HousePrecheckCheck an address

40 Wabash AveToronto · zoning, lot size and permit records

Also 50 Wabash Ave

≈ 51.8 × 161.7 m6,738 m²on MacDonell Avecorner, also on Wabash Ave

Not a home

Future Parkdale Community Centre

The City of Toronto's real estate inventory lists Future Parkdale Community Centre here, on City land in City use. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Green space next doorShade, play and walks; busy parks also bring events and evening noise.
  • Permits or applications open on this parcelRecent records on this lot: 25 104643 (Partial Demolition of existing building, and new construction of a City of Toronto Comm..., 2025); 24 180616 STE 04 SA (City-initiated site plan application proposes a Community Recreation Centre adjacent to..., 2024). Larger work can mean noise and trucks next door; read what each one is for.
  • 2 development applications open within 300 m, up to 4 storeysNew buildings may go up around here in the next years. More change nearby than at 81% of Toronto houses.
N50 m
≈ 51.8 m frontage≈ 161.7 m deepirregular lot, estimated

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • Heritage property: designated (Part IV)

    Needs a closer look

    On the City's Heritage Register. Demolition and exterior changes need heritage review.

    What it means. Renovations, additions and demolition can take longer, cost more or be refused.

    How to confirm. Heritage Planning at the City confirms the status and what it covers. Details

    City of Toronto Heritage Register
  • 7 by-law investigations closed in the last two years

    Good to know

    Closed files (Property Standards): 26 270027 PRS 00 IR (Property Standards, 2026); 26 247165 PRS 00 IR (Property Standards, 2026); 26 208941 PRS 00 IR (Property Standards, 2026); and 4 more.

    What it means. Someone raised an issue here and the City closed the file. Ask the seller what it was about.

    City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations
  • Work or applications in progress

    Good to know

    Recent records on this lot: 25 104643 (Partial Demolition of existing building, and new construction of a City of Toronto Comm..., 2025); 24 180616 STE 04 SA (City-initiated site plan application proposes a Community Recreation Centre adjacent to..., 2024).

    What it means. The owner has planned or started work. Ask what it covers, whether it will be finished before closing, and who pays for what is left.

    How to confirm. Application details and decisions are in the City's Application Information Centre. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards); City of Toronto, Development Applications
  • 1 Committee of Adjustment file on this lot

    Good to know

    1 approved. A0516/26TEY (To construct a new four-storey detached building (Wabash Community Recreation Centre) w..., 2026).

    What it means. Approved variances and consents stay with the property, including any conditions in the decision. They allow what was approved, not more.

    How to confirm. Decisions are in the Application Information Centre; older files are available from the Committee of Adjustment office. Details

    City of Toronto, Committee of Adjustment applications (2001 onwards)
  • 2 development applications open within 300 m

    Good to know

    2 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 4 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

18 records on file: more than at 100% of Toronto houses (median 0).

  • By-law investigation26 270027 PRS 00 IRClosed

    Property Standards

    Nov 15, 2026 · 40 WABASH AVE
  • Minor varianceA0516/26TEYApproved

    To construct a new four-storey detached building (Wabash Community Recreation Centre) with a west side attached outdoor activity space, a canopy over the west side main entrance, and solar roof panels on rear third floor and roof level. There will be a total of 10 surface parking spaces (including three accessible parking spaces), on the west side main entrance, accessed from Wabash Avenue. A related Site Plan Control application (File No. 24 180616 STE 04 SA) is currently under review and consideration.

    Oct 21, 2026 · 40 WABASH AVE
  • By-law investigation26 247165 PRS 00 IRClosed

    Property Standards

    Sep 30, 2026 · 40 WABASH AVE
  • By-law investigation26 208941 PRS 00 IRClosed

    Property Standards

    Jul 26, 2026 · 40 WABASH AVE
  • By-law investigation26 188583 PRS 00 IRClosed

    Property Standards

    Jun 21, 2026 · 40 WABASH AVE
  • By-law investigation25 237873 PRS 00 IRClosed

    Property Standards

    Oct 9, 2025 · 40 WABASH AVE
  • Zoning review24 180616 PSPClosed
    Aug 8, 2025 · 40 WABASH AVE
  • By-law investigation25 189080 PRS 00 IRClosed

    Property Standards

    Jul 6, 2025 · 40 WABASH AVE
Show 10 older records
  • By-law investigation25 149693 PRS 00 IRClosed

    Property Standards

    Apr 26, 2025 · 40 WABASH AVE
  • Building permit25 104643Examiner's Notice Sentnew building

    Partial Demolition of existing building, and new construction of a City of Toronto Community Centre with a two major anchor programs; a Natatorium andGymnasium. The building will be four stories and will occupy the South East portion of the Sorauren Park in the city west end. The lands surrounding thenew community centre will be developed as part of the work.

    Jan 14, 2025 · 40 WABASH AVE
  • Development application24 180616 STE 04 SAUnder Review

    City-initiated site plan application proposes a Community Recreation Centre adjacent to Sorauren Park. The community centre will be a 4 storey (26 metre) building with programs identified in the City's Parks and Recreation Facilities Master Plan to include a double gymnasium, an aquatic component, multipurpose rooms and fitness room spaces.

    Jul 15, 2024 · 40 WABASH AVE · City file
  • Building permit17 236904Closed

    Proposal to construct a temporary structure (stage) for the Wabash Fall Festival at Sorauren Park. Setup and dismantle on Sep. 23/17Convenience address is 50 Wabash Ave.

    Sep 22, 2017 · 40 WABASH AVE
  • Building permit15 227001Closed

    Proposal to construct a temporary structure (stage) for the 20th Anniversary Celebration at Sorauren Park. Setup and dismantle on Sep. 26/15 Convenience addres is 50 Wabash Ave.

    Sep 24, 2015 · 40 WABASH AVE
  • Building permit07 160282Closed

    Interior alterations to existing 2 sty industrial office building in Sorauren Park to convert to a new Fieldhouse (no overnight sleeping).

    May 2, 2007 · 50 WABASH AVE
  • Zoning review05 125044 ZSVClosed
    Apr 20, 2005 · 40 WABASH AVE
  • Zoning review05 125042 ZPRClosed
    Apr 20, 2005 · 40 WABASH AVE
  • Zoning review94 025754 LTOClosed
    Dec 22, 1994 · 40 WABASH AVE
  • Zoning review92 025840 LTOClosed
    Aug 7, 1992 · 40 WABASH AVE

Check before you build

  • Zoning not in By-law 569-2013

    Needs a closer look

    This lot is not covered by the citywide zoning by-law's map. It is probably still governed by a former municipal by-law, which this tool does not read yet.

    Zoning By-law 569-2013

Lot facts

Area
6,738 m²
Frontage
51.8 mestimated, irregular lot
Depth
161.7 mestimated, irregular lot
Street
MacDonell Ave
Corner lot
Yes, also on Wabash Ave161.7 m along it
Public lane
None
House footprint
1,321 m²roof up to 25 m
Back yard
78.8 mhouse to rear lot line
Side yards
5.9 m and 6.2 mhouse to side lot lines
Buildings on the lot
3house, garage, sheds
Max height
—
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • 19 City trees in front of this lot. The City's street tree inventory lists 19 trees at this address: maple, manitoba (67 cm), tree of heaven (52 cm), maple, manitoba (47 cm). Diameter is the trunk at breast height. Source

Around this lot

Minor variances approved
88%29 of 33 decisions
Garden suite permits
0
Laneway suite permits
3
Multiplex permits
4
Development applications
4

Within 300 m, last 10 years. 7 suite and multiplex permits: more than at 67% of Toronto houses (median 3). 33 variance decisions: more than at 67% of Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To construct a new one-storey semi-detached ancillary building (containing a one-car garage), in the rear yard, abutting the laneway.

    44 FERMANAGH AVE · Nov 4, 2026 · 302 m away
  • Minor varianceApproved

    To alter the existing three-storey semi-detached dwelling by increasing the building height of the front third storey with a new sloped roof. Also, to construct a rear two-storey addition (including basement) with a ground floor deck and stairs. There will be one parking space in the rear yard, abutting the laneway.

    112 WRIGHT AVE · Nov 4, 2026 · 337 m away
  • Minor varianceApproved

    To construct a new one-storey semi-detached ancillary building (garage containing stacked parking for two car parking spaces via car lift), in the rear yard, abutting the laneway. The existing rear detached ancillary building (garage) will be demolished.

    46 FERMANAGH AVE · Nov 4, 2026 · 308 m away
  • Minor varianceApproved

    To construct a new four-storey detached building (Wabash Community Recreation Centre) with a west side attached outdoor activity space, a canopy over the west side main entrance, and solar roof panels on rear third floor and roof level. There will be a total of 10 surface parking spaces (including three accessible parking spaces), on the west side main entrance, accessed from Wabash Avenue. A related Site Plan Control application (File No. 24 180616 STE 04 SA) is currently under review and consideration.

    40 WABASH AVE · Oct 21, 2026 · 10 m away
  • Minor varianceApproved

    To construct a new one-storey detached ancillary building (containing a one-car garage), in the rear yard, abutting the laneway.

    12 FERN AVE · Sep 9, 2026 · 250 m away

Latest activity nearby

  • Minor variancePending

    To legalize and to maintain the construction of Unit 102 (located on the ground floor of the existing three-storey attached building), for the conversion of a restaurant use, which was constructed without an authorized building permit.

    345 SORAUREN AVE · Nov 25, 2026 · 211 m away
  • Building permit

    Party wall administrative permit for work occuring at 28 Wright

    30 WRIGHT AVE · Nov 23, 2026 · 145 m away
  • Building permit

    Proposal for underpinning and interior alterations to finish the basement

    28 WRIGHT AVE · Nov 20, 2026 · 145 m away
  • Building permit

    Revision 01 - revision to building permit, permit no. 26 254574 BLD 00 SRProposed interior alterations to all levels and a new rear deck. Party wall admin permit 26-254589 BLD 00 SR (15 Westminster Ave)

    13 WESTMINSTER AVE · Nov 16, 2026 · 200 m away
  • Building permit

    Proposal for underpinning and interior alterations to finish the basement

    28 WRIGHT AVE · Nov 13, 2026 · 145 m away
  • Building permit

    Interior alteration to Unit 2A-201 on Level 2 in an existing mixed-use building. Current use of unit is Group D[service/rental] and the proposed use is Group D [artist's studio].See also 26 246252 WNP

    345 SORAUREN AVE · Nov 12, 2026 · 211 m away
  • Building permit

    REVISION 3 - Add steel stud framing behind new exterior finishes (i.e., ACM cladded piers and vertical metal siding above storefront glazing) at existing entrance portal ¿ south elevation to suit as-built site conditions. Proposal for interior alterations to an existing retail grocery store - "No Frills"

    222 LANSDOWNE AVE · Nov 12, 2026 · 190 m away
  • Building permit

    Proposal to demolish unsafe garage and construct a new garage.See also 26 242822 UNS 00 VI

    37 FERN AVE · Nov 3, 2026 · 285 m away
  • Minor varianceApproved

    To construct a new four-storey detached building (Wabash Community Recreation Centre) with a west side attached outdoor activity space, a canopy over the west side main entrance, and solar roof panels on rear third floor and roof level. There will be a total of 10 surface parking spaces (including three accessible parking spaces), on the west side main entrance, accessed from Wabash Avenue. A related Site Plan Control application (File No. 24 180616 STE 04 SA) is currently under review and consideration.

    40 WABASH AVE · Oct 21, 2026 · 10 m away
  • Building permit

    Party wall admin permit for work at 13 Westminster Ave. Permit no. 26-254574 BLD 00 SR

    15 WESTMINSTER AVE · Oct 19, 2026 · 205 m away

Neighbourhood: Roncesvalles

About the area around the lot, not the lot itself.

Nearest station
Lansdowne Station20 min walk
Nearest TTC stop
Lansdowne Ave at Dundas St West South Side4 min walk
Nearest cycling route
Wabash AveSharrows, 1 min walk
Nearest traffic count
4,430 vehicles in 14 hSorauren Ave / Wright Ave, 230 m away, Apr 30, 2024
Serious collisions within 500 m
32021–2026, killed or seriously injured: 0 fatal, 2 with pedestrians, 1 with cyclists
Parks
Sorauren Avenue Park1 min walk
Charles G. Williams Park1 min walk
West Toronto Railpath5 min walk

Schools within 1 km

  • ACADEMY OF ENLIGHTENED MINDS Private 3 min walk
  • SHIRLEY ST JR & CITY VIEW ALTERNATIVE English Public 7 min walk
  • FERN AVENUE JR & SR PUBLIC SCHOOL English Public 8 min walk
  • TORONTO OUEST SECONDARY SCHOOL French Public 8 min walk
  • SAINT FRERE ANDRE SECONDARY SCHOOL French Separate 8 min walk
  • ST VINCENT DE PAUL CATHOLIC ELEMENTARY SCHOOL English Separate 8 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureRoncesvallesMedian neighbourhood
Median household income (2020)$88,000$84,500
Households that own their home47%54%
Population (2021)14,61016,813
Homes built in 1960 or before67%29%
Homes needing major repairs10%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleRoncesvallesCity median
Assault939.5636.3
Robbery66.269.5
Auto theft102.4192.6
Theft over $5,000646.1
Break and enter252.9172.8
Theft from vehicles150.6188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
  • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.