HousePrecheckCheck an address

42-56 Wyatt WalkToronto · zoning, lot size and permit records

Also 110 River St, 114 River St, 15 Tubman Ave, 17 Tubman Ave, 19 Tubman Ave and 13 more

53.0 × 81.8 m4,287 m²on Tubman Avecorner, also on Wyatt Ave

Not a home

A commercial or mixed-use building

19 different civic addresses share this parcel, outside the citywide zoning by-law: shops, offices or a mixed-use building rather than one house. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Shops, offices or a mixed buildingCustomers, deliveries and evening activity; errands within a short walk.
  • 9 development applications open within 300 m, up to 48 storeysNew buildings may go up around here in the next years. More change nearby than at 100% of Toronto houses.
N20 m
53.0 m frontage81.8 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • 2 by-law investigations closed in the last two years

    Good to know

    Closed files (Property Standards): 25 172640 PRS 00 IR (Property Standards, 2025); 25 132760 PRS 00 IR (Property Standards, 2025).

    What it means. Someone raised an issue here and the City closed the file. Ask the seller what it was about.

    City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations
  • 9 development applications open within 300 m

    Good to know

    9 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 48 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

6 records on file: more than at 95% of Toronto houses (median 0).

  • By-law investigation25 172640 PRS 00 IRClosed

    Property Standards

    Jun 5, 2025 · 110 RIVER ST
  • By-law investigation25 132760 PRS 00 IRClosed

    Property Standards

    Mar 21, 2025 · 110 RIVER ST
  • Building permit20 165487Closed

    Rev 01 - Add new door between tenant space and stair D and structural reinforcing to suit new opening for doorProposed interior alterations to suit new Toronto Community Housing Tenant Services office

    Feb 17, 2021 · 110 RIVER ST
  • Building permit18 242707Closed

    Proposal for interior alteration on the 1st floor of the existing building.

    Nov 13, 2018 · 110 RIVER ST
  • Building permit15 247214Cancelled

    Part Permit - Proposal to construct a 29 storey & 10 storey midrise above a 2 storey podium rental TCHC apartment with 276 units, 1 level of below grade parking, and commercial at grade. Regent Park, Block 27. Convenience address - 110 River St.

    Oct 3, 2016 · 110 RIVER ST
  • Development application14 234229 STE 28 SAClosed

    To obtain site plan approval for the construction of 29 storey TCHC rental housing building and 10 storey TCHC rental housing building containing 276 residential units, and 110 below grade parking spaces. Retail space will be provided at grade fronting on to Dundas St E.

    Oct 7, 2014 · 110 RIVER ST

Check before you build

  • Zoning not in By-law 569-2013

    Needs a closer look

    This lot is not covered by the citywide zoning by-law's map. It is probably still governed by a former municipal by-law, which this tool does not read yet.

    Zoning By-law 569-2013

Lot facts

Area
4,287 m²
Frontage
53 m
Depth
81.8 m
Street
Tubman Ave
Corner lot
Yes, also on Wyatt Ave81.8 m along it
Public lane
None
House footprint
2,531 m²
Back yard
4.5 mhouse to rear lot line
Side yards
2.3 m and 3.6 mhouse to side lot lines
Buildings on the lot
12house, garage, sheds
Max height
—
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

    Around this lot

    Minor variances approved
    94%16 of 17 decisions
    Garden suite permits
    0
    Laneway suite permits
    0
    Multiplex permits
    0
    Development applications
    25

    Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 17 variance decisions: no more than at most Toronto houses (median 19).

    Recent variance decisions in the same zone

    • Minor varianceApproved

      To construct a new rear one-storey detached ancillary building (one-car garage) abutting the laneway.

      60 WASCANA AVE · Oct 14, 2026 · 306 m away
    • Minor varianceApproved

      To construct a one-storey detached ancillary building (two-car garage) in the rear yard, abutting the laneway.

      28 SWORD ST · Apr 29, 2026 · 428 m away
    • Minor varianceApproved

      To alter the development standards for the 34-storey mixed-use building (approved under Site Specific Zoning By-Law 839-2021), by increasing the height and number of storeys (from 34-storeys to 40-storeys (including a 6-storey podium)), gross floor area, number of dwelling units, and permitted projections to accommodate the garbage vent chute and mechanical penthouse. Also, to reduce the percentage of the required two or three bedroom dwelling units or larger, building setbacks, resident parking spaces, bicycle parking spaces, and the width of stacked bicycle parking spaces. There will be a total of 527 residential dwelling units on this lot and modify the building setbacks. A related Site Plan Control Application (File Number 20 208677 STE 13 SA) is approved with conditions.

      111 RIVER ST · Jan 28, 2026 · 71 m away
    • Minor varianceApproved

      To alter the existing one-storey detached building by permitting a vehicle service shop use on this lot.

      131 RIVER ST · Oct 29, 2025 · 89 m away
    • Minor varianceApproved

      To construct a new rooftop stair enclosure (vestibule and storage area) for Unit 701, within this existing seven-storey detached building. The existing private rooftop elevator enclosure will be demolished.

      90 SUMACH ST · Jan 8, 2025 · 391 m away

    Latest activity nearby

    • Building permit

      Two wall signs.***BMW***

      740 DUNDAS ST E · Nov 23, 2026 · 168 m away
    • Zoning review

      Application On Hold

      740 DUNDAS ST E · Nov 20, 2026 · 168 m away
    • Zoning review

      Not Started

      480 SHUTER ST · Nov 19, 2026 · 238 m away
    • Building permit

      REV 01: Revisions as per bubbled changesProposed interior alterations of a new restaurant including minor architectural, HVAC, plumbing, & electrical work 'Taco Bell'.

      650 DUNDAS ST E · Nov 10, 2026 · 137 m away
    • Building permit

      Proposal to install new smoke alarms and monitoring modules to provide individual suite nnunciation on the fire alarm system.

      146 SUMACH ST · Oct 30, 2026 · 242 m away
    • Zoning review

      Closed

      650 DUNDAS ST E · Oct 29, 2026 · 137 m away
    • Zoning review

      Not Started

      7 LABATT AVE · Oct 21, 2026 · 206 m away
    • Building permit

      Replacement of domestic water heating system & heating boilers, piping and accessories in basement and penthouse.

      220 OAK ST · Oct 21, 2026 · 269 m away
    • Building permit

      Replacement of domestic water heating system & heating boilers, piping and accessories in basement and penthouse.

      220 OAK ST · Oct 7, 2026 · 269 m away
    • Building permit

      Replacement of domestic water heating system & heating boilers, piping and accessories in basement and penthouse.

      220 OAK ST · Oct 7, 2026 · 269 m away

    Neighbourhood: Regent Park

    About the area around the lot, not the lot itself.

    Nearest station
    Castle Frank Station27 min walk
    Nearest TTC stop
    River St at Dundas St East South Side1 min walk
    Nearest cycling route
    Dundas St ECycle Track, 1 min walk
    Nearest traffic count
    18,635 vehicles in 14 hDundas St E / River St, 60 m away, Jul 3, 2025
    Serious collisions within 500 m
    52021–2026, killed or seriously injured: 1 fatal, 3 with pedestrians, 2 with cyclists
    Parks
    Regent Park Athletic Grounds1 min walk
    Oak Street Park2 min walk
    Regent Park3 min walk

    Schools within 1 km

    • NELSON MANDELA PARK PUBLIC SCHOOL English Public 5 min walk
    • SPRUCECOURT JR PUBLIC SCHOOL English Public 10 min walk
    • ST PAUL CATHOLIC ELEMENTARY SCHOOL English Separate 10 min walk
    • LORD DUFFERIN JR & SR PUBLIC SCHOOL English Public 11 min walk
    • SEED ALTERNATIVE SCHOOL English Public 11 min walk
    • QUEEN ALEXANDRA MDL SCHOOL English Public 11 min walk

    Being near a school does not mean the lot is in its catchment; check with the board.

    2021 Census

    FigureRegent ParkMedian neighbourhood
    Median household income (2020)$65,500$84,500
    Households that own their home30%54%
    Population (2021)12,75016,813
    Homes built in 1960 or before13%29%
    Homes needing major repairs5%7%

    Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

    Police-reported crime, 2025

    Per 100,000 peopleRegent ParkCity median
    Assault947.8636.3
    Robbery83.569.5
    Shootings610.5
    Auto theft95.4192.6
    Theft over $5,00011.946.1
    Break and enter166.9172.8
    Theft from vehicles125.2188.1

    Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

    Something here not right?

    Sources

    • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
    • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
    • Development applications: Rezoning, site plan, subdivision and condominium applications.
    • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
    • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
    • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
    • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
    • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
    • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
    • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
    • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
    • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
    • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
    • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
    • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
    • Address points: loaded Nov 22, 2026, published Nov 20, 2026
    • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
    • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
    • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
    • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
    • Committee of Adjustment open applications: loaded Nov 28, 2026, published Nov 27, 2026
    • Committee of Adjustment decisions: loaded Nov 28, 2026, published Nov 27, 2026
    • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
    • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
    • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
    • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
    • Development applications: loaded Nov 28, 2026, published Nov 28, 2026
    • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
    • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
    • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
    • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
    • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
    • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
    • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigations: loaded Nov 28, 2026, published Nov 27, 2026
    • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
    • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
    • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
    • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
    • Active building permits: loaded Nov 28, 2026, published Nov 27, 2026
    • Cleared building permits: loaded Nov 28, 2026, published Nov 27, 2026
    • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
    • Preliminary zoning reviews: loaded Nov 28, 2026, published Nov 27, 2026
    • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
    • RentSafeTO evaluations: loaded Nov 28, 2026, published Nov 27, 2026
    • Multi-tenant house licences: loaded Nov 28, 2026, published Nov 27, 2026
    • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
    • School locations: loaded Oct 14, 2026, published May 27, 2026
    • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
    • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
    • Short-term rental registrations: loaded Nov 28, 2026, published Nov 27, 2026
    • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
    • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
    • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
    • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
    • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
    • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

    Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

    Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

    Flag an error

    What is not right?

    The problem

    The records come from the City's open data; we check each flag against them. Your email is used only to answer this.