planned or started work. Ask what it covers, whether it will be finished before closing, and who pays for what is left.

    How to confirm. Application details and decisions are in the City's Application Information Centre. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards); City of Toronto, Development Applications
  • 1 Committee of Adjustment file on this lot

    Good to know

    1 approved. B0060/18TEY (To obtain consent to sever a portion of the land for the purpose of a lot addition and..., 2018).

    What it means. Approved variances and consents stay with the property, including any conditions in the decision. They allow what was approved, not more.

    How to confirm. Decisions are in the Application Information Centre; older files are available from the Committee of Adjustment office. Details

    City of Toronto, Committee of Adjustment applications (2001 onwards)
  • 17 development applications open within 300 m

    Good to know

    17 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 80 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

7 records on file: more than at 97% of Toronto houses (median 0).

  • Building permit26 234780Permit Issued

    Proposed sprinkler design drawings including hydraulic calculations for interior alteration for golf simulator facility with restaurant and bar. Related to permit # 26-194927 BLD 00 BA

    Oct 14, 2026 · 42 COLBORNE ST
  • Building permit26 194927Inspection

    Proposed interior alterations to convert existing retail space to golf simulator facility with restaurant and bar.Base building permit is under 65 King St E. GK

    Aug 26, 2026 · 42 COLBORNE ST
  • Consent (lot split)B0060/18TEYApproved

    To obtain consent to sever a portion of the land for the purpose of a lot addition and to create various easements/rights-of-way. This application is associated with consent applications B0036/18TEY, B0037/18TEY, B0039/18TEY and B0040/18TEY which collectively facilitate the creation of three stratified parcels for a commercial and office redevelopment scheme.

    Sep 20, 2018 · 46 COLBORNE ST
  • Development application17 260753 STE 28 SAClosed

    Site Plan Control application for a proposed 18-storey office development with retail uses at-grade, with a total gross floor area of 37,985.76 square metres, which will have frontage on both King Street East and Colborne Street. The proposal includes a new 6 metre wide private lane that will connect to the existing private lane located to the east of the Site. A total of 199 parking spaces will be provided on the Site below grade, and a total of 168 bicycle parking spaces will be provided.

    Nov 10, 2017 · 46 COLBORNE ST · City file
  • Development application17 219094 STE 28 CDClosed

    Draft Plan of Standard Condominium to permit a 25-storey mixed-use building with retail at grade and 254 residential units above. A total of 169 vehicular parking spaces are proposed.

    Aug 18, 2017 · 54 COLBORNE ST · City file
  • Development application15 258720 STE 28 OZClosed

    Proposed 18-storey office development with retail uses at-grade, with a total gross floor area of 37,775 square metres including 1,629 square metres of retail space at grade, which will have frontage on both King Street East and Colborne Street. The main pedestrian entrance to the building will be located at the corner of King Street East and Leader Lane. The proposal includes a new 6 metre wide private lane that will connect to the existing private lane located to the east of the Site. A total of 220 parking spaces will be provided on the Site below grade, and a total of 161 bicycle parking spaces will be provided.

    Nov 30, 2015 · 46 COLBORNE ST · City file
  • Development application12 130075 STE 28 OZClosed

    Proposal to construct a 25 storey, 77.3 metre (82.3 metres including mechanical penthouse) mixed-use building including 281 residential condominium units and 890 square metres of commercial uses at grade. The proposal also includes five levels of below-grade parking with 186 vehicle parking spaces. The proposal is for 54-70 Colborne Street & 101 King Street East. Also see site plan application 12 130079 STE 28 SA

    Feb 29, 2012 · 54 COLBORNE ST

Check before you build

  • Site-specific exception 900.11.10(135)

    Needs a closer look

    19 site-specific rules and 2 older by-laws that still prevail apply to this lot. They can override the standard rules on this page.

    Zoning By-law 569-2013, Chapter 900
Exception 900.11.10(135)Applies

These parts of the exception apply to this lot's address.

  1. Rule A

    On 65, 71, 73, 75, 77, 79, 83, 85 and 89 King Street East and 46 Colborne Street, if the requirements of Section 10 and Schedule A of By-law 552-2019(LPAT) are complied with, the erection or use of a building, structure , addition or enlargement that meets the requirements of

  2. Rule B

    to (S) below is permitted; (B) Despite Regulation 40.10.20.10(1), a dwelling unit is not a permitted use

  3. Rule C

    Despite Regulation 40.10.40.40, the maximum gross floor area is 38,500 square metres

  4. Rule D

    Despite Regulation 40.5.40.10(1), the height of a building or structure is measured as the distance from a Canadian Geodetic Datum elevation of 82.15 metres to the highest point of the building or structure

  5. Rule E

    Despite Regulations 40.10.40.10 and 40.5.40.10(4), the height of the building or structure or portion, including a mechanical penthouse, must not exceed the height in metres specified by the numbers following HT as shown on Diagram 6 of By-law 552-2019(LPAT)

  6. Rule F

    Despite Regulation 40.5.40.10(4) and Despite (E) above: (1) lightning rods may project above the height limits shown as 83.00 metres on Diagram 6; (ii) guardrails, safety railings, elements of a green roof, roofing materials including elements of exterior flooring, parapets may project above the height limits shown on Diagram 6 by no more than 2.0 metres; and (iii) vents, stacks, mechanical elements, heating/cooling towers, stair enclosures, lighting fixtures, elevator overrun and window washing equipment may project above the height limits shown on Diagram 6 by no more than 5.0 metres

  7. Rule G

    Despite Regulations 40.5.40.70 and 40.10.40.70 (1) and 600.10.10(1)(A): (i) the required building setbacks must be provided as shown on Diagram 6 of By-law 552-2019(LPAT); and (ii) with the exception of elements permitted by 9(F) and 9(H) of this by-law, a setback of at least 2.7 metres from the west side lot line adjacent to Leader Lane and a setback of at least 4.0 metres from the north lot line adjacent to King Street East is required within the Lower Setback Zone as illustrated on Diagram 6, for storeys 4 and 5 of the building, excluding the mezzanine level

  8. Rule H

    Despite (G) above: (i) canopies, awnings, building cornices, lighting fixtures, ornamental elements, parapets, trellises, eaves, window sills, guardrails, balustrades, railings, stairs, stair enclosures, wheel chair ramps, vents, underground garage ramps, landscape and green roof elements, wind mitigation, architectural cladding and design features, window washing equipment and public art features may project beyond the building envelope shown in Diagram 6

  9. Rule I

    Despite Regulation 40.5.40.10(5), a mechanical penthouse may occupy the entire Mechanical Penthouse Area as illustrated on Diagram 6

  10. Rule J

    Despite Regulation 40.10.40.10(5), the minimum height of the first storey may be less than 4.5 metres

  11. Rule K

    Despite Regulation 40.10.20.10, the only permitted uses on the ground floor facing King Street East or Colborne Street are retail store, retail service, eating establishment , take-out eating establishment, personal service shop, financial institution, wellness centre, recreation use , art gallery, and automated banking machine, artist studio, massage therapy, day nursery, and office lobby, provided such uses located in the space facing King Street East are divided into a minimum of two units, not including the lobby for the office tower or any such uses within the office lobby

  12. Rule L

    Despite Regulation 40.10.20.100(17), the maximum interior floor area of all retail services may exceed 400 square metres

  13. Rule M

    Despite Regulations 200.5.10.1 and 200.15.10, parking spaces must be provided and maintained below grade in accordance with the following: (i) a minimum of 125 parking spaces ; (ii) a maximum of 211 parking spaces ; and (iii) a minimum of 6 accessible parking spaces

  14. Rule N

    Despite Regulation 230.5.10.1(1), bicycle parking spaces must be provided and maintained on the lands in accordance with the following: (i) a minimum of 85 short-term bicycle parking spaces ; (ii) a minimum of 78 long-term bicycle parking spaces ; and (iii) the required long-term bicycle parking spaces must be located either on the ground floor or on parking level 1 (P1)

  15. Rule O

    Despite Regulation 230.5.1.10(10), "short-term" bicycle parking spaces may also be located in a stacked bicycle parking space

  16. Rule P

    Despite Regulation 200.5.1.10(2), 11 parking spaces may have a minimum width of 2.6 metres when obstructed on one side

  17. Rule Q

    Despite Regulation 40.10.100.10(1), two vehicle accesses are permitted

  18. Rule R

    Despite Regulation 40.10.90.40(3), loading spaces located in a building may have their vehicle access through a main wall that faces a street

  19. Rule S

    Despite Regulation 40.10.40.50(2), a minimum of 159 square metres of outdoor amenity space must be provided

  20. Older by-law A

    Section 12(1) 397 of former City of Toronto By-law 438-86

  21. Older by-law B

    Section 12(2) 132 of former City of Toronto By-law 438-86.

By-law 569-2013, Chapter 900

Lot facts

Area
927 m²
Frontage
43.2 mestimated, irregular lot
Depth
28.1 mestimated, irregular lot
Street
Colborne St
Corner lot
No
Public lane
None
House footprint
708 m²
Back yard
0 mhouse to rear lot line
Side yards
0.3 m and 8.4 mhouse to side lot lines
Buildings on the lot
4house, garage, sheds
Max height
23 m
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • Major Transit Station Area: Queen. The lot is inside the Queen Major Transit Station Area approved by the Province (Site and Area Specific Policy 605). Source
  • Downtown Plan Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
  • Downtown building setback overlay. Towers over 36 m here need extra setbacks above 24 m and 25 m between towers. Houses and other low buildings are not affected. Source
  • Zone CR 4.0 (c3.0; r4.0) SS1 (x135) (Commercial Residential). Chapter 40, section 40.10 of the by-law. Source

Around this lot

Minor variances approved
89%8 of 9 decisions
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
0
Development applications
31

Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 9 variance decisions: no more than at most Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To alter the existing 12-storey mixed-use building by enclosing the front outdoor patio of the ground floor eating establishment (restaurant).

    20 KING ST W · Jun 17, 2026 · 298 m away
  • Minor varianceApproved

    To permit a reduction in the number of required resident parking spaces and nine obstructed parking spaces, on-site.

    89 CHURCH ST · Jan 15, 2025 · 316 m away
  • Minor varianceApproved

    To alter the development standards (as approved under Site Specific Zoning By-law 552-2019(LPAT)), for the existing four-storey commercial/office building, by permitting the dwelling unit use through the conversion of the second and third storeys from commercial/offices uses into residential dwelling units (live/work units). Also, to permit a new residential lobby, facing King Street East. No visitor parking spaces and accessible parking spaces will be provided on-site. There will be a total of three commercial units and 11 residential dwelling units (7 dwelling units and 1 commercial unit on the second level, and 4 dwelling units and 2 commercial units on the third level) within this mixed-use building.

    71 KING ST E · Dec 11, 2024 · 36 m away
  • Minor varianceApproved

    To alter the development standards (as approved under Site Specific Zoning By-laws 218-2021 and 219-2021), for a new 34-storey mixed-use building (which is currently under construction), by reducing the minimum number of vehicular parking spaces. There will be a total of 369 residential dwelling units on this lot.

    90 QUEEN ST E · Oct 23, 2024 · 499 m away
  • Minor varianceApproved

    To alter the development standards for the 33-storey mixed-use building (approved under Site Specific Zoning By-Law 1195-2022), by converting the required office use space into hotel use space (for 142 hotel suites and related facilities) on floors 1 through 10. The site is subject to a current Site Plan Control Application (File 2017 235087 STE 28 SA).

    34 KING ST E · Sep 25, 2024 · 124 m away

Latest activity nearby

  • Zoning review

    Application On Hold

    91 FRONT ST E · Nov 24, 2026 · 271 m away
  • Building permit

    Proposal for interior alteration to existing office suites 208, 216, 230 and 306

    56 THE ESPLANADE · Nov 23, 2026 · 244 m away
  • Building permit

    Modification of the existing sprinkler system for a new tenant layout (Cubecom) on the 6th floor. Related Permit no. 26 223212 BLD 00 BA

    4 KING ST W · Nov 23, 2026 · 255 m away
  • Building permit

    Revision No.1: New Fire Shutter Window

    30 ADELAIDE ST E · Nov 20, 2026 · 236 m away
  • Building permit

    Installation of 2 Double (9th Floor) and 3 Double (10th Floor) Electromagnetic locks using a power supply system

    1 ADELAIDE ST E · Nov 18, 2026 · 255 m away
  • Building permit

    Proposed interior alterations for washroom and elevator lobby finish upgrades.

    4 KING ST W · Nov 18, 2026 · 255 m away
  • Building permit

    Proposed cooling Tower Replacement scope on the roof and mechanical room, along with one heating coil replacement.

    33 YONGE ST · Nov 17, 2026 · 214 m away
  • Building permit

    Proposal for additions and interior alterations to existing Nightclub at 17-19 Toronto St.

    19 TORONTO ST · Nov 16, 2026 · 155 m away
  • Building permit

    Revision 01 - Revisions to address clarify structural concerns and complete phase 2 of heating system retrofit.----------------------------------------------------------Replacement of existing heating system with Air Source Heat Pumps and a back up condensing boiler. Mechanical room update to renew building pumps.

    6 ADELAIDE ST E · Nov 9, 2026 · 279 m away
  • Building permit

    Proposed localized concrete repairs for the below grade basements to address spalding concrete and minor water penetration.

    69 YONGE ST · Nov 9, 2026 · 187 m away

Neighbourhood: Downtown Yonge East

About the area around the lot, not the lot itself.

Nearest station
King Station3 min walk
Nearest TTC stop
King St East at Church St West Side1 min walk
Nearest cycling route
Adelaide St ECycle Track, 3 min walk
Nearest traffic count
6,090 vehicles in 8 hKing St E / Church St, 100 m away, Jun 29, 2023
Serious collisions within 500 m
172021–2026, killed or seriously injured: 2 fatal, 9 with pedestrians, 4 with cyclists
Parks
Berczy Park2 min walk
Courthouse Square Park2 min walk
Toronto Sculpture Garden2 min walk

Schools within 1 km

  • KEYSTONE INTERNATIONAL SCHOOLS Private 3 min walk
  • VICTORIA STREET LINC English Public 5 min walk
  • DOWNTOWN ALTERNATIVE SCHOOL English Public 7 min walk
  • GEORGE BROWN COLLEGE - ST JAMES CAMPUS College 7 min walk
  • ST MICHAEL CATHOLIC ELEMENTARY SCHOOL - BLDG 1 English Separate 8 min walk
  • ST MICHAEL'S CHOIR SCHOOL - GYMNASIUM BLDG English Separate 11 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureDowntown Yonge EastMedian neighbourhood
Median household income (2020)$69,500$84,500
Households that own their home36%54%
Population (2021)17,70016,813
Homes built in 1960 or before7%29%
Homes needing major repairs4%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleDowntown Yonge EastCity median
Assault2360.8636.3
Robbery143.369.5
Shootings11.910.5
Auto theft75.6192.6
Theft over $5,00099.546.1
Break and enter274.7172.8
Theft from vehicles390.1188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 28, 2026, published Nov 28, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 28, 2026, published Nov 27, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 28, 2026, published Nov 27, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 28, 2026, published Nov 27, 2026
  • Multi-tenant house licences: loaded Nov 28, 2026, published Nov 27, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 28, 2026, published Nov 27, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.