HousePrecheckCheck an address

4060 Finch Ave EToronto · zoning, lot size and permit records

Employment · E 0.5≈ 8.6 × 202.1 m63 m²on Milliken Blvd

Not a home

An employment area

The zoning by-law sets this parcel aside for employment: offices, workshops and industry. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Offices, workshops or industryTrucks and noise in working hours, quiet at night; check what is made or stored there.
  • Permits or applications open on this parcelRecent records on this lot: 23 189504 (NEW DESCOPED: Stormwater Pumping Station on S/E quadrant (Previously part of -now desco..., 2023); 22 150557 ESC 22 SA (Site Plan Approval (SPA) Application for the Finch-Kennedy SmartTrack Station, 2022). Larger work can mean noise and trucks next door; read what each one is for.
  • 2 development applications open within 300 mNew buildings may go up around here in the next years. More change nearby than at 68% of Toronto houses.
N50 m
≈ 8.6 m frontage≈ 202.1 m deepirregular lot, estimated

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • Building permit open since 2023

    Needs a closer look

    Still open in the City's records: 23 233622 (Alternative Solution for the following outlines the proposed alternative solution for t..., 2023, status Deficiency Notice Issued).

    What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.

    How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)
  • Work or applications in progress

    Good to know

    Recent records on this lot: 23 189504 (NEW DESCOPED: Stormwater Pumping Station on S/E quadrant (Previously part of -now desco..., 2023); 22 150557 ESC 22 SA (Site Plan Approval (SPA) Application for the Finch-Kennedy SmartTrack Station, 2022).

    What it means. The owner has planned or started work. Ask what it covers, whether it will be finished before closing, and who pays for what is left.

    How to confirm. Application details and decisions are in the City's Application Information Centre. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards); City of Toronto, Development Applications
  • 2 development applications open within 300 m

    Good to know

    2 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

4 records on file: more than at 88% of Toronto houses (median 0).

  • Building permit24 198155Approved

    The following outlines the proposed alternative solution for the applicable Building Code requirements, relative to fire protection and life safety, for the Finch-Kennedy SmartTrack Station of the GO Expansion program, located in Toronto, ON.Specifically, the purpose of this report is to exempt the interconnected floor spaces within the platform access portion of the Southeast, Southwest and Northwest Station Pavilion buildings from the requirement of Sentence 3.2.8.2.(6) to provide automatic sprinkler protection. It will be demonstrated that the level of life safety and fire protection provided for the Project will meet or exceed the intent of the applicable code requirements of the Ontario Building Code.The portion of the Platform Level (first storey) of the Southeast, Southwest and Northwest Station Pavilion buildings that will be superimposed above and open to the Street Level (basement level) of the buildings will be limited to stair and elevator access landings that are being considered as a contiguous volume to the Street Level of these buildings.For additional information, refer to the Interconnected Floor Space Alternative Solution Report prepared by LMDG Building Code Consultants Ltd., dated May 28, 2024.

    Aug 14, 2024 · 4060 FINCH AVE E
  • Building permit23 233622Deficiency Notice Issued

    Alternative Solution for the following outlines the proposed alternative solution for the applicable Building Code requirements, relative to fire protection and life safety, for the Finch-Kennedy SmartTrack Station of the GO Expansion program, located in Toronto, ON.Specifically, the purpose of this report is to address the application of the Ontario Building Code regarding the dead-end conditions exceeding 25 m at the ends of the passenger rail platforms. It will be demonstrated that the level of life safety and fire protection provided for the Project will meet or exceed the intent of the applicable code requirements of the Ontario Building Code.Occupants will be provided with two means of egress from the platforms level via the Station Pavilion buildings. In addition, the East Platform will be served by a pedestrian sidewalk/access and the West Platform will be provided with emergency egress to the service road serving the Northwest Station Pavilion building. However, dead-end conditions will occur on the ends of the platforms,with a common path of travel of up to approximately 228 m. As passengers are not able to evacuate off the ends of the platforms to track level, an alternative approach to evaluating the common path of travel on the GO Platform Level is proposed.

    Dec 7, 2023 · 4060 FINCH AVE E
  • Building permit23 189504Examiner's Notice Sentnew building

    NEW DESCOPED: Stormwater Pumping Station on S/E quadrant (Previously part of -now descoped- Finch and Kennedy Smarttrack Station).---One station pavilion and retaining walls along Finch Ave E between Miliken Blvd and Baylawn Dr for N/W quadrant, N/E quadrant, S/W quadrant and S/E quadrantFinch Kennedy Smart Track

    Aug 16, 2023 · 4060 FINCH AVE E
  • Development application22 150557 ESC 22 SAUnder Review

    Site Plan Approval (SPA) Application for the Finch-Kennedy SmartTrack Station.

    May 24, 2022 · 4060 FINCH AVE E · City file

Lot facts

Area
63 m²
Frontage
8.6 mestimated, irregular lot
Depth
202.1 mestimated, irregular lot
Street
Milliken Blvd
Corner lot
No
Public lane
None
Max height
—
Max lot coverage
—
  • Site and Area Specific Policy 853. The Official Plan has a policy for this site or area that varies the general rules. Read it before relying on zoning alone. Source
  • Zone E 0.5 (Employment Industrial). Chapter 60, section 60.20 of the by-law. Source

Around this lot

Minor variances approved
100%6 of 6 decisions
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
1
Development applications
2

Within 300 m, last 10 years. 1 suite and multiplex permits: no more than at most Toronto houses (median 3). 6 variance decisions: no more than at most Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To permit retail use in the existing food manufacturing facility.

    27 MILLIKEN BLVD · Feb 12, 2025 · 289 m away
  • Minor varianceApproved

    To permit a retail use in unit B10. Cross-reference previous Minor Variance Applications at this address A0168/22SC & A0099/24SC.

    23 MILLIKEN BLVD · Oct 16, 2024 · 217 m away
  • Minor varianceApproved

    To permit a retail use in the existing building.

    23 MILLIKEN BLVD · Jul 24, 2024 · 217 m away
  • Minor varianceApproved

    To permit retail sales uses to the public in connection with the existing warehouse.

    23 MILLIKEN BLVD · Aug 12, 2022 · 217 m away
  • Minor varianceRefused

    The owners are proposing to demolish a part of the building and undertake interior renovations for a proposal to use the building for a Place of Worship and Educational Facility (religious school).

    4140 FINCH AVE E · Oct 6, 2016 · 294 m away

Latest activity nearby

  • Building permit

    Interior alterations - Rexall store 0406

    4040 FINCH AVE E · Nov 24, 2026 · 33 m away
  • Building permit

    Proposal to construct a spray booth and paint mixing room.

    4032 FINCH AVE E · Nov 12, 2026 · 143 m away
  • Building permit

    Construction of a 20¿ (Length) x 11¿ (Width) x 10¿ (Height) single-storey, detached, pre-engineered steel-frame storage intended for private storage use. The structure will be situated on a reinforced concrete slab-on-grade foundation as per the attached engineered structural drawings

    2885 KENNEDY RD · Oct 29, 2026 · 272 m away
  • Building permit

    Site servicing alterations for the removal of approximately 25m of existing 375mm diameter concrete storm sewer and one maintenance hole, and installation of 24.8m of 450mm diameter PVC storm sewer and two new maintenance holes. Area of work 130m2.

    4120 FINCH AVE E · Oct 20, 2026 · 215 m away
  • Building permit

    HVAC - Proposal for interior alterations & install 2 washrooms.

    2885 KENNEDY RD · Sep 25, 2026 · 272 m away
  • Zoning review

    Notice Sent

    152 PETWORTH CRES · Aug 24, 2026 · 253 m away
  • Zoning review

    Closed

    23 MILLIKEN BLVD · Aug 20, 2026 · 217 m away
  • Building permit

    Relocation of existing private storm manhole 5m to the East. Size of manhole in it's new location and size of storm sewer connected to the manhole will remain the same as what's existing.

    4120 FINCH AVE E · Aug 4, 2026 · 215 m away
  • Zoning review

    Closed

    23 MILLIKEN BLVD · Jan 7, 2026 · 217 m away
  • Development application

    Official Plan Amendment application to facilitate the addition of the Subject Lands to Site and Area Specific Policy 853 (SASP 853), as created by OPA 653.

    4120 FINCH AVE E · Dec 31, 2025 · 198 m away · City file

Neighbourhood: Milliken

About the area around the lot, not the lot itself.

Nearest station
Agincourt GO Station35 min walk
Nearest TTC stop
Finch Ave East at Milliken Blvd1 min walk
Nearest cycling route
East Highland Creek TrlMulti-Use Trail, 7 min walk
Nearest traffic count
28,174 vehicles in 14 hFinch Ave E / Milliken Blvd, 90 m away, Jun 11, 2024
Serious collisions within 500 m
32021–2026, killed or seriously injured: 0 fatal, 3 with pedestrians, 0 with cyclists
Parks
Kennedy Parkette4 min walk
Knott Park8 min walk
Highland Heights Park12 min walk

Schools within 1 km

  • AMANAH ACADEMY NORTH AMERICA FOUNDATION SCHOOL Private 5 min walk
  • KENNEDY LINC English Public 6 min walk
  • MONSIGNOR FRASER COLLEGE - MIDLAND CAMPUS English Separate 10 min walk
  • MIDLAND ADULT EDUCATION CENTRE English Separate 11 min walk
  • LYNNWOOD HEIGHTS JR PUBLIC SCHOOL English Public 11 min walk
  • YORKLAND HIGH SCHOOL Private 11 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureMillikenMedian neighbourhood
Median household income (2020)$81,000$84,500
Households that own their home88%54%
Population (2021)23,98016,813
Homes built in 1960 or before2%29%
Homes needing major repairs4%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleMillikenCity median
Assault334.2636.3
Robbery197.569.5
Shootings1910.5
Auto theft607.7192.6
Theft over $5,000125.346.1
Break and enter254.5172.8
Theft from vehicles398.8188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
  • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.