HousePrecheckCheck an address

41 Salome DrToronto · zoning, lot size and permit records

Employment · E 0.7 (x164)≈ 267.0 × 139.6 m22,159 m²on Salome Dr

Not a home

An employment area

The zoning by-law sets this parcel aside for employment: offices, workshops and industry. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Offices, workshops or industryTrucks and noise in working hours, quiet at night; check what is made or stored there.
  • 2 development applications open within 300 m, up to 35 storeysNew buildings may go up around here in the next years. More change nearby than at 68% of Toronto houses.
N50 m
≈ 267.0 m frontage≈ 139.6 m deepirregular lot, estimated

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • 2 development applications open within 300 m

    Good to know

    2 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 35 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

No permits, applications or Committee of Adjustment files on this lot in the City's open records.

Check before you build

  • Site-specific exception 900.20.10(164)

    Needs a closer look

    5 site-specific rules and 5 older by-laws that still prevail apply to this lot. They can override the standard rules on this page.

    Zoning By-law 569-2013, Chapter 900
Exception 900.20.10(164)Applies

These parts of the exception apply to this lot's address.

  1. Rule A

    In addition to the uses permitted in Article 60.20.20, the storage of paraffin wax is permitted

  2. Rule B

    The minimum building setback from the front lot line is 12 metres

  3. Rule C

    The minimum building setback from the westerly side lot line is 22 metres

  4. Rule D

    The minimum building setback form the easterly side lot line is 35 metres

  5. Rule E

    The building setback from the rear lot line must be 35 metres. Prevailing By-laws and Prevailing Sections: (None Apply)

  6. Older by-law A

    In addition to the uses permitted in Article 60.20.20, the storage of paraffin wax is permitted

  7. Older by-law B

    The minimum building setback from the front lot line is 12 metres

  8. Older by-law C

    The minimum building setback from the westerly side lot line is 22 metres

  9. Older by-law D

    The minimum building setback form the easterly side lot line is 35 metres

  10. Older by-law E

    The building setback from the rear lot line must be 35 metres. Prevailing By-laws and Prevailing Sections: (None Apply)

By-law 569-2013, Chapter 900

Lot facts

Area
22,159 m²
Frontage
267 mestimated, irregular lot
Depth
139.6 mestimated, irregular lot
Street
Salome Dr
Corner lot
No
Public lane
None
Max height
—
Max lot coverage
—
  • Agincourt Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
  • Zone E 0.7 (x164) (Employment Industrial). Chapter 60, section 60.20 of the by-law. Source

Around this lot

Minor variances approved
100%6 of 6 decisions
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
2
Development applications
2

Within 300 m, last 10 years. 2 suite and multiplex permits: no more than at most Toronto houses (median 3). 6 variance decisions: no more than at most Toronto houses (median 19).

Latest activity nearby

  • Building permit

    supply and install backwater valve

    39 GARDEN PARK AVE · Nov 20, 2026 · 153 m away
  • Building permitdemolition

    Proposed demolish existing dwelling and new construction of 2 storey double garage SFD detached

    23 GARDEN PARK AVE · Jul 13, 2026 · 204 m away
  • Building permit

    Drain - Proposed demolish existing dwelling and new construction of 2 storey double garage SFD detached

    23 GARDEN PARK AVE · Jul 13, 2026 · 204 m away
  • Building permitsecondary suite

    Proposal to replace existing sanitary line to city connection.

    32 GARDEN PARK AVE · Jul 8, 2026 · 94 m away
  • Building permit

    Licence Issued

    18 MIDCROFT DR · Jun 10, 2026 · 294 m away
  • Minor varianceApproved

    To construct a new two-storey detached dwelling with a covered front porch and rear covered patio. The existing building on the property will be demolished.

    23 GARDEN PARK AVE · Jun 3, 2026 · 204 m away
  • Building permitsecondary suite

    Proposal for interior alterations and convert single family dwelling to a two unit dwelling.

    18 MIDCROFT DR · Apr 15, 2026 · 294 m away
  • Zoning review

    Cancelled

    4245 SHEPPARD AVE E · Apr 10, 2026 · 292 m away
  • Consent (lot split)Approved

    To obtain consent to sever the property into two residential lots. The existing two-storey detached dwelling would remain and a new three-storey detached dwelling (sixplex) will be constructed. The Committee of Adjustment previously approved the severance of the land into 2 lots in 2023 under Decision B0026/22SC. However, the provisional consent of this application lapsed because the conditions of approval were not satisfied within the statutory timeline.

    33 MURRAY AVE · Mar 11, 2026 · 283 m away
  • Minor varianceApproved

    To construct a new three-storey detached dwelling (sixplex) with front and rear balconies on the first and second floors. Cross-reference Consent Applications B0040/25SC.

    33 MURRAY AVE · Mar 11, 2026 · 283 m away

Neighbourhood: Agincourt South-Malvern West

About the area around the lot, not the lot itself.

Nearest station
Agincourt GO Station16 min walk
Nearest TTC stop
Sheppard Ave East at Glen Watford Dr East Side3 min walk
Nearest cycling route
East Highland Creek TrlMulti-Use Trail, 11 min walk
Nearest traffic count
17,807 vehicles in 14 hSheppard Ave E / Glen Watford Dr, 250 m away, Oct 19, 2025
Serious collisions within 500 m
02021–2026, killed or seriously injured
Parks
Garden Avenue Parkette1 min walk
Agincourt Park3 min walk
McDairmid Woods Park10 min walk

Schools within 1 km

  • UNIQUE CHINESE SCHOOL - MIDLAND CAMPUS Private 3 min walk
  • BLUE GENE EDUCATION SCHOOL Private 4 min walk
  • AGINCOURT MONTESSORI SCHOOL Private 8 min walk
  • SIR ALEXANDER MACKENZIE SR PUBLIC SCHOOL English Public 8 min walk
  • ST BARTHOLOMEW CATHOLIC ELEMENTARY SCHOOL English Separate 9 min walk
  • C D FARQUHARSON JR PUBLIC SCHOOL English Public 9 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureAgincourt South-Malvern WestMedian neighbourhood
Median household income (2020)$79,500$84,500
Households that own their home70%54%
Population (2021)24,17016,813
Homes built in 1960 or before10%29%
Homes needing major repairs6%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleAgincourt South-Malvern WestCity median
Assault467636.3
Robbery94.869.5
Homicide75.3
Shootings21.110.5
Auto theft273.9192.6
Theft over $5,00038.646.1
Break and enter259.9172.8
Theft from vehicles242.3188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 29, 2026, published Nov 27, 2026
  • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 29, 2026, published Nov 27, 2026
  • City-owned land: loaded Nov 29, 2026, published Nov 23, 2026
  • Committee of Adjustment open applications: loaded Nov 29, 2026, published Nov 28, 2026
  • Committee of Adjustment decisions: loaded Nov 29, 2026, published Nov 28, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 29, 2026, published Nov 28, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 29, 2026, published Nov 29, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 29, 2026, published Nov 24, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Nov 29, 2026, published Nov 23, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 29, 2026, published Nov 28, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 29, 2026, published Nov 28, 2026
  • Cleared building permits: loaded Nov 29, 2026, published Nov 28, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 29, 2026, published Nov 28, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 29, 2026, published Nov 28, 2026
  • Multi-tenant house licences: loaded Nov 29, 2026, published Nov 28, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Nov 29, 2026, published Nov 23, 2026
  • Short-term rental registrations: loaded Nov 29, 2026, published Nov 28, 2026
  • Traffic counts at intersections: loaded Nov 29, 2026, published Nov 28, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Nov 29, 2026, published Nov 23, 2026
  • Lot coverage overlay: loaded Nov 29, 2026, published Nov 23, 2026
  • Height overlay: loaded Nov 29, 2026, published Nov 23, 2026
  • Parking zone overlay: loaded Nov 29, 2026, published Nov 23, 2026
  • Policy area overlay: loaded Nov 29, 2026, published Nov 23, 2026
  • Priority retail streets: loaded Nov 29, 2026, published Nov 23, 2026
  • Rooming house overlay: loaded Nov 29, 2026, published Nov 23, 2026
  • Zoning setbacks: loaded Nov 29, 2026, published Nov 23, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.