HousePrecheckCheck an address

400 Scarlett RdToronto · zoning, lot size and permit records

Residential apartment commercial · RAC (f24.0; au116.0) (x118)≈ 52.9 × 113.5 m827 m²on Scarlett Rd

Not a home

Land without a building

The City's 3D model of buildings shows nothing standing on this parcel: vacant land, a parking lot or a yard. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Empty land or parkingWhat gets built here matters most to the street: read the applications on it and around it below.
  • Permits or applications open on this parcelRecent records on this lot: 26 214948 WET 02 SA (The proposed development spans multiple municipal addresses, including 400 Scarlett Roa..., 2026). Larger work can mean noise and trucks next door; read what each one is for.
  • 2 development applications open within 300 m, up to 35 storeysNew buildings may go up around here in the next years. More change nearby than at 76% of Toronto houses.
N20 m
≈ 52.9 m frontage≈ 113.5 m deepirregular lot, estimated

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • Work or applications in progress

    Good to know

    Recent records on this lot: 26 214948 WET 02 SA (The proposed development spans multiple municipal addresses, including 400 Scarlett Roa..., 2026).

    What it means. The owner has planned or started work. Ask what it covers, whether it will be finished before closing, and who pays for what is left.

    How to confirm. Application details and decisions are in the City's Application Information Centre. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards); City of Toronto, Development Applications
  • 2 development applications open within 300 m

    Good to know

    2 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 35 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

1 records on file: more than at 53% of Toronto houses (median 0).

  • Development application26 214948 WET 02 SAUnder Review

    The proposed development spans multiple municipal addresses, including 400 Scarlett Road and 401 Scarlett Road. The platform is connected to two distinct entrance buildings flanking Scarlett Road below with vertical circulation towers containing elevators, stairs, and escalators.

    Aug 6, 2026 · 400 SCARLETT RD · City file

Check before you build

  • Site-specific exception 900.8.10(118)

    Needs a closer look

    1 older by-law that still prevails applies to this lot. It can override the standard rules on this page.

    Zoning By-law 569-2013, Chapter 900
Exception 900.8.10(118)Applies

These parts of the exception apply to this lot's address.

  1. Older by-law A

    Former City of Etobicoke By-law No. 702.

By-law 569-2013, Chapter 900

Lot facts

Area
827 m²
Frontage
52.9 mestimated, irregular lot
Depth
113.5 mestimated, irregular lot
Street
Scarlett Rd
Corner lot
No
Public lane
None
Max height
—
Max lot coverage
40%
  • Minimum frontage 24 m. Frontage is about 52.9 m (estimated, irregular lot): meets the zone minimum. Source
  • Zone RAC (f24.0; au116.0) (x118) (Residential Apartment Commercial). Chapter 15, section 15.20 of the by-law. Source

Around this lot

Minor variances approved
100%2 of 2 decisions
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
0
Development applications
3

Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 2 variance decisions: no more than at most Toronto houses (median 19).

Latest activity nearby

  • Building permit

    Proposed 4-inch backflow preventer on the incoming water service.

    35 FONTENAY CRT · Nov 19, 2026 · 204 m away
  • Zoning review

    Not Started

    32 RICHVIEW RD · Nov 9, 2026 · 233 m away
  • Building permit

    Adding a sink to the new kitchenette in the staff room of the condo common areas. Redoing floor from carpet to LVT

    38 FONTENAY CRT · Oct 1, 2026 · 104 m away
  • Building permit

    Proposed garage repairs - roof slab & ramp overburden, waterproofing replacement, localized concrete repairs, localized drain replacement.

    15 LA ROSE AVE · Sep 17, 2026 · 292 m away
  • Development application

    The proposed development spans multiple municipal addresses, including 400 Scarlett Road and 401 Scarlett Road. The platform is connected to two distinct entrance buildings flanking Scarlett Road below with vertical circulation towers containing elevators, stairs, and escalators.

    400 SCARLETT RD · Aug 6, 2026 · 17 m away · City file
  • Zoning review

    Cancelled

    1 RICHVIEW RD · Jun 25, 2026 · 144 m away
  • Building permit

    Targeted exterior wall repairs including localized vertical concrete and exposed concrete slab edge repairs (estimated 173m2)

    39 RICHVIEW RD · Feb 23, 2026 · 264 m away
  • Development application

    Rezoning Application proposes the development of a 35-storey residential building. The building would include a total of 374 residential units. A paved access from Richview Road along the north property line would be provided, leading to 3 levels of below-grade parking, providing a total of 390 parking spaces; as well as 282 bicycle parking spaces. The proposed development includes a total GFA of 32,553 square metres and a FSI of 7.42.

    32 RICHVIEW RD · Aug 26, 2025 · 245 m away · City file
  • Building permit

    Installation of new Sprinkler System in Parking Garage Level 1 & 2

    39 RICHVIEW RD · Aug 25, 2025 · 264 m away
  • Zoning review

    Closed

    15 LA ROSE AVE · Apr 24, 2025 · 292 m away

Neighbourhood: Edenbridge-Humber Valley

About the area around the lot, not the lot itself.

Nearest station
Weston GO Station29 min walk
Nearest TTC stop
Eglinton Ave West at Scarlett Rd1 min walk
Nearest cycling route
Humber River Recreational TrlMulti-Use Trail, 1 min walk
Nearest traffic count
47,109 vehicles in 14 hScarlett Rd / Eglinton Ave W, 50 m away, Oct 29, 2024
Serious collisions within 500 m
22021–2026, killed or seriously injured: 0 fatal, 0 with pedestrians, 0 with cyclists
Parks
Canadian Ukrainian Memorial Park1 min walk
Scarlett Mills Park2 min walk
Scarlett Heights Park2 min walk

Schools within 1 km

  • YORK HUMBER HIGH SCHOOL English Public 11 min walk
  • HOLY ANGELS CATHOLIC SCHOOL English Separate 12 min walk
  • ST DEMETRIUS CATHOLIC ELEMENTARY SCHOOL English Separate 13 min walk
  • WESTMOUNT JR SCHOOL English Public 13 min walk
  • PORTAGE TRAIL COMMUNITYSCHOOL English Public 15 min walk
  • INSTITUTE OF CANADIAN EDUCATION Private 16 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureEdenbridge-Humber ValleyMedian neighbourhood
Median household income (2020)$100,000$84,500
Households that own their home57%54%
Population (2021)15,19016,813
Homes built in 1960 or before26%29%
Homes needing major repairs4%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleEdenbridge-Humber ValleyCity median
Assault306.8636.3
Robbery53.869.5
Auto theft231.5192.6
Theft over $5,00048.446.1
Break and enter242.2172.8
Theft from vehicles59.2188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 28, 2026, published Nov 28, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 28, 2026, published Nov 27, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 28, 2026, published Nov 27, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 28, 2026, published Nov 27, 2026
  • Multi-tenant house licences: loaded Nov 28, 2026, published Nov 27, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 28, 2026, published Nov 27, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.