HousePrecheckCheck an address

40 Panorama CrtToronto · zoning, lot size and permit records

Residential apartment commercial · RAC (f24.0; au67.0) (x96)≈ 132.4 × 128.9 m11,298 m²on Panorama Crt

Not a single house

A condominium parcel

The City's property boundaries show this parcel as a condominium: the homes on it are units of a condominium corporation, which owns the land and common elements. Build options for a house do not apply; the corporation's status certificate is the document to read before an offer.

Looking at a house nearby? What this means for you

  • A condominium on 1.1 haIts owners share the land and decide together on changes; expect more cars and visitors than a house.
  • Permits or applications open on this parcelStill open in the City's records: 21 243356 (Proposal for localized concrete repairs to the underground parking garage of an existin..., 2022, status Permit Issued); 14 149614 (repalce fire alarm control panel for elevator upgrades, 2014, status Permit Issued); 12 241226 (Restoration and protection of existing builing exterior cladding, 2012, status Inspection). Larger work can mean noise and trucks next door; read what each one is for.
  • No development applications within 300 m in 10 yearsA quiet stretch for new building, by the City's records.
  • 2 open orders or by-law investigations at this buildingThe City is following up on complaints here, such as upkeep, heat or noise. Not resolved in the City's records: 26 231439 PRS 00 IV (Order Issued Property Standards: The property is not being kept free of pests.; Wall(s)..., 2026, status Order Issued); 26 133741 PRS 00 IR (Property Standards, 2026, status Order Issued).
  • Major Transit Station Area: Mount OliveThe City plans more homes around the station: good for transit, and more building over time.

Want to check this condo before you buy?

We are building checks for condominiums. Leave your email and we will tell you when it is ready.

N50 m
≈ 132.4 m frontage≈ 128.9 m deepirregular lot, estimated

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • TRCA regulated area (66% of lot)

    Needs a closer look

    Part of the lot is near a valley, floodplain, shoreline or wetland. Work there needs a TRCA permit and may be restricted.

    What it means. Additions, pools and new buildings in the regulated part need a TRCA permit and may be refused. Ask your insurer about flood coverage.

    How to confirm. A TRCA property inquiry letter says which policies apply ($385, at least two weeks). Details

    Ontario Regulation 41/24, TRCA Regulation Limit
  • Ravine and natural feature protection (60% of lot)

    Needs a closer look

    Part of the lot is in the area covered by the City's Ravine and Natural Feature Protection By-law. The City's map of the area was last published in 2019.

    What it means. In that part, injuring or removing a tree of any size, grading, filling or dumping needs a City permit. Plans for a pool, addition or garden suite there may be refused.

    How to confirm. Urban Forestry confirms where the protected area runs and whether work needs a permit. Details

    Toronto Municipal Code, Chapter 658
  • Environmentally Significant Area: Rowntree Mill Swamp

    Needs a closer look

    The lot touches an Environmentally Significant Area shown on Official Plan Map 12.

    What it means. Development in or next to the area needs an impact study and may be limited.

    How to confirm. City Planning confirms the policies that apply. Details

    City of Toronto Official Plan, Map 12
  • 2 open orders or by-law investigations

    Needs a closer look

    Not resolved in the City's records: 26 231439 PRS 00 IV (Order Issued Property Standards: The property is not being kept free of pests.; Wall(s)..., 2026, status Order Issued); 26 133741 PRS 00 IR (Property Standards, 2026, status Order Issued).

    What it means. An order is attached to the property, not to the seller. If it is not resolved before closing, the work, permits or fines it calls for can fall to you.

    How to confirm. Ask the seller how each order will be resolved and get it in writing. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations
  • 3 building permits open, the oldest since 2012

    Needs a closer look

    Still open in the City's records: 21 243356 (Proposal for localized concrete repairs to the underground parking garage of an existin..., 2022, status Permit Issued); 14 149614 (repalce fire alarm control panel for elevator upgrades, 2014, status Permit Issued); 12 241226 (Restoration and protection of existing builing exterior cladding, 2012, status Inspection).

    What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.

    How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)
  • Natural Heritage System (54% of lot)

    Good to know

    Part of the lot is in the Natural Heritage System shown on Official Plan Map 9.

    What it means. New buildings or additions in that part need a natural heritage impact study.

    How to confirm. City Planning confirms the policies that apply. Details

    City of Toronto Official Plan, Map 9
  • 2 by-law investigations closed in the last two years

    Good to know

    Closed files (Property Standards): 26 202395 PRS 00 IR (Property Standards, 2026); 25 115537 PRS 00 IR (Property Standards, 2025).

    What it means. Someone raised an issue here and the City closed the file. Ask the seller what it was about.

    City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

12 records on file: more than at 100% of Toronto houses (median 0).

  • By-law investigation26 202395 PRS 00 IRClosed

    Property Standards

    Jul 15, 2026 · 40 PANORAMA CRT
  • By-law investigation26 186533 LGW 00 IRClosed

    Long Grass and Weeds

    Jun 17, 2026 · 40 PANORAMA CRT
  • By-law investigation26 231439 PRS 00 IVOrder Issued

    Order Issued Property Standards: The property is not being kept free of pests.; Wall(s) not maintained free of holes, cracks, damaged and deteriorated materials.

    Mar 24, 2026 · 40 PANORAMA CRT
  • By-law investigation26 133741 PRS 00 IROrder Issued

    Property Standards

    Mar 24, 2026 · 40 PANORAMA CRT
  • By-law investigation25 115537 PRS 00 IRClosed

    Property Standards

    Feb 11, 2025 · 40 PANORAMA CRT
  • Building permit21 243356Permit Issued

    Proposal for localized concrete repairs to the underground parking garage of an existing apartment building

    Jan 17, 2022 · 40 PANORAMA CRT
  • Building permit15 132201Closed

    Repairs to garage roof slab, columns and joints of level P2 parking

    May 6, 2015 · 40 PANORAMA CRT
  • Building permit14 149614Permit Issued

    repalce fire alarm control panel for elevator upgrades

    Sep 18, 2014 · 40 PANORAMA CRT
Show 4 older records
  • Building permit13 180996Closed

    Balcony slab repair to16 storey apartment building.

    Jul 3, 2013 · 40 PANORAMA CRT
  • Building permit12 241226Inspection

    Restoration and protection of existing builing exterior cladding.

    Oct 3, 2012 · 40 PANORAMA CRT
  • Building permit12 144983Closed

    Proposal to reconstruct south part of P1 underground parking garage level.

    May 3, 2012 · 40 PANORAMA CRT
  • Building permit02 103968Closed

    Underground Garage repairs to Apartment Building.

    Feb 11, 2002 · 40 PANORAMA CRT

Check before you build

  • Site-specific exception 900.8.10(96)

    Needs a closer look

    1 older by-law that still prevails applies to this lot. It can override the standard rules on this page.

    Zoning By-law 569-2013, Chapter 900
Exception 900.8.10(96)Applies

These parts of the exception apply to this lot's address.

  1. Older by-law A

    Former City of Etobicoke By-law Nos. 1766 and 1805.

By-law 569-2013, Chapter 900

Lot facts

Area
11,298 m²
Frontage
132.4 mestimated, irregular lot
Depth
128.9 mestimated, irregular lot
Street
Panorama Crt
Corner lot
No
Public lane
None
Max height
—
Max lot coverage
20%
  • Major Transit Station Area: Mount Olive. The lot is inside the Mount Olive Major Transit Station Area approved by the Province (Site and Area Specific Policy 705). Source
  • Minimum frontage 24 m. Frontage is about 132.4 m (estimated, irregular lot): meets the zone minimum. Source
  • Zone RAC (f24.0; au67.0) (x96) (Residential Apartment Commercial). Chapter 15, section 15.20 of the by-law. Source
  • 2 City trees in front of this lot. The City's street tree inventory lists 2 trees at this address: honey locust skyline (36 cm), honey locust (19 cm). Diameter is the trunk at breast height. Source

Around this lot

Minor variances approved
100%1 of 1 decisions
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
0
Development applications
0

Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 1 variance decisions: no more than at most Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To convert the existing storage space into seven new dwelling units. A total of 235 dwelling units will be provided as well as a new fitness room and multipurpose room.

    46 PANORAMA CRT · Nov 16, 2021 · 112 m away

Latest activity nearby

  • Building permit

    Proposed complete localized concrete repairs within the garbage room (estimated concrete repair area = 10.5m2). Replace stairwell guards and handrails.

    50 PANORAMA CRT · May 22, 2026 · 200 m away
  • Building permit

    Repairs of Underground Parking Garage and Installation of new Pedestrian-used Barrier-Free Accessible ramps at P1 & P2 Parking level.

    18 PANORAMA CRT · Jul 2, 2025 · 188 m away
  • Building permit

    Replace sprinkler system on p1 and p2

    50 PANORAMA CRT · Mar 31, 2025 · 200 m away
  • Building permitdemolition

    Building #15 - Proposal for Demolition of nineteen buildings, including ten residence structures and nine institutional buildings, at the former Thistletown Regional Centre. Demolition is intended to clear land - no development is proposed as part of this project.

    51 PANORAMA CRT · Mar 3, 2025 · 249 m away
  • Building permitdemolition

    Building #18 - Proposal for Demolition of nineteen buildings, including ten residence structures and nine institutional buildings, at the former Thistletown Regional Centre. Demolition is intended to clear land - no development is proposed as part of this project.

    51 PANORAMA CRT · Feb 28, 2025 · 249 m away
  • Building permitdemolition

    Building #17 - Proposal for Demolition of nineteen buildings, including ten residence structures and nine institutional buildings, at the former Thistletown Regional Centre. Demolition is intended to clear land - no development is proposed as part of this project.

    51 PANORAMA CRT · Feb 28, 2025 · 249 m away
  • Building permitdemolition

    Building #16 - Proposal for Demolition of nineteen buildings, including ten residence structures and nine institutional buildings, at the former Thistletown Regional Centre. Demolition is intended to clear land - no development is proposed as part of this project.

    51 PANORAMA CRT · Feb 28, 2025 · 249 m away
  • Building permitdemolition

    Building #7 - Proposal for Demolition of nineteen buildings, including ten residence structures and nine institutional buildings, at the former Thistletown Regional Centre. Demolition is intended to clear land - no development is proposed as part of this project.

    51 PANORAMA CRT · Feb 28, 2025 · 249 m away
  • Building permitdemolition

    Building #11 - Proposal for Demolition of nineteen buildings, including ten residence structures and nine institutional buildings, at the former Thistletown Regional Centre. Demolition is intended to clear land - no development is proposed as part of this project.

    51 PANORAMA CRT · Feb 27, 2025 · 249 m away
  • Building permitdemolition

    Building #8 - Proposal for Demolition of nineteen buildings, including ten residence structures and nine institutional buildings, at the former Thistletown Regional Centre. Demolition is intended to clear land - no development is proposed as part of this project.

    51 PANORAMA CRT · Feb 27, 2025 · 249 m away

Neighbourhood: Mount Olive-Silverstone-Jamestown

About the area around the lot, not the lot itself.

Nearest station
Mount Olive Station9 min walk
Nearest TTC stop
Kipling Ave at Panorama Crt5 min walk
Nearest cycling route
Humber River Recreational TrlMulti-Use Trail, 4 min walk
Nearest traffic count
19,781 vehicles in 14 hKipling Ave / Mount Olive Dr / Panorama Crt / Kipling Ave Bicycle Trl, 340 m away, Jun 2, 2026
Serious collisions within 500 m
12021–2026, killed or seriously injured: 0 fatal, 1 with pedestrians, 0 with cyclists
Parks
Rowntree Mills Park1 min walk
Humberview Park1 min walk
Panorama Park1 min walk

Schools within 1 km

  • ST ANDREW CATHOLIC ELEMENTARY SCHOOL English Separate 6 min walk
  • NORTH ALBION COLLEGIATE INSTITUTE English Public 7 min walk
  • NORTH KIPLING JR MDL SCHOOL English Public 10 min walk
  • BEAUMONDE HEIGHTS JR MDL SCHOOL English Public 12 min walk
  • ALBION LINC English Public 13 min walk
  • HIGHFIELD JR SCHOOL English Public 13 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureMount Olive-Silverstone-JamestownMedian neighbourhood
Median household income (2020)$76,500$84,500
Households that own their home46%54%
Population (2021)31,34516,813
Homes built in 1960 or before14%29%
Homes needing major repairs11%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleMount Olive-Silverstone-JamestownCity median
Assault788.6636.3
Robbery107.369.5
Homicide2.95.3
Shootings20.310.5
Auto theft275.4192.6
Theft over $5,00026.146.1
Break and enter55.1172.8
Theft from vehicles130.5188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 28, 2026, published Nov 28, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 28, 2026, published Nov 27, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 28, 2026, published Nov 27, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 28, 2026, published Nov 27, 2026
  • Multi-tenant house licences: loaded Nov 28, 2026, published Nov 27, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 28, 2026, published Nov 27, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.