HousePrecheckCheck an address

40 St Patrick StToronto · zoning, lot size and permit records

Also 38 St Patrick St

Commercial residential · CR 4.0 (c2.0; r3.5) SS1 (x2374)19.2 × 37.5 m696 m²on St Patrick St

Not a home

A commercial or mixed-use building

Its main building is large, in a commercial zone: shops, offices or a mixed-use building rather than one house. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Shops, offices or a mixed buildingCustomers, deliveries and evening activity; errands within a short walk.
  • 11 development applications open within 300 m, up to 71 storeysNew buildings may go up around here in the next years. More change nearby than at 99% of Toronto houses.
  • Major Transit Station Area: St PatrickThe City plans more homes around the station: good for transit, and more building over time.
N10 m
19.2 m frontage37.5 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • 11 development applications open within 300 m

    Good to know

    11 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 71 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

4 records on file: more than at 88% of Toronto houses (median 0).

  • By-law investigation26 166059 GRA 00 IVClosed

    Notice Issued Graffiti

    May 16, 2026 · 40 ST PATRICK ST
  • By-law investigation26 161754 GRA 00 IRClosed

    Graffiti

    May 16, 2026 · 40 ST PATRICK ST
  • Building permit96 018301Closed

    ALTER DUCTWORK TO EXISTING H.V.A.C. SYSTEM. NEW ROOF TOP UNIT AND KITCHEN EXHAUST SYSTEM FOR 'HING-SING'TAO'TAK' TEMPLE

    Jul 15, 1996 · 40 ST PATRICK ST
  • Building permit96 014216Closed

    MAKE ALTERATIONS TO GROUND AND SECOND FLOORS FOR PLACE OF WORSHIP PURPOSES SS

    Apr 23, 1996 · 40 ST PATRICK ST

Check before you build

  • Site-specific exception 900.11.10(2374)

    Needs a closer look

    1 site-specific rule and 1 older by-law that still prevails apply to this lot. They can override the standard rules on this page. 2 parts are limited to an area drawn on a by-law diagram; check whether this lot is in it.

    Zoning By-law 569-2013, Chapter 900
Exception 900.11.10(2374)Applies

These parts of the exception apply to this lot's address.

  1. Rule A

    These premises must comply with Exception 900 11.10(2). Prevailing By-laws and Prevailing Sections: (A) Section 12(2) 132 of former City of Toronto By-law 438-86

  2. Rule D · diagram area

    On 54 1/2 St. Patrick St., former City of Toronto by-laws 267-73 and 531-80

  3. Older by-law A

    These premises must comply with Exception 900 11.10(2). Prevailing By-laws and Prevailing Sections: (A) Section 12(2) 132 of former City of Toronto By-law 438-86

  4. Older by-law D · diagram area

    On 54 1/2 St. Patrick St., former City of Toronto by-laws 267-73 and 531-80

14 parts for other addresses
  • B On the odd numbered addresses of 49-49A McCaul St., 51 McCaul St., former City of Toronto by-laws 267-73, 531-80, 551-80, 94-0534 and 97-0601
  • C On 30 St. Patrick St., former City of Toronto by-law 761-86
  • E On 96 St. Patrick St., City of Toronto by-law 151-02
  • F On 126 St. Patrick St., former City of Toronto by-laws 267-73 and 531-80
  • G On 180, 190 and 206 Simcoe St., former City of Toronto by-law 97-0599,
  • H On 220 Simcoe Street, Section 11(1) of former City of Toronto By-law 438-86.
  • I On 248 Simcoe St., former City of Toronto by-law 171-88.
  • B On the odd numbered addresses of 49-49A McCaul St., 51 McCaul St., former City of Toronto by-laws 267-73, 531-80, 551-80, 94-0534 and 97-0601
  • C On 30 St. Patrick St., former City of Toronto by-law 761-86
  • E On 96 St. Patrick St., City of Toronto by-law 151-02
  • F On 126 St. Patrick St., former City of Toronto by-laws 267-73 and 531-80
  • G On 180, 190 and 206 Simcoe St., former City of Toronto by-law 97-0599,
  • H On 220 Simcoe Street, Section 11(1) of former City of Toronto By-law 438-86.
  • I On 248 Simcoe St., former City of Toronto by-law 171-88.
By-law 569-2013, Chapter 900

Lot facts

Area
696 m²
Frontage
19.2 m
Depth
37.5 m
Street
St Patrick St
Corner lot
No
Public lane
None
House footprint
642 m²roof up to 40.4 m
Back yard
1.1 mhouse to rear lot line
Side yards
0 m and 0.1 mhouse to side lot lines; 0 is a shared wall
Buildings on the lot
3house, garage, sheds
Max height
37 m
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • Major Transit Station Area: St Patrick. The lot is inside the St Patrick Major Transit Station Area approved by the Province (Site and Area Specific Policy 610). Source
  • Downtown Plan Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
  • Downtown building setback overlay. Towers over 36 m here need extra setbacks above 24 m and 25 m between towers. Houses and other low buildings are not affected. Source
  • Zone CR 4.0 (c2.0; r3.5) SS1 (x2374) (Commercial Residential). Chapter 40, section 40.10 of the by-law. Source
  • 2 City trees in front of this lot. The City's street tree inventory lists 2 trees at this address: honey locust (22 cm), honey locust (8 cm). Diameter is the trunk at breast height. Source

Around this lot

Minor variances approved
100%9 of 9 decisions
Garden suite permits
0
Laneway suite permits
2
Multiplex permits
0
Development applications
21

Within 300 m, last 10 years. 2 suite and multiplex permits: no more than at most Toronto houses (median 3). 9 variance decisions: no more than at most Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To alter the existing three-storey non-residential building by converting the vacant second and third levels into a place of amusement (escape room). The existing restaurant use (café) and retail use, on the ground level, will be maintained and unaltered.

    333 QUEEN ST W · Apr 1, 2026 · 304 m away
  • Minor varianceApproved

    To alter the parking length standard for one residential parking space (Unit 11) on Parking Level 1 of the 32-storey mixed-use building, containing three levels of below grade parking.

    292 DUNDAS ST W · Mar 4, 2026 · 359 m away
  • Minor varianceApproved

    To convert the existing three-storey semi-detached mixed-use building (residential and office uses) into a hotel use containing 22 rooms. The existing basement and ground floor restaurant will be maintained and unaltered.

    298 QUEEN ST W · Feb 18, 2026 · 375 m away
  • Minor varianceApproved

    To alter the development standards (as approved under Site Specific Zoning By-law 105-2022 (OLT)) for a 47-storey mixed-use building (containing 432 residential dwelling units, retail use on the ground level, and office use on second, third and fourth levels), by reducing the required number of vehicular parking spaces for the residents of this building.

    263 ADELAIDE ST W · Jan 28, 2026 · 416 m away
  • Minor varianceApproved

    To alter the existing 17-storey mixed-use building by constructing a side (east) one-storey addition (patio enclosure for the existing outdoor dining area of Local Public Eatery), abutting Adelaide Street West, and York Street.

    141 ADELAIDE ST W · Jan 14, 2026 · 494 m away

Latest activity nearby

  • Consent (lot split)Pending

    To obtain consent to sever a portion of land for the purpose of a lot addition, and to create and maintain easements/rights-of-way.

    100 MCCAUL ST · Dec 16, 2026 · 220 m away
  • Zoning review

    Closed

    84 ST PATRICK ST · Nov 24, 2026 · 115 m away
  • Minor variancePending

    In Process

    165 JOHN ST · Nov 24, 2026 · 171 m away
  • Building permit

    Interior Alteration of Existing Group D office- reconfigure existing office spaces, including dividing one room into two meeting rooms and opening another room to create an open workspace - 2nd Floor

    190 SIMCOE ST · Nov 24, 2026 · 76 m away
  • Zoning review

    Closed

    136 SIMCOE ST · Nov 23, 2026 · 297 m away
  • Building permit

    Interior alteration to existing office space (Unit 2200)

    400 UNIVERSITY AVE · Nov 18, 2026 · 237 m away
  • Building permit

    Proposed interior alterations of existing office for new model suite fit-out - UNIT 403

    217 RICHMOND ST W · Nov 18, 2026 · 256 m away
  • Building permit

    Proposed interior alterations of existing office to new model suite fit-out.

    217 RICHMOND ST W · Nov 18, 2026 · 256 m away
  • Building permit

    Tenant improvement to existing office suite located on the 8th floor of 375 University Avenue. No changes of use or exterior work proposed. No change to existing demising walls of suite.

    375 UNIVERSITY AVE · Nov 17, 2026 · 296 m away
  • Building permit

    1 wall sign.***NAWABS LEGENDARY BBQ***

    228 QUEEN ST W · Nov 10, 2026 · 141 m away

Neighbourhood: Kensington-Chinatown

About the area around the lot, not the lot itself.

Nearest station
Osgoode Station4 min walk
Nearest TTC stop
Queen St West at St Patrick St2 min walk
Nearest cycling route
Stephanie StBike Lane - Contraflow, 3 min walk
Nearest traffic count
9,724 vehicles in 14 hQueen St W / St Patrick St, 140 m away, Sep 9, 2025
Serious collisions within 500 m
82021–2026, killed or seriously injured: 0 fatal, 5 with pedestrians, 2 with cyclists
Parks
St. Patricks Square2 min walk
Grange Park3 min walk
Gallery Park6 min walk

Schools within 1 km

  • OCAD UNIVERSITY - INCLUSIVE DESIGN INSTITUTE University 1 min walk
  • OCAD UNIVERSITY - STUDENT CENTRE University 1 min walk
  • OCAD UNIVERSITY - ABOVEGROUND ART SUPPLIES University 3 min walk
  • OCAD UNIVERSITY - MAIN BUILDING 416 977-6000 University 4 min walk
  • OCAD UNIVERSITY - THE LEARNING ZONE University 4 min walk
  • CONTACT ALTERNATIVE SCHOOL English Public 4 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureKensington-ChinatownMedian neighbourhood
Median household income (2020)$62,000$84,500
Households that own their home32%54%
Population (2021)18,12016,813
Homes built in 1960 or before26%29%
Homes needing major repairs8%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleKensington-ChinatownCity median
Assault2017.5636.3
Robbery19369.5
Shootings21.910.5
Auto theft118.4192.6
Theft over $5,000219.346.1
Break and enter443172.8
Theft from vehicles850.8188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
  • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.