HousePrecheckCheck an address

4155 Yonge StToronto · zoning, lot size and permit records

Open space · ON≈ 64.8 × 138.9 m2,984 m²on Yonge Stcorner, also on William Carson Cres

Not a home

Carpark 408

The City of Toronto's real estate inventory lists Carpark 408 here, on City land in City use. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Transit, rail or parkingGood access, with trains, buses or cars and some noise.
  • 1 development application open within 300 mNew buildings may go up around here in the next years. More change nearby than at 68% of Toronto houses.
  • Major Transit Station Area: York MillsThe City plans more homes around the station: good for transit, and more building over time.
N50 m
≈ 64.8 m frontage≈ 138.9 m deepirregular lot, estimated

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • TRCA regulated area (100% of lot)

    Needs a closer look

    Part of the lot is near a valley, floodplain, shoreline or wetland. Work there needs a TRCA permit and may be restricted.

    What it means. Additions, pools and new buildings in the regulated part need a TRCA permit and may be refused. Ask your insurer about flood coverage.

    How to confirm. A TRCA property inquiry letter says which policies apply ($385, at least two weeks). Details

    Ontario Regulation 41/24, TRCA Regulation Limit
  • Ravine and natural feature protection (100% of lot)

    Needs a closer look

    Part of the lot is in the area covered by the City's Ravine and Natural Feature Protection By-law. The City's map of the area was last published in 2019.

    What it means. In that part, injuring or removing a tree of any size, grading, filling or dumping needs a City permit. Plans for a pool, addition or garden suite there may be refused.

    How to confirm. Urban Forestry confirms where the protected area runs and whether work needs a permit. Details

    Toronto Municipal Code, Chapter 658
  • Natural Heritage System (96% of lot)

    Good to know

    Part of the lot is in the Natural Heritage System shown on Official Plan Map 9.

    What it means. New buildings or additions in that part need a natural heritage impact study.

    How to confirm. City Planning confirms the policies that apply. Details

    City of Toronto Official Plan, Map 9
  • 4 by-law investigations closed in the last two years

    Good to know

    Closed files (Notice Issued Prop Standards, Property Standards): 26 148111 PRS 00 IV (Notice Issued Prop Standards: The yards and /or other part of property is not being kep..., 2026); 26 142489 PRS 00 IR (Property Standards, 2026); 25 261824 PRS 00 IR (Property Standards, 2025); and 1 more.

    What it means. Someone raised an issue here and the City closed the file. Ask the seller what it was about.

    City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations
  • 1 development application open within 300 m

    Good to know

    1 rezoning, site plan, subdivision or condominium application within 300 m, submitted in the last 10 years, is not closed yet. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

22 records on file: more than at 100% of Toronto houses (median 0).

  • By-law investigation26 251917 LGW 00 IRRescheduled

    Long Grass and Weeds

    Oct 8, 2026 · 4155 YONGE ST
  • By-law investigation26 180464 LGW 00 IRClosed

    Long Grass and Weeds

    Jun 9, 2026 · 4155 YONGE ST
  • By-law investigation26 177748 WST 00 IVClosed

    Notice Issued Waste: Owner of land failed to clean and clear refuse that has been thrown, placed, dumped or deposited, including but not limited to tree branches/yard waste, concret

    Jun 4, 2026 · 4155 YONGE ST
  • By-law investigation26 177736 WST 00 IRClosed

    Waste

    Jun 4, 2026 · 4155 YONGE ST
  • By-law investigation26 166217 LGW 00 IRClosed

    Long Grass and Weeds

    May 25, 2026 · 4155 YONGE ST
  • By-law investigation26 148111 PRS 00 IVClosed

    Notice Issued Prop Standards: The yards and /or other part of property is not being kept clean and free from accumulation of junk, rubbish, brush, refuse, litter, garbage and/or other debris

    Apr 13, 2026 · 4155 YONGE ST
  • By-law investigation26 142489 PRS 00 IRClosed

    Property Standards

    Apr 13, 2026 · 4155 YONGE ST
  • By-law investigation25 261824 PRS 00 IRClosed

    Property Standards

    Dec 3, 2025 · 4155 YONGE ST
Show 14 older records
  • By-law investigation25 256910 LGW 00 IVClosed

    Notice Issued Long Grass

    Nov 19, 2025 · 4155 YONGE ST
  • By-law investigation25 256255 LGW 00 IRClosed

    Long Grass and Weeds

    Nov 19, 2025 · 4155 YONGE ST
  • By-law investigation25 232781 PRS 00 IRClosed

    Property Standards

    Sep 30, 2025 · 4155 YONGE ST
  • Zoning review17 245489 POZClosed
    Jan 9, 2022 · 4155 YONGE ST
  • Development application17 245489 NNY 25 OZClosed

    Official Plan Amendment and Zoning By Law amendment to construct a 14 storey residential building on the western portion of the subject site. The proposed building would be constructed over the existing TTC subway tunnel andbe setback 1.0 metre from the toe-of-slope of valley feature. The proposed building includes a total of 64 units and a total gross floor area of 10,321.5 sq. m. The overall density proposed for the subject site is 3.20 Floor Space Index (FSI).

    Oct 10, 2017 · 4155 YONGE ST · City file
  • Zoning review16 264733 ZPRClosed
    Dec 15, 2016 · 4155 YONGE ST
  • Zoning review15 138133 PSPClosed
    Apr 10, 2015 · 4155 YONGE ST
  • Zoning review14 221129 LPRClosed
    Sep 12, 2014 · 4155 YONGE ST
  • Development application12 227529 NNY 25 SAClosed

    Application for a twelve-storey residential building with retail at grade. Parking would be provided in an underground garage. This development is also to an application for amendments to the Official Plan and ZoningBy-law (file number 11 133752 NNY 25 OZ) which the applicants have appealed to the Ontario Municipal Board for Council's lack of decision.

    Aug 10, 2012 · 4155 YONGE ST
  • Zoning review11 154230 POZClosed
    Mar 25, 2011 · 4155 YONGE ST
  • Development application11 133752 NNY 25 OZClosed

    12 storey mixed use building containing 172 residential dwelling units, ground floor retail and five levels of underground parking.

    Feb 25, 2011 · 4155 YONGE ST
  • Zoning review07 235440 PRZClosed
    Jun 21, 2007 · 4155 YONGE ST
  • Zoning review04 114160 PSPClosed
    Mar 8, 2004 · 4155 YONGE ST
  • Zoning review02 164110 PSPClosed
    Aug 15, 2002 · 4155 YONGE ST

Lot facts

Area
2,984 m²
Frontage
64.8 mestimated, irregular lot
Depth
138.9 mestimated, irregular lot
Street
Yonge St
Corner lot
Yes, also on William Carson Cres138.9 m along it
Public lane
None
Max height
—
Max lot coverage
—
  • Site and Area Specific Policy 802. The Official Plan has a policy for this site or area that varies the general rules. Read it before relying on zoning alone. Source
  • Major Transit Station Area: York Mills. The lot is inside the York Mills Major Transit Station Area approved by the Province (Site and Area Specific Policy 639). Source
  • Zone ON (Open Space Natural). Chapter 90, section 90.20 of the by-law. Source

Around this lot

Minor variances approved
100%3 of 3 decisions
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
0
Development applications
2

Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 3 variance decisions: no more than at most Toronto houses (median 19).

Latest activity nearby

  • Building permit

    Revision 01: (Permit Revision for 26 177558 PLB 00 PS) see attached revised list. Plumbing - Proposal for interior alterations to existing office space - UNIT 502, "Bluecat Networks Inc"

    4100 YONGE ST · Oct 26, 2026 · 216 m away
  • Zoning review

    Closed

    4141 YONGE ST · Oct 23, 2026 · 114 m away
  • Zoning review

    Notice Sent

    24 YORK RIDGE RD · Sep 22, 2026 · 295 m away
  • Building permit

    Proposed localized concrete repairs on parking garage roof deck

    4100-4120 YONGE ST · Sep 9, 2026 · 195 m away
  • Building permitnew building, new house

    Revision No, 4: two new roof skylights on Level 3Revision 03 - Change to building height. -------------------------------------------------------------------------Revision 02 - Change some dimensions and locations. Drawings attached. -------------------------------------------------------------------------Revision 01 - Change to concrete wall via form to ICF Concrete Walls. -------------------------------------------------------------------------Proposal to construct a new detached SFD with a three door integral garage, two front decks, and a finished basement with an elevator.

    23 YORK RIDGE RD · Aug 28, 2026 · 261 m away
  • Building permit

    Proposed remove five offices to create open space. Create an opening between suite 618 and 619.

    4211 YONGE ST · Aug 11, 2026 · 98 m away
  • Zoning review

    Closed

    23 YORK RIDGE RD · Jul 29, 2026 · 261 m away
  • Building permit

    1 ground sign**4211 YONGE ST**

    4211 YONGE ST · Jun 18, 2026 · 98 m away
  • Building permit

    1 ground sign**4211 YONGE ST**

    4211 YONGE ST · Jun 3, 2026 · 98 m away
  • Building permit

    INTERIOR ALTERATIONS TO WASHROOM. NEW SHOWER, LAVATORY AND WATER CLOSET TO REPLACE EXISTING FIXTURES

    18 WILLIAM CARSON CRES · May 27, 2026 · 220 m away

Neighbourhood: St.Andrew-Windfields

About the area around the lot, not the lot itself.

Nearest station
York Mills Station5 min walk
Nearest TTC stop
Yonge St at William Carson Cres1 min walk
Nearest cycling route
York Mills Park TrlMulti-Use Trail - Connector, 7 min walk
Nearest traffic count
24,176 vehicles in 8 hYonge St / William Carson Cres, 100 m away, Nov 23, 2023
Serious collisions within 500 m
12021–2026, killed or seriously injured: 0 fatal, 1 with pedestrians, 0 with cyclists
Parks
York Mills Valley Park7 min walk
York Mills Park7 min walk
Jolly Miller Park8 min walk

Schools within 1 km

  • LORETTO ABBEY CATHOLIC SECONDARY SCHOOL English Separate 13 min walk
  • ST EDWARD CATHOLIC ELEMENTARY SCHOOL English Separate 14 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureSt.Andrew-WindfieldsMedian neighbourhood
Median household income (2020)$118,000$84,500
Households that own their home64%54%
Population (2021)16,96016,813
Homes built in 1960 or before17%29%
Homes needing major repairs5%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleSt.Andrew-WindfieldsCity median
Assault614.8636.3
Robbery106.969.5
Shootings5.310.5
Auto theft203.2192.6
Theft over $5,00042.846.1
Break and enter384.9172.8
Theft from vehicles219.2188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
  • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.