HousePrecheckCheck an address

40 Temperance StToronto · zoning, lot size and permit records

Also 37 Richmond St W

67.9 × 53.5 m3,513 m²on Temperance St

Not a home

Walkway Easment (Along Ws Of Cloud Gardens)

The City of Toronto's real estate inventory lists Walkway Easment (Along Ws Of Cloud Gardens) here, on City land in City use. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • City of Toronto landThe City decides what happens here; ask it about any plans.
  • Permits or applications open on this parcelRecent records on this lot: 26 189362 (INTERIOR ALTERATIONS INCLUDING DEMOLITION OF INTERIOR PARTITIONS AND CONSTRUCTION OF NEW, 2026); 26 114450 (Fire alarm signal sequence modification to a new sequence for an existing office buildi..., 2026); 25 269413 (TENANT INTERIOR ALTERATIONS FIT-OUT (UNIT 100) FOR GROUP A-2 EATING ESTABLISHMENT, 2026). Larger work can mean noise and trucks next door; read what each one is for.
  • 2 development applications open within 300 m, up to 64 storeysNew buildings may go up around here in the next years. More change nearby than at 94% of Toronto houses.
N20 m
67.9 m frontage53.5 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • Heritage property: designated (Part IV)

    Needs a closer look

    On the City's Heritage Register. Demolition and exterior changes need heritage review.

    What it means. Renovations, additions and demolition can take longer, cost more or be refused.

    How to confirm. Heritage Planning at the City confirms the status and what it covers. Details

    City of Toronto Heritage Register
  • 6 building permits open, the oldest since 2019

    Needs a closer look

    Still open in the City's records: 24 235811 (Proposed interior alterations on Floor 19 including demolition of partitions, 2024, status Permit Issued); 24 208240 (Proposal for interior alterations for new takeout restaurant - UNIT F6, Concourse Level..., 2024, status Inspection); 23 212453 (INSTALLATION OF TWENTY-ONE (21) ELECTRO-MAGNETIC LOCKS INSTALLED ON 23RD-26TH FLOORS, 2023, status Inspection); and 3 more.

    What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.

    How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)
  • Work or applications in progress

    Good to know

    Recent records on this lot: 26 189362 (INTERIOR ALTERATIONS INCLUDING DEMOLITION OF INTERIOR PARTITIONS AND CONSTRUCTION OF NEW, 2026); 26 114450 (Fire alarm signal sequence modification to a new sequence for an existing office buildi..., 2026); 25 269413 (TENANT INTERIOR ALTERATIONS FIT-OUT (UNIT 100) FOR GROUP A-2 EATING ESTABLISHMENT, 2026).

    What it means. The owner has planned or started work. Ask what it covers, whether it will be finished before closing, and who pays for what is left.

    How to confirm. Application details and decisions are in the City's Application Information Centre. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards); City of Toronto, Development Applications
  • 2 Committee of Adjustment files on this lot

    Good to know

    2 approved. A0189/14TEY (To alter the redevelopment plan for a 32-storey mixed-use office building with retail a..., 2014); B0009/04TEY (The applicant is seeking the consent of the Committee of Adjustment to create an easeme..., 2004).

    What it means. Approved variances and consents stay with the property, including any conditions in the decision. They allow what was approved, not more.

    How to confirm. Decisions are in the Application Information Centre; older files are available from the Committee of Adjustment office. Details

    City of Toronto, Committee of Adjustment applications (2001 onwards)
  • 2 development applications open within 300 m

    Good to know

    2 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 64 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

70 records on file: more than at 100% of Toronto houses (median 0).

  • Building permit26 189362Inspection

    INTERIOR ALTERATIONS INCLUDING DEMOLITION OF INTERIOR PARTITIONS AND CONSTRUCTION OF NEW.

    Jun 25, 2026 · 40 TEMPERANCE ST
  • Building permit26 167878Closed

    HVAC - Interior alterations to a non-residential building. Proposed two new separate rooms in an existing office suite

    Jun 2, 2026 · 40 TEMPERANCE ST
  • Building permit26 152988Closed

    Proposed interior alterations to the existing office 18th Floor.

    May 4, 2026 · 40 TEMPERANCE ST
  • Building permit26 114450Permit Issued

    Fire alarm signal sequence modification to a new sequence for an existing office building on floors 2nd to 12th.

    Mar 12, 2026 · 40 TEMPERANCE ST
  • Building permit25 269413Inspection

    TENANT INTERIOR ALTERATIONS FIT-OUT (UNIT 100) FOR GROUP A-2 EATING ESTABLISHMENT

    Jan 30, 2026 · 40 TEMPERANCE ST
  • Building permit26 100673Closed

    HVAC - PROPOSAL FOR INTERIOR RENOVATION TO EXISTING OFFICE SPACE WITH NEW OFFICE.

    Jan 7, 2026 · 40 TEMPERANCE ST
  • Building permit25 216315Closed

    Proposed interior alterations of existing Scotiabank offices 8th floor

    Sep 19, 2025 · 40 TEMPERANCE ST
  • Building permit25 172803Closed

    Proposal for interior to existing bank.

    Jul 9, 2025 · 40 TEMPERANCE ST
Show 62 older records
  • Building permit24 235811Permit Issued

    Proposed interior alterations on Floor 19 including demolition of partitions

    Nov 14, 2024 · 40 TEMPERANCE ST
  • Building permit24 208240Inspection

    Proposal for interior alterations for new takeout restaurant - UNIT F6, Concourse Level; "Sorry I've Got Plants"

    Oct 7, 2024 · 40 TEMPERANCE ST
  • Building permit24 198893Closed

    Proposal for maglock installation in the lobby.

    Aug 21, 2024 · 40 TEMPERANCE ST
  • Building permit24 142855Closed

    Proposed interior alterations to an existing office space. *UNIT 1901*

    May 31, 2024 · 40 TEMPERANCE ST
  • Building permit23 213039Cancelled

    Proposal for interior alterations to this vacant shell retail unit 100, located on the ground level, to be converted into a new premises used as a restaurant for tenant - 'Marbl Fidi'. Work also includes creating a new mezzanine floor level. Additional NRGFA proposed. [Bay Adelaide Centre - ScotiaBank North Tower]

    May 21, 2024 · 40 TEMPERANCE ST
  • Building permit24 124659Closed

    Proposed installation of 2 electromagnetic locks on 26th floor stairwells

    Apr 5, 2024 · 40 TEMPERANCE ST
  • Building permit24 127616Closed

    1 ground sign

    Mar 22, 2024 · 40 TEMPERANCE ST
  • Building permit23 180126Closed

    REV 01 - The scope is attached in the cover letter: revision occurs on level 26 Main Café roomProposal for interior alterations for single office tenant - 'CIRO' (Cdn. Investment Regulatory Organization) on floor levels 23, 24, 25 & 26. The scope of work incl. erection of non-loadbearing partitions, the re-alignment & re-distribution of elect., mech., & life safety systems. Egress locations are exist. to remain. [Bay Adelaide Centre - North Tower]

    Jan 25, 2024 · 40 TEMPERANCE ST
  • Building permit23 235011Closed

    PROPOSED INTERIOR ALTERATIONS TO TURN A VACANT SPACE TO AN OFFICE - CONSTRUCTION OF NEW PARTITIONS.

    Jan 11, 2024 · 40 TEMPERANCE ST
  • Building permit23 146505Closed

    REVISIONS TO DEMISING WALLS (FOR CORRIDORS & 2 NEW UNITS) AND ELEVATOR LOBBY ONLY. INTERIOR FIT-OUT OF 4 SUITES IS REMOVED FROM SCOPE. 2 REDEMISED VACANT SUITES ADDED. IN ADDITION, ALL PLUMBING IS REMOVED FROM SCOPE.Proposal for interior alterations to construct partition walls & demising walls to create 4 new office units (Suites A, B, C & Turnkey Suite) on the 19th floor level. [Bay Adelaide Centre - North Tower]

    Jan 10, 2024 · 40 TEMPERANCE ST
  • Zoning review23 235855 ZSVClosed
    Dec 14, 2023 · 40 TEMPERANCE ST
  • Zoning review23 235848 ZSVCancelled
    Dec 14, 2023 · 40 TEMPERANCE ST
  • Building permit23 176334Closed

    REV 01: 0HR RATING IS REMOVED FROM DEMISING PARTITION.

    Dec 5, 2023 · 40 TEMPERANCE ST
  • Building permit23 212453Inspection

    INSTALLATION OF TWENTY-ONE (21) ELECTRO-MAGNETIC LOCKS INSTALLED ON 23RD-26TH FLOORS

    Oct 18, 2023 · 40 TEMPERANCE ST
  • Building permit23 186166Closed

    Proposal for interior alterations to new office suite 2701 located on the 27th floor level for new office tenant - 'Cozen O'Connor'. [Bay Adelaide Centre - North Tower]

    Sep 15, 2023 · 40 TEMPERANCE ST
  • Zoning review23 195734 ZPRClosed
    Aug 30, 2023 · 40 TEMPERANCE ST
  • Building permit21 203660Closed

    Rev 1: New office interior alteration to levels 15, 16 and 17 and 18 of an existing building. Partial demolition/construction of existing base building ceilings. New partitions and interconnecting stair.Proposal for interior alterations for exisitng office building Levels 15, 16 and 17

    Mar 2, 2023 · 40 TEMPERANCE ST
  • Building permit23 116533Closed

    Proposal for interior fit up, new ABM room and display area (unit 00-011)

    Mar 1, 2023 · 40 TEMPERANCE ST
  • Zoning review23 109339 LPRClosed
    Feb 1, 2023 · 40 TEMPERANCE ST
  • Building permit22 216158Closed

    FS - Sprinkler Shop Drawing - New office interior alteration to Level 18 of an existing building. Partial demolition/construction of existing base building ceilings. New partitions.

    Jan 10, 2023 · 40 TEMPERANCE ST
  • Building permit21 207447Closed

    Revision 01: Revision to drawing 4A8.050Proposal for interior alterations to floor levels 10, 11 & 12 of an existing office building - Bay Adelaide Center - North Tower - 'ScotiaBank North'.

    Nov 24, 2022 · 40 TEMPERANCE ST
  • Building permit22 206745Closed

    Proposal to install maglocks in existing office space on floors 28, 29, 30, 31, and 32 (15 Total)

    Oct 7, 2022 · 40 TEMPERANCE ST
  • Building permit22 147928Closed

    REV #1-REVISE SPRINKLER, FIRE HOSE FLOORS 29-32Proposal for interior alterations for a new single office tenant, subdivided across vacant shell floor levels 28, 29, 30, 31 & 32. [Bay Adelaide Centre - North Tower]

    Sep 9, 2022 · 40 TEMPERANCE ST
  • Building permit21 204288Closed

    Revision to level 7 washroom 764 Revision 01 - Door changes on the 7th floor level.Proposal for interior alterations to levels 6, 7 & 8 of an existing office building - Bay Adelaide Center - North Tower - 'ScotiaBank North'

    Aug 26, 2022 · 40 TEMPERANCE ST
  • Building permit22 157681Approved

    Proposed Alternative Solution to use Ipe Wood on exterior walls of the small enclosures on the terrace, privacy screens, and benches on the level 10 terrace that forms part of the Scotiabank office tenant suite. Associated with parent folder 21-207447 BLD 00 BA.

    Jun 6, 2022 · 40 TEMPERANCE ST
  • Building permit22 118327Closed

    Revision 01. ADDING 3 MAGLOCKS AND DELETING ONE - 1 MAGLOCK 20TH FLR. SERVICE ELEVATOR - 2 MAGLOCKS ON 21ST FLOOR- SERVICE ELEVATOR AND NORTH WEST CORRIDOR DOOR. DELETE 1 MAGLOCK 22ND EAST ENTRACE LOBBY DOOR. Proposed addition of eight (8) maglocks to the lobby and corridor doors on the 20th, 21st, & 22nd floors.

    May 3, 2022 · 40 TEMPERANCE ST
  • Building permit22 123106Closed

    Add and relocate sprinklers, fire hose valves and fire extinguishers on floor 9 & 14 to suit tenant fit-out. Reference building permit 21 233523

    Apr 13, 2022 · 40 TEMPERANCE ST
  • Building permit22 120311Closed

    Sprinkler and standpipe renovation for food court/concourse area. Reference permit 18-264306 BA

    Apr 11, 2022 · 40 TEMPERANCE ST
  • Building permit22 109625Permit Issued

    Plumbing standalone

    Mar 25, 2022 · 40 TEMPERANCE ST
  • Building permit22 107761Closed

    Proposed conversion of existing wet sprinkler system to a new pre-action system, add a new Novec 1230 system at level 3

    Mar 15, 2022 · 40 TEMPERANCE ST
  • Building permit22 109606Permit Issued

    Mechancial (hvac) standalone

    Mar 9, 2022 · 40 TEMPERANCE ST
  • Building permit22 107935Closed

    Add and relocate sprinklers, fire hose valves and fire extinguishers on floors 6 to 8 to suit tenant fit-out

    Mar 8, 2022 · 40 TEMPERANCE ST
  • Building permit22 102786Closed

    Add and relocate sprinklers and fire valve cabinets (2 added on floor 3) to suit tenant fit-out. Reference building permit 21-213020

    Feb 17, 2022 · 40 TEMPERANCE ST
  • Building permit21 248225Closed

    Interior alteration of 20th, 21st & 22nd floor for new office tenant with selective demolition for 2 slab opening for interconnecting communication stairs.

    Feb 8, 2022 · 40 TEMPERANCE ST
  • Building permit22 104302Closed

    To erect and display two illuminated wall.***SCOTIA BANK***

    Jan 31, 2022 · 40 TEMPERANCE ST
  • Building permit21 185021Closed

    REVISION - add and relocate sprinklers and fire hose valves to suit tenant fit-outProposal for interior alterations to existing office building floors 4. 5

    Jan 21, 2022 · 40 TEMPERANCE ST
  • Building permit21 232361Closed

    Proposal for interior alterations for office on 18 floor

    Jan 6, 2022 · 40 TEMPERANCE ST
  • Building permit21 233523Closed

    Interior alterations to levels 9 and 14 of existing building. - ceilings and new partitions.

    Dec 16, 2021 · 40 TEMPERANCE ST
  • Building permit21 213020Closed

    Proposal for interior alterations to floor levels 2 & 3 of an existing office building - Bay Adelaide Center, North Tower - 'ScotiaBank North'. Existing reception / lobby located on the 2nd floor level.

    Nov 18, 2021 · 40 TEMPERANCE ST
  • Building permit21 215173Approved

    Proposal to install Automatic Systems SlimLane 950 optical portals (i.e. automatic turnstiles) located at Level 2 of the Scotiabank offices in the Bay Adelaide Centre North Tower

    Sep 20, 2021 · 40 TEMPERANCE ST
  • Building permit21 215108Approved

    The purpose of this Alternative Solution is to demonstrate that the Boon Edam Speedlane Swing GEN 1 opticalturnstiles (also known as automatic turnstiles) in the ground floor elevator lobbies within the Bay Adelaide Centrenorth tower comply with the performance criteria of the 2012 Ontario Building Code (OBC).

    Sep 20, 2021 · 40 TEMPERANCE ST
  • Building permit21 207455Approved

    Proposal for the use of an oversized side coiling steel fire door (i.e. fire shutter) to be located at the perimeter of a floor opening on Level 11, to maintain the floor-to-floor fire separation continuity

    Sep 1, 2021 · 40 TEMPERANCE ST
  • Building permit21 203684Closed

    Proposal to install 4 maglocks for exisintg office building 2nd floor

    Aug 27, 2021 · 40 TEMPERANCE ST
  • Building permit20 154805Approved

    Grease interceptor tank.This AS application is under the general building permit # 18 264 306 BLD 00 BA.

    Jun 10, 2020 · 40 TEMPERANCE ST
  • Building permit20 145303Approved

    Proposed alternative solution for a closely spaced sprinkler and smoke detector in with a noncombustible draft stop header above unrated doors in a max 20 m. sq. vertical opening in the 2 h fire separation on the second floor will achieve the level of performance required by the applicable acceptable solution with respect to OBC 3.2.8.2.(5).

    May 14, 2020 · 40 TEMPERANCE ST
  • Building permit20 122712Approved

    Alternative solution to permit the use of a 65mm standpipe hose valve in exit stairs in lieu of fire hose cabinets containing 65mm and 38mm hose valves.

    Mar 5, 2020 · 40 TEMPERANCE ST
  • Building permit18 238576Revision Issued

    Revision #01 - To construct a new corridor for egrees and life-safety upgrades to layout. Partial demolition of existing underground structure elements and demolition of superstructure elements to allow for new construction.

    Jun 13, 2019 · 40 TEMPERANCE ST
  • Building permit19 138450Closed

    Proposed construction of a new exterior egress stair in connection between the two buildings 40 Temperance St and 357 Bay St. ( See permit 18-256994-01 for 357 Bay Street ).

    May 28, 2019 · 40 TEMPERANCE ST
  • Zoning review19 142596 LTOClosed
    Apr 19, 2019 · 37 RICHMOND ST W
  • Building permit18 264306Cancelled

    Conditional Permit - Part Permit - Proposal to construct a new 32 storey mixed use building with existing 5 level below grade structure, finished and shell Office space, and shell Retail space. "Bay Adelaide Centre - North Tower"

    Apr 5, 2019 · 40 TEMPERANCE ST
  • Zoning review12 217130 PSPClosed
    Jun 18, 2018 · 40 TEMPERANCE ST
  • Minor varianceA0189/14TEYApproved

    To alter the redevelopment plan for a 32-storey mixed-use office building with retail at grade, approved under By-law 998-88 and further amended by By-law 460-2006, by decreasing the number of loading spaces, as well as street related retail and service uses aggregate areas along Temperance Street and Richmond Street West, while increasing the non-residential and residential gross floor areas of the Bay-Adelaide lands, and the building heights for Parcel B as outline on Map B in By-law 460-2006.

    Sep 3, 2014 · 40 TEMPERANCE ST
  • Zoning review12 210527 ZPRClosed
    Jul 12, 2012 · 40 TEMPERANCE ST
  • Zoning review12 210525 000Cancelled
    Jul 12, 2012 · 40 TEMPERANCE ST
  • Building permit08 225500Closed

    Proposal to erect temp site office for the Bay Adelaide Centreat street level.

    Dec 9, 2008 · 40 TEMPERANCE ST
  • Building permit08 200776Closed

    Permit for certified tent on Temperance Street in front of the Bay Adelaide Centre Construction Office - In Association with the Bay Adelaide Centre 'Final Beam' Party,

    Sep 10, 2008 · 40 TEMPERANCE ST
  • Consent (lot split)B0009/04TEYApproved

    The applicant is seeking the consent of the Committee of Adjustment to create an easement over the subject property in favour of the adjacent lands to the west known municipally as No. 353 (357 & 359) Bay Street for the purpose of a fire exit . The proposed easement is identified as Part 1 on a draft reference plan of survey at the Office of the Committee of Adjustment.

    Mar 3, 2004 · 40 TEMPERANCE ST
  • Building permit02 148554Cancellednew building

    Transfer building permit 419323 to present system to build 11 storey office & commercial building (north tower). "historical"

    Jun 20, 2002 · 40 TEMPERANCE ST
  • Building permit98 023718Cancelled

    ALTER PLANS 314500 BY REDUCING PREVIOUSLY APPROVED 12-STOREY OFFICE BUILDING TO 11 STORIES FOR NORTH TOWER. ALSO SEE 294821 FOR FEES AND ALSO SEE 312705. SEE COMMITTEE OF ADJUSTMENTS DECISION. HOLD FOR FINAL AND BINDING. EDC/WS

    Dec 23, 1999 · 40 TEMPERANCE ST
  • Building permit89 023687Cancelled

    ERECT 12 STOREY OFFICE BUILDING SEE 312705 FOR 57 STOREY PORTION SEE 314500 FOR NORTH TOWER

    Jul 30, 1991 · 40 TEMPERANCE ST
  • Building permit90 025541Cancelled

    BUILD SUPERSTRUCTURE FOR NORTH TOWER FROM GRADE TO ROOF. COST INCL. 294821(B)---16 ADELAIDE ST W. LP 'APPLICATION & PLANS TAKEN TO TEAM BY APPLICANT'

    Nov 29, 1990 · 40 TEMPERANCE ST
  • Building permit90 019670Cancelled

    CONSTRUCT PEDESTRIAN TUNNEL CONNECTING BAY-ADELAIDE CENTRE WITH SIMPSONS BUILDING; ALSO CONSTRUCT SERVICE TUNNEL BETWEEN SIMPSON AND BAY-ADELAIDE CENTRE. JG

    Jul 27, 1990 · 40 TEMPERANCE ST

Check before you build

  • Zoning not in By-law 569-2013

    Needs a closer look

    This lot is not covered by the citywide zoning by-law's map. It is probably still governed by a former municipal by-law, which this tool does not read yet.

    Zoning By-law 569-2013

Lot facts

Area
3,513 m²
Frontage
67.9 m
Depth
53.5 m
Street
Temperance St
Corner lot
No
Public lane
None
House footprint
2,554 m²
Back yard
0 mhouse to rear lot line
Side yards
0.1 m and 20 mhouse to side lot lines; 0 is a shared wall
Buildings on the lot
6house, garage, sheds
Max height
—
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

    Around this lot

    Minor variances approved
    100%11 of 11 decisions
    Garden suite permits
    0
    Laneway suite permits
    0
    Multiplex permits
    0
    Development applications
    9

    Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 11 variance decisions: no more than at most Toronto houses (median 19).

    Recent variance decisions in the same zone

    • Minor varianceApproved

      To alter the existing 26-storey non-residential building (office use) by constructing a one-storey ground floor addition (patio enclosure for an eating establishment), along the east side of the building.

      121 KING ST W · Jul 8, 2026 · 432 m away
    • Minor varianceApproved

      To alter the existing 12-storey mixed-use building by enclosing the front outdoor patio of the ground floor eating establishment (restaurant).

      20 KING ST W · Jun 17, 2026 · 221 m away
    • Minor varianceApproved

      To alter the existing public hospital (St. Michael's Hospital, bounded by Shuter Street, Bond Street, Queen Street East, and Victoria Street) by installing an air handling unit (AHU) on a portion of the roof (Donnelly Wing).

      30 BOND ST · Jan 21, 2026 · 359 m away
    • Minor varianceApproved

      To alter the existing 17-storey mixed-use building by constructing a side (east) one-storey addition (patio enclosure for the existing outdoor dining area of Local Public Eatery), abutting Adelaide Street West, and York Street.

      141 ADELAIDE ST W · Jan 14, 2026 · 403 m away
    • Minor varianceApproved

      To alter the existing 27-storey mixed-use building by reconstructing the commercial space on the ground floor to accommodate a larger frontage along University Avenue for the financial institution use (Scotiabank), and to accommodate a second eating establishment use (fronting King Street West). The total gross floor area of the financial institution use will be maintained (modifying the layout of the frontage to University Avenue and King Street West). The existing commercial office space (fronting University Avenue) will be removed.

      145 KING ST W · Feb 12, 2025 · 494 m away

    Latest activity nearby

    • Building permit

      Modification of the existing sprinkler system for a new tenant layout (Cubecom) on the 6th floor. Related Permit no. 26 223212 BLD 00 BA

      4 KING ST W · Nov 23, 2026 · 253 m away
    • Building permit

      Interior alterations to unit 500

      111 RICHMOND ST W · Nov 23, 2026 · 291 m away
    • Building permit

      Revision 01 - Relocate 2 smoke detectors at the interior staircase.---------------------------------------------------------------Proposal to extend existing interconnected stair between 55th and 56th floor to 57th floor

      40 KING ST W · Nov 23, 2026 · 188 m away
    • Building permit

      Proposed interior fit-out for new tenant 'SMART & BIGGAR'.

      40 KING ST W · Nov 20, 2026 · 188 m away
    • Building permit

      Proposed interior alterations Building, plumbing and HVAC work to tenant space.

      151 YONGE ST · Nov 20, 2026 · 156 m away
    • Building permit

      Revision No.1: New Fire Shutter Window

      30 ADELAIDE ST E · Nov 20, 2026 · 281 m away
    • Building permit

      PROPOSED INTERIOR ALTERATION TO EXISTING GROUP D OCCUPANCY FOR KALOS LLP. INCLUDING BUILDING,MECHANICAL, PLUMBING AND MAGLOCK PERMITS.

      40 KING ST W · Nov 18, 2026 · 188 m away
    • Building permit

      PROPOSED INTERIOR ALTERATION TO EXISTING GROUP D OCCUPANCY FOR KALOS LLP. INCLUDING BUILDING,MECHANICAL, PLUMBING.

      40 KING ST W · Nov 18, 2026 · 188 m away
    • Building permit

      Installation of 2 Double (9th Floor) and 3 Double (10th Floor) Electromagnetic locks using a power supply system

      1 ADELAIDE ST E · Nov 18, 2026 · 203 m away
    • Building permit

      Proposed interior alterations for washroom and elevator lobby finish upgrades.

      4 KING ST W · Nov 18, 2026 · 253 m away

    Neighbourhood: Yonge-Bay Corridor

    About the area around the lot, not the lot itself.

    Nearest station
    Queen Station3 min walk
    Nearest TTC stop
    Richmond St West at Yonge St - Queen Station2 min walk
    Nearest cycling route
    Richmond St WCycle Track, 1 min walk
    Nearest traffic count
    22,887 vehicles in 14 hBay St / Richmond St W, 80 m away, Jul 3, 2025
    Serious collisions within 500 m
    132021–2026, killed or seriously injured: 2 fatal, 6 with pedestrians, 2 with cyclists
    Parks
    Cloud Gardens1 min walk
    Trinity Square6 min walk
    Courthouse Square Park6 min walk

    Schools within 1 km

    • VICTORIA STREET LINC English Public 4 min walk
    • KEYSTONE INTERNATIONAL SCHOOLS Private 6 min walk
    • ST MICHAEL'S CHOIR SCHOOL - GYMNASIUM BLDG English Separate 7 min walk
    • ST MICHAEL'S CHOIR SCHOOL - CHORAL BLDG English Separate 8 min walk
    • ST MICHAEL'S CHOIR SCHOOL - ELEMENTARY English Separate 9 min walk
    • ST MICHAEL'S CHOIR SCHOOL - SECONDARY English Separate 9 min walk

    Being near a school does not mean the lot is in its catchment; check with the board.

    2021 Census

    FigureYonge-Bay CorridorMedian neighbourhood
    Median household income (2020)$68,500$84,500
    Households that own their home32%54%
    Population (2021)12,64516,813
    Homes built in 1960 or before2%29%
    Homes needing major repairs2%7%

    Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

    Police-reported crime, 2025

    Per 100,000 peopleYonge-Bay CorridorCity median
    Assault3361.1636.3
    Robbery300.169.5
    Homicide125.3
    Shootings1210.5
    Auto theft162.1192.6
    Theft over $5,000210.146.1
    Break and enter552.2172.8
    Theft from vehicles402.1188.1

    Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

    Something here not right?

    Sources

    • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
    • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
    • Development applications: Rezoning, site plan, subdivision and condominium applications.
    • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
    • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
    • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
    • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
    • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
    • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
    • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
    • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
    • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
    • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
    • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
    • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
    • Address points: loaded Nov 22, 2026, published Nov 20, 2026
    • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
    • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
    • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
    • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
    • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
    • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
    • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
    • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
    • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
    • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
    • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
    • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
    • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
    • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
    • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
    • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
    • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
    • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
    • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
    • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
    • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
    • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
    • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
    • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
    • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
    • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
    • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
    • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
    • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
    • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
    • School locations: loaded Oct 14, 2026, published May 27, 2026
    • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
    • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
    • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
    • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
    • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
    • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
    • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
    • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
    • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

    Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

    Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

    Flag an error

    What is not right?

    The problem

    The records come from the City's open data; we check each flag against them. Your email is used only to answer this.