HousePrecheckCheck an address

4021 Yonge StToronto · zoning, lot size and permit records

Commercial residential · CR 1.0 (c1.0; r1.0) SS2 (x154)67.4 × 74.1 m4,408 m²on Yonge Stcorner, also on Old York Mills Rd

Not a home

A commercial or mixed-use building

Its main building is large, in a commercial zone: shops, offices or a mixed-use building rather than one house. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Shops, offices or a mixed buildingCustomers, deliveries and evening activity; errands within a short walk.
  • 5 development applications open within 300 m, up to 40 storeysNew buildings may go up around here in the next years. More change nearby than at 93% of Toronto houses.
  • Major Transit Station Area: York MillsThe City plans more homes around the station: good for transit, and more building over time.
N20 m
67.4 m frontage74.1 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • TRCA regulated area (100% of lot)

    Needs a closer look

    Part of the lot is near a valley, floodplain, shoreline or wetland. Work there needs a TRCA permit and may be restricted.

    What it means. Additions, pools and new buildings in the regulated part need a TRCA permit and may be refused. Ask your insurer about flood coverage.

    How to confirm. A TRCA property inquiry letter says which policies apply ($385, at least two weeks). Details

    Ontario Regulation 41/24, TRCA Regulation Limit
  • Ravine and natural feature protection (100% of lot)

    Needs a closer look

    Part of the lot is in the area covered by the City's Ravine and Natural Feature Protection By-law. The City's map of the area was last published in 2019.

    What it means. In that part, injuring or removing a tree of any size, grading, filling or dumping needs a City permit. Plans for a pool, addition or garden suite there may be refused.

    How to confirm. Urban Forestry confirms where the protected area runs and whether work needs a permit. Details

    Toronto Municipal Code, Chapter 658
  • Natural Heritage System (100% of lot)

    Good to know

    Part of the lot is in the Natural Heritage System shown on Official Plan Map 9.

    What it means. New buildings or additions in that part need a natural heritage impact study.

    How to confirm. City Planning confirms the policies that apply. Details

    City of Toronto Official Plan, Map 9
  • 5 development applications open within 300 m

    Good to know

    5 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 40 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

23 records on file: more than at 100% of Toronto houses (median 0).

  • Building permit24 207919Closed

    Interior alterations to existing convenience store, convert existing non-alcoholic beverage cooler unit into a beer cave and non-alcoholic beverage cooler unit with associated sales are reno

    Sep 6, 2024 · 4021 YONGE ST
  • Building permit21 249956Closed

    To erect and display one non-illuminated ground sign, located along the north frontage, perpendicular to York Mills Road. The sign contains one sign face measuring 2.5 metres vertically by 1.2 metres horizontally, at a height of 3.0 metres. (See Variance #21-249960)*** SHELL ***

    May 8, 2023 · 4021 YONGE ST
  • Building permit22 227900Closed

    Replace three, existing BFP devices with new.

    Dec 9, 2022 · 4021 YONGE ST
  • Zoning review21 249960 ZSVClosed
    Dec 19, 2021 · 4021 YONGE ST
  • Zoning review21 147724 ZPRClosed
    Apr 29, 2021 · 4021 YONGE ST
  • Building permit19 217015Cancelled

    Proposed MUA roof-top unit (RTU) replacement; gas piping and wiring to be replaced

    Sep 6, 2019 · 4021 YONGE ST
  • Building permit18 161285Closed

    To erect and display two identical illuminated ground sign displaying both static and readograph copy erected at north and west frontage of the gas station property. in addition in two identical illuminated overhanging structure signs displaying static copy erected on north and south canopy existed in premises.*****SHELL******

    May 17, 2019 · 4021 YONGE ST
  • Zoning review19 117109 ZSVClosed
    Feb 20, 2019 · 4021 YONGE ST
Show 15 older records
  • Building permit18 182934Cancelled

    To erect and display one illuminated wall sign, displaying static copy, located on westerly elevation of a convenience store, located on a gas station property. Measuring 2.7m horizontally by 0.8m vertically at a height of 3.53m.***FRESHII***

    Jul 24, 2018 · 4021 YONGE ST
  • Building permit16 204527Closed

    Construct interior alterations to the security offices (47m2)

    Aug 17, 2016 · 4021 YONGE ST
  • Building permit15 251075Closed

    Proposal for interior alterations to existing convenience store - "Shell Canada"

    Nov 24, 2015 · 4021 YONGE ST
  • Building permit14 268798Closed

    To erect and display two illuminated wall signs, in conjunction with a petrol station as well as a deli shop inside the station. **SHELL** **deli2go**

    Apr 29, 2015 · 4021 YONGE ST
  • Building permit15 118771Cancelled

    To erect and display one wall sign.**Shell**

    Mar 4, 2015 · 4021 YONGE ST
  • Zoning review15 118760 ZSVClosed
    Feb 18, 2015 · 4021 YONGE ST
  • Building permit15 102008Closed

    Proposal for interior alteration to existing gas station convenience store.

    Jan 12, 2015 · 4021 YONGE ST
  • Zoning review14 259560 ZPRClosed
    Dec 3, 2014 · 4021 YONGE ST
  • Building permit13 242461Cancelled

    Proposal to replace RTU unit on existing Gas Station.

    Dec 4, 2013 · 4021 YONGE ST
  • Zoning review12 189281 LTOClosed
    Jun 8, 2012 · 4021 YONGE ST
  • Building permit11 245778Closed

    Install two backflow preventers

    Sep 19, 2011 · 4021 YONGE ST
  • Building permit99 100138Closednew building

    Revision to the building permit file B99-2123.

    Nov 10, 1999 · 4021 YONGE ST
  • Building permit99 090692Closed

    HVAC FOR B9902123

    Oct 25, 1999 · 4021 YONGE ST
  • Building permit99 089561Closed

    27FX/5RD/2BFP/STM/SANI

    Sep 28, 1999 · 4021 YONGE ST
  • Building permit99 088598Closednew building

    DEMO & BUILD NEW CAR WASH

    Sep 28, 1999 · 4021 YONGE ST

Check before you build

  • Site-specific exception 900.11.10(154)

    Needs a closer look

    1 older by-law that still prevails applies to this lot. It can override the standard rules on this page.

    Zoning By-law 569-2013, Chapter 900
Exception 900.11.10(154)Applies

These parts of the exception apply to this lot's address.

  1. Older by-law A

    Section 64.23(90), former North York zoning by-law 7625.

By-law 569-2013, Chapter 900

Lot facts

Area
4,408 m²
Frontage
67.4 m
Depth
74.1 m
Street
Yonge St
Corner lot
Yes, also on Old York Mills Rd74.1 m along it
Public lane
None
House footprint
719 m²roof up to 6.4 m
Back yard
18.4 mhouse to rear lot line
Side yards
20.9 m and 25.6 mhouse to side lot lines
Buildings on the lot
2house, garage, sheds
Max height
10.5 m
Max lot coverage
33%

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • Site and Area Specific Policy 090. The Official Plan has a policy for this site or area that varies the general rules. Read it before relying on zoning alone. Source
  • Major Transit Station Area: York Mills. The lot is inside the York Mills Major Transit Station Area approved by the Province (Site and Area Specific Policy 639). Source
  • Zone CR 1.0 (c1.0; r1.0) SS2 (x154) (Commercial Residential). Chapter 40, section 40.10 of the by-law. Source

Around this lot

Minor variances approved
100%9 of 9 decisions
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
0
Development applications
8

Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 9 variance decisions: no more than at most Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To permit a Recreation Use, to facilitate a kids' indoor playground, with a large recreation facility including serving food -"Petito Kid's Indoor Playground". The unit 100 is approximately 466.65m². Also, intend to introduce a Pickle Ball Facility in a below-grade unit in the existing building. That unit is approximately 1,185.72m².Part of Lot 11 Concession 1 EYS, Part of Lot 92 Registered Plan 204, Part of Units 1 and 2 Plan D-48, Part of Lot 16 and Block A

    10 YORK MILLS RD · May 23, 2024 · 80 m away

Latest activity nearby

  • Building permit

    Interior and exterior alterations with structural modifications, including installation of a new elevator within an existing single-family dwelling.

    27 YORK RIDGE RD · Nov 19, 2026 · 281 m away
  • Building permit

    Alternative Solution - Standpipe System Design

    4050 YONGE ST · Nov 2, 2026 · 136 m away
  • Zoning review

    Not Started

    10-36 YORK MILLS RD · Oct 28, 2026 · 95 m away
  • Building permit

    Proposal for fire pump replacement project.

    20 YORK MILLS RD · Oct 16, 2026 · 120 m away
  • Zoning review

    Notice Sent

    24 YORK RIDGE RD · Sep 22, 2026 · 209 m away
  • Building permitnew building, new house

    Revision No, 4: two new roof skylights on Level 3Revision 03 - Change to building height. -------------------------------------------------------------------------Revision 02 - Change some dimensions and locations. Drawings attached. -------------------------------------------------------------------------Revision 01 - Change to concrete wall via form to ICF Concrete Walls. -------------------------------------------------------------------------Proposal to construct a new detached SFD with a three door integral garage, two front decks, and a finished basement with an elevator.

    23 YORK RIDGE RD · Aug 28, 2026 · 253 m away
  • Development application

    Proposal of two residential mixed-use towers of 55 and 40 storeys (176.2 and 132.5 metres, exclusive of the mechanical penthouses), with approximately 903 dwelling units in a mix of unit types, including 267 rental units. The proposal is comprised of a total GFA of 85,220 square metres, consisting of approximately 82,336 square metres of residential GFA and 2,884 square metres of non-residential GFA, resulting in a density of 9.77 FSI on the development site and 3.24 on the subject lands.

    10-36 YORK MILLS RD · Aug 7, 2026 · 83 m away · City file
  • Building permit

    Proposed replace existing retaining walls in rear yard

    27 YORK RIDGE RD · Aug 7, 2026 · 281 m away
  • Zoning review

    Closed

    23 YORK RIDGE RD · Jul 29, 2026 · 253 m away
  • Building permit

    Rev 01 - Retain the entry door where is as is.Proposal for interior alterations to existing office space.

    36 YORK MILLS RD · Apr 21, 2026 · 139 m away

Neighbourhood: St.Andrew-Windfields

About the area around the lot, not the lot itself.

Nearest station
York Mills Station2 min walk
Nearest TTC stop
York Mills Rd at Yonge St East Side1 min walk
Nearest cycling route
York Mills Park TrlMulti-Use Trail - Connector, 1 min walk
Nearest traffic count
8,586 vehicles in 8 hYork Mills Rd: Yonge St - Old York Mills Rd, 60 m away, Dec 17, 2022
Serious collisions within 500 m
12021–2026, killed or seriously injured: 0 fatal, 1 with pedestrians, 0 with cyclists
Parks
York Mills Park1 min walk
York Mills Valley Park1 min walk
Jolly Miller Park2 min walk

Schools within 1 km

  • LORETTO ABBEY CATHOLIC SECONDARY SCHOOL English Separate 8 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureSt.Andrew-WindfieldsMedian neighbourhood
Median household income (2020)$118,000$84,500
Households that own their home64%54%
Population (2021)16,96016,813
Homes built in 1960 or before17%29%
Homes needing major repairs5%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleSt.Andrew-WindfieldsCity median
Assault614.8636.3
Robbery106.969.5
Shootings5.310.5
Auto theft203.2192.6
Theft over $5,00042.846.1
Break and enter384.9172.8
Theft from vehicles219.2188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
  • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.