HousePrecheckCheck an address

414 Jarvis StToronto · zoning, lot size and permit records

Residential · R (d1.0) (x963)17.4 × 40.4 m701 m²on Jarvis St

Not a single house

A condominium parcel

The City's property boundaries show this parcel as a condominium: the homes on it are units of a condominium corporation, which owns the land and common elements. Build options for a house do not apply; the corporation's status certificate is the document to read before an offer.

Looking at a house nearby? What this means for you

  • A condominium on 0.1 haIts owners share the land and decide together on changes; expect more cars and visitors than a house.
  • Permits or applications open on this parcelRecent records on this lot: 25 253529 (Proposed exterior facade repair, 2025). Larger work can mean noise and trucks next door; read what each one is for.
  • 11 development applications open within 300 m, up to 63 storeysNew buildings may go up around here in the next years. More change nearby than at 99% of Toronto houses.
  • City upkeep score: 87 out of 100RentSafeTO rates common areas, building systems and records. A low score can show from the street.
  • Major Transit Station Area: WellesleyThe City plans more homes around the station: good for transit, and more building over time.

Want to check this condo before you buy?

We are building checks for condominiums. Leave your email and we will tell you when it is ready.

N10 m
17.4 m frontage40.4 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • 14 by-law investigations closed in the last two years

    Good to know

    Closed files (Adequate Heat, Notice Issued Adequate Heat, Order Issued Property Standards, Property Standards, Zoning): 26 246540 PRS 00 IR (Property Standards, 2026); 26 129360 PRS 00 IV (Order Issued Property Standards: The dwelling does not have a heating system capable of..., 2026); 26 127456 PRS 00 IR (Property Standards, 2026); and 11 more.

    What it means. Someone raised an issue here and the City closed the file. Ask the seller what it was about.

    City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations
  • Work or applications in progress

    Good to know

    Recent records on this lot: 25 253529 (Proposed exterior facade repair, 2025).

    What it means. The owner has planned or started work. Ask what it covers, whether it will be finished before closing, and who pays for what is left.

    How to confirm. Application details and decisions are in the City's Application Information Centre. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards); City of Toronto, Development Applications
  • 11 development applications open within 300 m

    Good to know

    11 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 63 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications
  • 1 short-term rental registrations here

    Good to know

    1 active short-term rental registration at this address (Apartment).

    What it means. Short-term rentals are allowed only in the operator's own principal residence, so a buyer cannot count on the same rental income. In a condo, check the building's rules too.

    How to confirm. The City's short-term rental page explains registration and the principal residence rule. Details

    City of Toronto, Short-term Rental Registrations
  • Rental building evaluation: 87 out of 100

    Good to know

    The City's RentSafeTO program evaluated this rental building in 2025 (4 storeys, 35 units, built 1960).

    What it means. The score covers common areas, building systems and records. Read the evaluation details for the items that scored low.

    How to confirm. The City's RentSafeTO page has the evaluation results and any open orders for the building. Details

    City of Toronto, RentSafeTO Apartment Building Evaluations

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

16 records on file: more than at 100% of Toronto houses (median 0).

  • By-law investigation26 246540 PRS 00 IRClosed

    Property Standards

    Sep 29, 2026 · 414 JARVIS ST
  • By-law investigation26 129360 PRS 00 IVClosed

    Order Issued Property Standards: The dwelling does not have a heating system capable of maintaining a room temperature of twenty-one degrees Celsius(21?C).; The plumbing system is not kept in good working order, specifically, hot water boiler is non-functional and unable to provide hot water.

    Mar 10, 2026 · 414 JARVIS ST
  • By-law investigation26 127456 PRS 00 IRClosed

    Property Standards

    Mar 10, 2026 · 414 JARVIS ST
  • Building permit25 253529Permit Issued

    Proposed exterior facade repair.

    Nov 18, 2025 · 414 JARVIS ST
  • By-law investigation25 243727 HEA 00 IRClosed

    Adequate Heat

    Oct 22, 2025 · 414 JARVIS ST
  • By-law investigation25 238933 ZON 00 IRClosed

    Zoning

    Oct 12, 2025 · 414 JARVIS ST
  • By-law investigation25 198483 PRS 00 IRClosed

    Property Standards

    Jul 22, 2025 · 414 JARVIS ST
  • By-law investigation25 183089 PRS 00 IVClosed

    Order Issued Property Standards: Height of the guard for the exit stairs are less than 1,070 millimetres around landings. Namely, the guard height on the Fire Escapes.; Height of the guard for the exit stairs are less than 920 millimetres measured vertically to the top of the guard from a line drawn through the outside edges of; The fire escape and/or the supporting structural member(s) is not maintained in a safe condition.

    Jun 24, 2025 · 414 JARVIS ST
Show 8 older records
  • By-law investigation25 183078 PRS 00 IRClosed

    Property Standards

    Jun 24, 2025 · 414 JARVIS ST
  • By-law investigation25 132369 PRS 00 IVClosed

    Order Issued Property Standards: The exterior walls and their components are not being maintained in good repair.Namely, the walls along the ground floor specifically at the front corner by the; The (stairs, treads, risers, guards, handrails, and/or other appurtenant attachments) and/or their supporting structural members are not being maintained free f

    Mar 20, 2025 · 414 JARVIS ST
  • By-law investigation25 132133 PRS 00 IRClosed

    Property Standards

    Mar 20, 2025 · 414 JARVIS ST
  • By-law investigation25 113381 HEA 00 IVClosed

    Notice Issued Adequate Heat: The heat supplied to the dwelling unit is below twenty-one (21) degrees Celsius.Namely, unit is not 21 degrees without space heater.

    Feb 4, 2025 · 414 JARVIS ST
  • By-law investigation25 112553 HEA 00 IRClosed

    Adequate Heat

    Feb 4, 2025 · 414 JARVIS ST
  • By-law investigation25 111930 HEA 00 IVClosed

    Notice Issued Adequate Heat: The heat supplied to the dwelling unit is below twenty-one (21) degrees Celsius.Namely, there is no heat in the unit.

    Jan 22, 2025 · 414 JARVIS ST
  • By-law investigation25 107828 HEA 00 IRClosed

    Adequate Heat

    Jan 22, 2025 · 414 JARVIS ST
  • Zoning review03 101225 PLOClosed
    Jan 10, 2003 · 414 JARVIS ST

Check before you build

  • Site-specific exception 900.2.10(963)

    Needs a closer look

    2 site-specific rules and 1 older by-law that still prevails apply to this lot. They can override the standard rules on this page.

    Zoning By-law 569-2013, Chapter 900
Exception 900.2.10(963)Applies

These parts of the exception apply to this lot's address.

  1. Rule A

    The lands must comply with exception 900.2.10(4)

  2. Rule B

    The minimum front yard setback is 6.0 metres.

  3. Older by-law A

    Section 12(1) 434 of former City of Toronto By-law 438-86.

By-law 569-2013, Chapter 900

Lot facts

Area
701 m²
Frontage
17.4 m
Depth
40.4 m
Street
Jarvis St
Corner lot
No
Public lane
None
Max height
13 m
Max lot coverage
—
  • Major Transit Station Area: Wellesley. The lot is inside the Wellesley Major Transit Station Area approved by the Province (Site and Area Specific Policy 602). Source
  • Downtown Plan Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
  • Downtown building setback overlay. Towers over 36 m here need extra setbacks above 24 m and 25 m between towers. Houses and other low buildings are not affected. Source
  • Zone R (d1.0) (x963) (Residential). Chapter 10, section 10.10 of the by-law. Source
  • 2 City trees in front of this lot. The City's street tree inventory lists 2 trees at this address: maple, norway (26 cm), maple, norway (23 cm). Diameter is the trunk at breast height. Source

Around this lot

Minor variances approved
100%11 of 11 decisions
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
2
Development applications
21

Within 300 m, last 10 years. 2 suite and multiplex permits: no more than at most Toronto houses (median 3). 11 variance decisions: no more than at most Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To alter the existing three-storey townhouse dwelling by constructing interior alterations to the existing open-to-above area between the basement and ground floor level of the dwelling by enclosing the floor (increasing the area of habitable space).

    97 GRANBY ST · Oct 15, 2025 · 394 m away
  • Minor varianceApproved

    To alter the existing two-and-one-half-storey semi-detached rooming house by constructing a rear four-storey addition. A total of 26 rooms for living accommodation will be provided.

    344 JARVIS ST · Sep 21, 2022 · 213 m away
  • Minor varianceApproved

    To convert the existing single family, two-storey building into a two-storey duplex by constructing a front basement walkout and porch.

    64 MCGILL ST · Jan 26, 2022 · 490 m away
  • Minor varianceRefused

    To construct a third storey addition (enclosed staircase) to provide access to the proposed rooftop deck for Unit 2.

    50 BLEECKER ST · Jan 12, 2022 · 441 m away
  • Minor varianceApproved

    To convert a semi-enclosed storage area on the ground floor of the existing apartment building to a commercial kitchen.

    50 EARL ST · Sep 15, 2021 · 492 m away

Latest activity nearby

  • Zoning review

    Closed

    140 CARLTON ST · Oct 27, 2026 · 297 m away
  • Building permit

    Layout changes + addition of a bathroom in units1A, 12, 24 & 25.

    134 CARLTON ST · Oct 23, 2026 · 289 m away
  • Building permit

    Replacement of the existing make up air unit, DHW storage tank and boilers including ductwork, piping, pumps, etc. in the penthouse mechanical room.

    330 JARVIS ST · Oct 13, 2026 · 257 m away
  • Minor varianceApproved

    To permit the existing entertainment place of assembly (nightclub) use within the two-storey commercial building.

    508 CHURCH ST · Sep 9, 2026 · 207 m away
  • Zoning review

    Closed

    473 CHURCH ST · Sep 2, 2026 · 163 m away
  • Building permit

    Proposed converting the existing parking spot (parking spot # A69) to a storage unit.

    130 CARLTON ST · Aug 27, 2026 · 261 m away
  • Building permitsecondary suite

    Basement second unit

    49 HOMEWOOD AVE · Aug 14, 2026 · 272 m away
  • Building permit

    Proposed interior alterations to convert existing retail store to dental office.

    411 CHURCH ST · Aug 12, 2026 · 269 m away
  • Zoning review

    Closed

    445 CHURCH ST · Jun 2, 2026 · 170 m away
  • Building permit

    Proposal to replace existing stairwell railings.

    100 WELLESLEY ST E · Jun 1, 2026 · 215 m away

Neighbourhood: Church-Wellesley

About the area around the lot, not the lot itself.

Nearest station
Wellesley Station8 min walk
Nearest TTC stop
Wellesley St East at Jarvis St3 min walk
Nearest cycling route
Maitland PlBike Lane - Contraflow, 1 min walk
Nearest traffic count
8,866 vehicles in 8 hJarvis St / Maitland Pl / Maitland St, 50 m away, Dec 10, 2022
Serious collisions within 500 m
102021–2026, killed or seriously injured: 0 fatal, 7 with pedestrians, 1 with cyclists
Parks
Montague Parkette3 min walk
Barbara Hall Park4 min walk
Allan Gardens5 min walk

Schools within 1 km

  • NATIONAL BALLET SCHOOL - THE SHOE ROOM Private 1 min walk
  • NATIONAL BALLET SCHOOL - BETTY OLIPHANT THEATRE Private 1 min walk
  • NATIONAL BALLET SCHOOL - MAISON STAINES HOUSE & SALLE CURRIE HALL Private 2 min walk
  • NATIONAL BALLET SCHOOL Private 2 min walk
  • JARVIS COLLEGIATE INSTITUTE English Public 2 min walk
  • CHURCH ST JR & NATIVE LEARNING CTR English Public 3 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureChurch-WellesleyMedian neighbourhood
Median household income (2020)$60,400$84,500
Households that own their home24%54%
Population (2021)22,32016,813
Homes built in 1960 or before15%29%
Homes needing major repairs5%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleChurch-WellesleyCity median
Assault1264.6636.3
Robbery93.269.5
Homicide3.35.3
Auto theft46.6192.6
Theft over $5,000106.546.1
Break and enter146.4172.8
Theft from vehicles206.3188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 28, 2026, published Nov 28, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 28, 2026, published Nov 27, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 28, 2026, published Nov 27, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 28, 2026, published Nov 27, 2026
  • Multi-tenant house licences: loaded Nov 28, 2026, published Nov 27, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 28, 2026, published Nov 27, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.