Everything here comes from public records: City of Toronto open data, TRCA and Statistics Canada, 15 sets in all. Each item leads to the record it comes from. Our sources
This house at a glance
Each score from 0 to 10: 0 needs attention, 10 all clear. Build potential is how much more you could add.
About 407 Huron St
407 Huron St is on a 13.7 m by 44.9 m lot on Huron St in University. This lot is not covered by Toronto's city-wide zoning by-law 569-2013, so a by-law of the former city or borough most likely still applies. Toronto Building can confirm which one. The property is designated under Part IV of the Ontario Heritage Act, so changes to its heritage features need a City heritage permit.
The City has 17 records on this lot since 2004. That is more than at 99% of Toronto houses. In 2021, a building permit was filed: "To erect and display one illuminated ground sign displaying static copy. erected at the west frontage of the property. the sign contains two sign faces…". Status: closed. In 2020, a building permit was filed: "Revision 2 - revised interior layoutproposal for interior alterations for medical office". Status: closed. In 2020, a building permit was filed: "Proposal for an interior fit-out at mount sinai hospital - sinai health (kwong centre for mental health and wellness) for a "teaching kitchen" designed for…". Status: closed. Nothing on file is open right now.
Within 300 m, 8 development applications are open (the tallest up to 37 storeys). Within 300 m, the Committee of Adjustment decided 11 minor variance applications in the last 10 years and approved 82%. St George station is a 4-minute walk.
Summary
What the City's records show on this house
- Heritage property: designated (Part IV)Moderate
- Zoning not in By-law 569-2013Moderate
- 8 development applications open within 300 mLowFree check
- 1 Committee of Adjustment file on this lotLowFree check
Left unchecked, any of these can mean unexpected costs, trouble after closing, or plans you can't carry out. Found before you offer, they give you room to negotiate. The full report explains what each one means for this house and what to do next.
15 sets of public records, already checked for you. Searching each one yourself and working out what it means for you takes time. We have done that work: what matters about this house and lot, in plain English, in a few minutes.
What to find out first
2 things to check before you offer.
What to find out before an offer, the steps to take, what each costs and how long it takesUnlock
Open City files
How much in the City's records needs answers before an offer
- No open orders or by-law investigations
- No permits left open for years
- No work or applications in progress
What this part means for this house, in plain EnglishUnlock
1 Committee of Adjustment file on this lot
LowFor later, once you own itSee the next door check for this house
What the record shows, what it means for you and what to doUnlock
What this means: Committee of Adjustment
City files on this lot
17 records on file, more than at 99% of Toronto houses (median 0 records).
| Date | Record | As the City filed it | In plain words | Status |
|---|---|---|---|---|
| 2021-02-22 | Building permit20 164408 | To erect and display one illuminated ground sign displaying static copy. Erected at the west frontage of the property. The sign contains two sign faces. ****KWONG CENTRE FOR HEALTH & WELLNESS**** | Closed | |
| 2020-12-18 | Building permit20 164271 | REVISION 2 - revised interior layoutProposal for interior alterations for medical office. | Closed | |
| 2020-10-28 | Zoning review20 212128 ZSV | No description on file | Closed | |
| 2020-09-18 | Building permit20 189274 | Proposal for an interior fit-out at Mount Sinai Hospital - Sinai Health (Kwong Centre for Mental Health and Wellness) for a "Teaching Kitchen" designed for small cooking / food preparation used for patient clinical and assessment purposes. | Closed | |
| 2020-01-20 | Building permit19 260128 | Proposal to install 3 electromagnetic locks in existing mixed commercial building. | Closed | |
| 2019-09-10 | Building permit14 214947 | REVISION - revised interior layout and delete walls in future tenant spaceProposal to demolish 2 sty rear portion, construct a 3 sty rear addition, and interior alterations to existing 3 sty dormitory and convert to medical offices. Kwong Centre for Mental Health and Wellness. | Closed | |
| 2019-06-17 | Minor varianceA0634/19TEY | To permit an office use that is not associated with or accessory to the community health centre or educational clinic permitted by Site-specific By-law 1246-2016. | Withdrawn | |
| 2019-05-27 | Zoning review19 159906 ZPR | No description on file | Closed | |
| 2018-03-29 | Building permit14 231939 | To demolish the existing two-rear portion which includes dormitory of the Kwong Centre for Mental Health and Wellness | Closed | |
| 2017-11-16 | Building permit17 262316 | Proposal to demolish the existing 1 storey parking structure at the rear of the existing property. | Closed | |
| 2016-07-12 | Zoning review10 318655 PRZ | No description on file | Closed | |
| 2014-09-09 | Zoning review14 102677 PSP | No description on file | Closed | |
| 2011-02-24 | Development application11 132665 STE 20 OZ | Official plan amendment to complement proposal to construct a 3 story rear addition to the existing 2 ½ storey building for a community medical, educational, and clinic centre. | Closed | |
| 2010-12-06 | Development application10 309446 STE 20 SA | Proposal to construct a three-storey rear addition for a community medical, educational and clinic centre. This site plan application is to be considered in conjunction with Zoning Amendment File No.10-309448 STE 20 OZ adopted by City Council on October 24, 2011. | Closed | |
| 2010-12-06 | Development application10 309448 STE 20 OZ | Proposal to construct a 3 story rear addition to the existing building for a mental health and wellness centre, geared to seniors. | Closed | |
| 2009-10-08 | Building permit09 177242 | Proposal to demolish three storey single family detached dwelling. No excavation. | Cancelled | |
| 2004-03-15 | Zoning review04 116192 ZPU | No description on file | Closed |
Restrictions
How much heritage, nature and site-specific rules limit changes to the house
- Heritage property: designated (Part IV)
- Zoning not in By-law 569-2013
What this part means for this house, in plain EnglishUnlock
Heritage property: designated (Part IV)
ModerateCheck before you offerWhat the record shows, what it means for you and what to doUnlock
Zoning not in By-law 569-2013
ModerateCheck before you offerWhat the record shows, what it means for you and what to doUnlock
What this means: Toronto Heritage RegisterWhat this means: Toronto zoning by address
Flood and erosion rules
How much of the lot lies in the areas TRCA regulates for flooding and erosion
- Outside the areas TRCA regulates
From TRCA's regulated areas only. Basement flooding, sewer back-up and the TRCA flood plain are not in this score yet; ask the seller and your insurer about water in the basement.
What this part means for this house, in plain EnglishUnlock
Build potential
How much more the rules allow on this lot, beyond what is on record
What this part means for this house, in plain EnglishUnlock
The lot and what the rules allow
- Zone
- —
- Height limit
- —
- Corner lot
- No
- Public lane
- None
- House footprint
- 212 m²
- Back yard
- 14.6 m
- Buildings on the lot
- 1
House and yards from the City's 3D Massing; a survey gives exact figures.
What you can build
Why, measured on this lot, and the most you could buildUnlock
Building nearby
How much neighbours are building and applying to change within 300 m
- 8 development applications open within 300 m, up to 37 storeys
- 10 suite and multiplex permits within 300 m in 10 years
- 11 minor variance decisions within 300 m, 82% approved
What this part means for this house, in plain EnglishUnlock
8 development applications open within 300 m
LowCheck if it appliesSee the next door check for this house
What the record shows, what it means for you and what to doUnlock
What the City allowed next door
Within 500 m, last 10 years: a guide if you plan to build or apply for something similar.
What neighbours have built and changed around you, and how the City decidedUnlock
Area safety
Police-reported crime in the neighbourhood against the Toronto median
- Lower than the Toronto median in 1 of 7 categories
- Break and enter: 4.2 times the Toronto median
- Assault: 2.7 times the Toronto median
- Theft over $5,000: 2.6 times the Toronto median
- Homicide: 2.3 times the Toronto median
- Robbery: 1.9 times the Toronto median
- Theft from vehicles: 1.9 times the Toronto median
Neighbourhood rates per 100,000 people from the Toronto Police Service, not this street.
What this part means for this house, in plain EnglishUnlock
University neighbourhood
About the area, not this house.
2021 Census, against the median Toronto neighbourhood
Getting around and schools
- St George StationNearest station4 min walk
- St George Station - Northbound PlatformNearest TTC stop4 min walk
- Bloor St WNearest cycling route1 min walk
- School of Continuing Studies - U of T, Bldg 103School1 min walk
- University of Toronto SchoolsSchool2 min walk
- Munk School of Global Affairs at the Observatory - U of T, Bldg 89School3 min walk
- Howlett Academy SchoolSchool4 min walk
Police-reported crime, 2025, per 100,000 people
- Assaultcity median 636.31740.5
- Robberycity median 69.5133.9
- Homicidecity median 5.312.2
- Auto theftcity median 192.6182.6
- Theft over $5,000city median 46.1121.7
- Break and entercity median 172.8730.3
- Theft from vehiclescity median 188.1353
Ready emails
Copy and send as they are.
1 question for the seller and your lawyer, written outUnlock
What we checked, and what the City's records don't cover
We checked 48 sets of City of Toronto, TRCA and Statistics Canada open data for this address, last updated Nov 27, 2026. Our records don't cover flooding history, ownership and mortgages, or the condition of the house: ask the seller and your insurer about water in the basement, your lawyer about title, and book a home inspection.
See every source and when we loaded it · Pre-offer checklist