Before you offer
From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.
TRCA regulated area (43% of lot)
Needs a closer lookPart of the lot is near a valley, floodplain, shoreline or wetland. Work there needs a TRCA permit and may be restricted.
What it means. Additions, pools and new buildings in the regulated part need a TRCA permit and may be refused. Ask your insurer about flood coverage.
How to confirm. A TRCA property inquiry letter says which policies apply ($385, at least two weeks). Details
Ontario Regulation 41/24, TRCA Regulation LimitRavine and natural feature protection (39% of lot)
Needs a closer lookPart of the lot is in the area covered by the City's Ravine and Natural Feature Protection By-law. The City's map of the area was last published in 2019.
What it means. In that part, injuring or removing a tree of any size, grading, filling or dumping needs a City permit. Plans for a pool, addition or garden suite there may be refused.
How to confirm. Urban Forestry confirms where the protected area runs and whether work needs a permit. Details
Toronto Municipal Code, Chapter 658Environmentally Significant Area: Centennial Park
Needs a closer lookThe lot touches an Environmentally Significant Area shown on Official Plan Map 12.
What it means. Development in or next to the area needs an impact study and may be limited.
How to confirm. City Planning confirms the policies that apply. Details
City of Toronto Official Plan, Map 12Building permit open since 2008
Needs a closer lookStill open in the City's records: 08 170252 (Site servicing for a future Place of Worship - "Kingdom Covenant Centre", 2008, status Inspection).
What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.
How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details
City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)Natural Heritage System (97% of lot)
Good to knowPart of the lot is in the Natural Heritage System shown on Official Plan Map 9.
What it means. New buildings or additions in that part need a natural heritage impact study.
How to confirm. City Planning confirms the policies that apply. Details
City of Toronto Official Plan, Map 9Work or applications in progress
Good to knowRecent records on this lot: 19 186166 WET 02 OZ (Rezoning application to allow the construction of five office and retail buildings rang..., 2019).
What it means. The owner has planned or started work. Ask what it covers, whether it will be finished before closing, and who pays for what is left.
How to confirm. Application details and decisions are in the City's Application Information Centre. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details
City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards); City of Toronto, Development Applications2 Committee of Adjustment files on this lot
Good to know0 approved. B73/13EYK (2013); B53/11EYK (2011).
What it means. Approved variances and consents stay with the property, including any conditions in the decision. They allow what was approved, not more.
How to confirm. Decisions are in the Application Information Centre; older files are available from the Committee of Adjustment office. Details
City of Toronto, Committee of Adjustment applications (2001 onwards)1 development application open within 300 m
Good to know1 rezoning, site plan, subdivision or condominium application within 300 m, submitted in the last 10 years, is not closed yet. They are listed under Around this lot.
What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.
How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details
City of Toronto, Development Applications
Not in these records
- Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
- Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.
History of this lot
9 records on file: more than at 99% of Toronto houses (median 0).
- Zoning review26 270548 ZAPNot StartedNov 16, 2026 · 40 RAKELY CRT
- Zoning review24 192598 ZAPClosedAug 2, 2024 · 40 RAKELY CRT
- Zoning review19 186166 PRZClosedFeb 4, 2021 · 40 RAKELY CRT
- Development application19 186166 WET 02 OZUnder Review
Rezoning application to allow the construction of five office and retail buildings ranging from six to nine storeys, with a shared two-level underground parking garage and new a public road.
Jul 10, 2019 · 40 RAKELY CRT · City file - Consent (lot split)B73/13EYKPendingNov 27, 2013 · 40 RAKELY CRT
- Consent (lot split)B53/11EYKPendingOct 7, 2011 · 40 RAKELY CRT
- Building permit08 170252Inspection
Site servicing for a future Place of Worship - "Kingdom Covenant Centre"
Jul 9, 2008 · 40 RAKELY CRT - Zoning review06 184583 PSPClosedOct 18, 2006 · 40 RAKELY CRT
Show 1 older records
- Zoning review06 101233 PSPClosedJan 9, 2006 · 40 RAKELY CRT
Check before you build
Zoning not in By-law 569-2013
Needs a closer lookThis lot is not covered by the citywide zoning by-law's map. It is probably still governed by a former municipal by-law, which this tool does not read yet.
Zoning By-law 569-2013
Lot facts
- Area
- 60,231 m²
- Frontage
- 231.7 mestimated, irregular lot
- Depth
- 335.8 mestimated, irregular lot
- Street
- Lone Oak Crt
- Corner lot
- Yes, also on Rakely Crt335.8 m along it
- Public lane
- None
- Max height
- —
- Max lot coverage
- —
Around this lot
- Minor variances approved
- —no decisions on file
- Garden suite permits
- 0
- Laneway suite permits
- 0
- Multiplex permits
- 0
- Development applications
- 1
Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 0 variance decisions: no more than at most Toronto houses (median 19).
Recent variance decisions in the same zone
- Minor varianceApproved
To construct a one-storey truck bay addition along the south west corner of the building and to extend the existing truck receiving bay area.
25 RAKELY CRT · Jul 31, 2014 · 223 m away
Latest activity nearby
- Zoning review
Not Started
40 RAKELY CRT · Nov 16, 2026 · 15 m away - Building permit
Installation of 48" thick concrete pad for added milk tank. No changes required structurally to main building under this application.
25 RAKELY CRT · Nov 4, 2026 · 223 m away - Zoning review
Notice Sent
25 RAKELY CRT · Aug 21, 2026 · 223 m away - Zoning review
Closed
40 RAKELY CRT · Aug 2, 2024 · 15 m away - Building permit
Fire alarm panel replacement
25 RAKELY CRT · Mar 3, 2023 · 223 m away - Building permit
Proposal to erect and display one non-illuminated wall sign displaying static copy erected at first storey of southwest elevation of the building at above noted premises.Dimensions:1.22m L x 4.57m W x 0.06m(?) D at a height of 8.26m.***LACTALIS CANADA***
25 RAKELY CRT · Oct 19, 2022 · 223 m away - Zoning review
Closed
25 RAKELY CRT · Mar 24, 2022 · 223 m away - Zoning review
Closed
40 RAKELY CRT · Feb 4, 2021 · 15 m away - Building permit
Proposal for the replacement of the 4" water main with a 6" new PVC brute watermain.
25 RAKELY CRT · Nov 17, 2020 · 223 m away - Zoning review
Closed
25 RAKELY CRT · Apr 8, 2020 · 223 m away
Neighbourhood: Eringate-Centennial-West Deane
About the area around the lot, not the lot itself.
- Nearest cycling route
- Eglinton Ave W TrailMulti-Use Trail - Boulevard, 2 min walk
- Nearest traffic count
- 18,251 vehicles in 8 hEglinton Ave W / Rakely Crt, 200 m away, Dec 18, 2018
- Serious collisions within 500 m
- 02021–2026, killed or seriously injured
- Parks
- Centennial Park - Etobicoke2 min walk
2021 Census
| Figure | Eringate-Centennial-West Deane | Median neighbourhood |
|---|---|---|
| Median household income (2020) | $108,000 | $84,500 |
| Households that own their home | 84% | 54% |
| Population (2021) | 18,450 | 16,813 |
| Homes built in 1960 or before | 29% | 29% |
| Homes needing major repairs | 6% | 7% |
Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.
Police-reported crime, 2025
| Per 100,000 people | Eringate-Centennial-West Deane | City median |
|---|---|---|
| Assault | 393.3 | 636.3 |
| Robbery | 29.9 | 69.5 |
| Shootings | 10 | 10.5 |
| Auto theft | 234 | 192.6 |
| Theft over $5,000 | 24.9 | 46.1 |
| Break and enter | 109.5 | 172.8 |
| Theft from vehicles | 114.5 | 188.1 |
Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.