HousePrecheckCheck an address

406 Huron StToronto · zoning, lot size and permit records

8.9 × 36.5 m324 m²on Huron Stcorner, also on Washington Avebacks onto Ln W Huron N Sussex Ave

Not a home

Land without a building

The City's 3D model of buildings shows nothing standing on this parcel: vacant land, a parking lot or a yard. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Empty land or parkingWhat gets built here matters most to the street: read the applications on it and around it below.
  • 6 development applications open within 300 m, up to 37 storeysNew buildings may go up around here in the next years. More change nearby than at 100% of Toronto houses.
N10 m
8.9 m frontage36.5 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • 6 development applications open within 300 m

    Good to know

    6 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 37 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

1 records on file: more than at 53% of Toronto houses (median 0).

  • Zoning review04 137038 ZPRClosed
    May 19, 2004 · 406 HURON ST

Check before you build

  • Zoning not in By-law 569-2013

    Needs a closer look

    This lot is not covered by the citywide zoning by-law's map. It is probably still governed by a former municipal by-law, which this tool does not read yet.

    Zoning By-law 569-2013

Lot facts

Area
324 m²
Frontage
8.9 m
Depth
36.5 m
Street
Huron St
Corner lot
Yes, also on Washington Ave36.5 m along it
Public lane
Ln W Huron N Sussex Ave, 17 m along it
Max height
—
Max lot coverage
—
  • 5 City trees in front of this lot. The City's street tree inventory lists 5 trees at this address: maple, silver (50 cm), mulberry, white (41 cm), maple, norway crimson king (41 cm). Diameter is the trunk at breast height. Source

Around this lot

Minor variances approved
89%8 of 9 decisions
Garden suite permits
0
Laneway suite permits
2
Multiplex permits
7
Development applications
23

Within 300 m, last 10 years. 9 suite and multiplex permits: more than at 72% of Toronto houses (median 3). 9 variance decisions: no more than at most Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a rear second storey addition with a balcony above the existing rear one-storey portion of the dwelling. Also, to permit the existing habitable space within the attic, which was converted without an authorized building permit.

    240 MAJOR ST · May 13, 2026 · 393 m away
  • Minor varianceApproved

    To convert the existing two-storey detached main dwelling into a mixed-use building through interior alterations to permit a restaurant (café) use within the ground floor of the building. Also, to construct a new two-storey detached ancillary building (containing one laneway suite with bedrooms within the basement below) in the rear yard, abutting the Public laneway. There will be a total of two residential dwelling units on this lot (one in the main dwelling and one in the laneway suite).

    356 HURON ST · Dec 10, 2025 · 202 m away
  • Minor varianceApproved

    To alter the development standards for a 13-storey mixed-use building with a three-level underground garage (approved by Site Specific Zoning By-Law 1144-2023), by increasing the number of storeys and building height from 13-storeys (43 m) to 15-storeys (55 m), increasing the permitted gross floor area, as well as reducing setbacks, minimum separations distances, and the number of parking spaces. A type "C" loading space will be provided and parking space access will be provided by a vehicular elevator. There will be a total of 40 residential dwelling units within the building on the lot.

    64 PRINCE ARTHUR AVE · Nov 12, 2025 · 422 m away
  • Minor varianceRefused

    To alter the development standards (as approved under Site Specific By-law 750-2023) for the 12-storey apartment building by increasing building heights and gross floor area, and reducing building setbacks and amenity gross floor area. A related Site Plan Application (21 155930 STE 11 SA) is currently under review.

    145 ST GEORGE ST · Sep 3, 2025 · 390 m away
  • Minor varianceApproved

    To alter the existing two-storey mixed-use building by constructing a rear three-storey addition with a ground floor one-car garage (abutting the laneway). The side (east) second and third storey portions of the rear addition will be partially cantilevered above the exterior passageway. The existing office space on the ground floor, as well as the two residential dwelling units on the second and third levels will be maintained.

    108 HARBORD ST · Aug 13, 2025 · 369 m away

Latest activity nearby

  • Zoning review

    Not Started

    700 SPADINA AVE · Nov 24, 2026 · 184 m away
  • Zoning review

    Application On Hold

    356 HURON ST · Nov 12, 2026 · 202 m away
  • Building permitmultiplex

    Proposal for HVAC upgrade, replacement of hydronic heating system, ameliorated ventilation

    482 HURON ST · Nov 10, 2026 · 271 m away
  • Building permitmultiplex

    Proposal for HVAC upgrade, replacement of hydronic heating system, ameliorated ventilation

    480 HURON ST · Nov 10, 2026 · 261 m away
  • Building permit

    Proposal to replace existing roof mounted life-safety natural gas emergency generator with a new outdoor life-safety natural gas generator.

    341 BLOOR ST W · Nov 4, 2026 · 139 m away
  • Building permit

    Proposed 3 storey entrance Addition to north elevation of existing Bissell Building. Addition to contain new accessible at-grade primary entrance, academic and office programed spaces and a new roof terrace. Scope of work includes renovations and alterations to existing Bissell Building levels 1 to 4 including new window openings at the ground level. The Project will also include landscaping.

    130-140 ST GEORGE ST · Nov 2, 2026 · 219 m away
  • Building permit

    Proposal to replace existing fire pump

    140 ST GEORGE ST · Oct 29, 2026 · 176 m away
  • Building permit

    Proposal for existing fire-pump replacement

    120 ST GEORGE ST · Oct 29, 2026 · 264 m away
  • Building permit

    Proposal for existing fire-pump replacement, replacement of all existing hose valves in every existing fire hose cabinet.

    130 ST GEORGE ST · Oct 29, 2026 · 219 m away
  • Building permit

    Proposal for installation of roof edge railings, roof mounted stair, fixed ladder and ladder port at TTC's Spadina Stn -Main Entrance

    7 SPADINA RD · Oct 28, 2026 · 268 m away

Neighbourhood: University

About the area around the lot, not the lot itself.

Nearest station
St George Station5 min walk
Nearest TTC stop
Spadina Ave at Sussex Ave3 min walk
Nearest cycling route
Bloor St WCycle Track, 3 min walk
Nearest traffic count
10,170 vehicles in 8 hBloor St W / Huron St, 160 m away, Jan 11, 2018
Serious collisions within 500 m
22021–2026, killed or seriously injured: 0 fatal, 0 with pedestrians, 2 with cyclists
Parks
Huron - Washington Parkette1 min walk
Matt Cohen Park2 min walk
Paul Martel Park4 min walk

Schools within 1 km

  • UNIVERSITY OF TORONTO SCHOOLS Private 2 min walk
  • SCHOOL OF CONTINUING STUDIES - U OF T, BLDG 103 University 2 min walk
  • PAUL PENNA DOWNTOWN JEWISH DAY SCHOOL & MILES NADAL JEWISH COMMUNITY CENTRE Private 4 min walk
  • ROTMAN SCHOOL OF MANAGEMENT - U OF T, BLDG 134 University 4 min walk
  • HOWLETT ACADEMY SCHOOL Private 4 min walk
  • MUNK SCHOOL OF GLOBAL AFFAIRS AT THE OBSERVATORY - U OF T, BLDG 89 University 5 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureUniversityMedian neighbourhood
Median household income (2020)$80,000$84,500
Households that own their home39%54%
Population (2021)6,43516,813
Homes built in 1960 or before59%29%
Homes needing major repairs11%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleUniversityCity median
Assault1740.5636.3
Robbery133.969.5
Homicide12.25.3
Auto theft182.6192.6
Theft over $5,000121.746.1
Break and enter730.3172.8
Theft from vehicles353188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
  • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.