HousePrecheckCheck an address

40 Norfinch DrToronto · zoning, lot size and permit records

≈ 60.9 × 171.0 m8,091 m²on Norfinch Dr

Not a home

Police Station - Division 31

The City of Toronto's real estate inventory lists Police Station - Division 31 here, on City land in City use. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • An emergency stationSirens and vehicles leaving at any hour; help close by.
  • Permits or applications open on this parcelStill open in the City's records: 20 210207 (Proposal for complete accessibility upgrades, 2020, status Inspection); 17 228671 (Proposal for interior alterations to the front reception and waiting areas of existing..., 2017, status Inspection). Larger work can mean noise and trucks next door; read what each one is for.
N50 m
≈ 60.9 m frontage≈ 171.0 m deepirregular lot, estimated

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • 2 building permits open, the oldest since 2017

    Needs a closer look

    Still open in the City's records: 20 210207 (Proposal for complete accessibility upgrades, 2020, status Inspection); 17 228671 (Proposal for interior alterations to the front reception and waiting areas of existing..., 2017, status Inspection).

    What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.

    How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

5 records on file: more than at 93% of Toronto houses (median 0).

  • Building permit20 210207Inspection

    Proposal for complete accessibility upgrades.

    Dec 24, 2020 · 40 NORFINCH DR
  • Building permit17 267488Closed

    Relocate one maglock to the front door located on the ground floor

    Dec 29, 2017 · 40 NORFINCH DR
  • Building permit17 228671Inspection

    Proposal for interior alterations to the front reception and waiting areas of existing police station - Police Division 31.

    Oct 24, 2017 · 40 NORFINCH DR
  • Building permit15 258731Closed

    INSTALL 1 BACKFLOW PREVENTION DEVICE (WATER ONLY)

    Dec 8, 2015 · 40 NORFINCH DR
  • Building permit05 159805Closed

    Install one new maglock at the front entrance

    Aug 8, 2005 · 40 NORFINCH DR

Check before you build

  • Zoning not in By-law 569-2013

    Needs a closer look

    This lot is not covered by the citywide zoning by-law's map. It is probably still governed by a former municipal by-law, which this tool does not read yet.

    Zoning By-law 569-2013

Lot facts

Area
8,091 m²
Frontage
60.9 mestimated, irregular lot
Depth
171 mestimated, irregular lot
Street
Norfinch Dr
Corner lot
No
Public lane
None
House footprint
1,491 m²roof up to 11.2 m
Back yard
83 mhouse to rear lot line
Side yards
10.3 m and 16.8 mhouse to side lot lines
Buildings on the lot
1house, garage, sheds
Max height
—
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

    Around this lot

    Minor variances approved
    100%1 of 1 decisions
    Garden suite permits
    0
    Laneway suite permits
    0
    Multiplex permits
    0
    Development applications
    2

    Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 1 variance decisions: no more than at most Toronto houses (median 19).

    Recent variance decisions in the same zone

    • Minor varianceApproved

      To permit a day nursery on the first floor of the existing building.

      2115 FINCH AVE W · Mar 12, 2026 · 263 m away
    • Minor varianceApproved

      To construct a detached garage in the rear yard.

      74 WHEATSHEAF CRES · Oct 24, 2024 · 495 m away
    • Minor varianceApproved

      This is an application under Section 45 of the Planning Act, for variance from the provisions of the North York Zoning By-law 7625, as amended, to permit the temporary use of a propane storage tank to be located on the subject property. This application was heard on June 20,2007 and was deferred sine die in order to allow the applicant an opportunity to address the concerns of the residents in consultation with the Ward Councillor.

      75 NORFINCH DR · Jan 30, 2008 · 348 m away
    • Minor varianceApproved

      This is an application under Section 45 of the Planning Act, for variance from the provisions of the North York Zoning By-law 7625, as amended, to permit the existing carport to be maintained as constructed.

      72 WHEATSHEAF CRES · Aug 1, 2007 · 493 m away

    Latest activity nearby

    • Building permit

      REV 01: Revision per drawingsProposed interior alterations for new daycare including new walls plumbing and HVAC

      2115 FINCH AVE W · Nov 19, 2026 · 263 m away
    • Minor varianceApproved

      To permit a day nursery on the first floor of the existing building.

      2115 FINCH AVE W · Mar 12, 2026 · 263 m away
    • Minor variancePending

      Cancelled

      2115 FINCH AVE W · Jan 13, 2026 · 263 m away
    • Building permit

      Proposal for renovation of the west half of the third floor of an existing five storey hospital to serve as a 12-bed Acute Behavioural Assessment and Management Unit (ABAMU). Each patient bedroom will include a private two-piece washroom. Patients will also have access to a shared common dining and activity room. The renovations include clean supply and soiled utility rooms, a team care station, nurse station, a medication room, and office spaces. Existing separate washrooms and a shower room are provided for staff use.

      2111 FINCH AVE W · Sep 16, 2025 · 280 m away
    • Building permit

      1 Wall Sign

      2111 FINCH AVE W · Oct 21, 2024 · 280 m away
    • Building permitdemolition

      Complete demolition of 196' stack at Humber River Health using High-Reach Excavator & Crane with Processor and aditional Crane for Debris Protection. Stack services to be capped and protection to be implemented for neighbouring building.

      2111 FINCH AVE W · Jul 24, 2024 · 280 m away
    • Zoning review

      Closed

      2111 FINCH AVE W · Jul 8, 2024 · 280 m away
    • Building permit

      Proposed installation of (2) double and (1) single electromagnetic locking device on the 3rd level.

      2111 FINCH AVE W · Mar 13, 2024 · 280 m away
    • Zoning review

      Closed

      2111 FINCH AVE W · Aug 23, 2023 · 280 m away
    • Consent (lot split)Approved

      To obtain consent to a lease for a term in excess of 21 years.

      2111 FINCH AVE W · Apr 13, 2023 · 280 m away

    Neighbourhood: Black Creek

    About the area around the lot, not the lot itself.

    Nearest station
    Norfinch Oakdale Station4 min walk
    Nearest TTC stop
    40 Norfinch Dr1 min walk
    Nearest cycling route
    Finch Corridor TrlMulti-Use Trail, 4 min walk
    Nearest traffic count
    40,527 vehicles in 14 hFinch Ave / Finch Ave W / Hwy 400 N Finch Ave Ramp / Hwy 400 N Ramp, 200 m away, Nov 8, 2025
    Serious collisions within 500 m
    22021–2026, killed or seriously injured: 0 fatal, 1 with pedestrians, 0 with cyclists
    Parks
    Remberto Navia Sport Fields2 min walk
    Firgrove Park12 min walk
    Hullmar Park13 min walk

    Schools within 1 km

    • MONSIGNOR FRASER COLLEGE - NORFINCH CAMPUS English Separate 2 min walk
    • WESTVIEW CENTENNIAL HIGH SCHOOL English Public 8 min walk
    • SENECA COLLEGE (YORKGATE CAMPUS) College 11 min walk
    • ST FRANCIS DE SALES CATHOLIC ELEMENTARY SCHOOL English Separate 12 min walk
    • FIRGROVE PUBLIC SCHOOL English Public 13 min walk
    • THE AMBASSADORS OF GOD ACADEMY Private 14 min walk

    Being near a school does not mean the lot is in its catchment; check with the board.

    2021 Census

    FigureBlack CreekMedian neighbourhood
    Median household income (2020)$65,000$84,500
    Households that own their home33%54%
    Population (2021)21,14516,813
    Homes built in 1960 or before19%29%
    Homes needing major repairs14%7%

    Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

    Police-reported crime, 2025

    Per 100,000 peopleBlack CreekCity median
    Assault1204.2636.3
    Robbery51.669.5
    Shootings34.410.5
    Auto theft258192.6
    Theft over $5,00047.346.1
    Break and enter94.6172.8
    Theft from vehicles167.7188.1

    Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

    Something here not right?

    Sources

    • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
    • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
    • Development applications: Rezoning, site plan, subdivision and condominium applications.
    • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
    • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
    • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
    • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
    • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
    • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
    • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
    • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
    • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
    • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
    • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
    • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
    • Address points: loaded Nov 22, 2026, published Nov 20, 2026
    • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
    • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
    • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
    • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
    • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
    • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
    • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
    • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
    • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
    • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
    • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
    • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
    • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
    • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
    • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
    • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
    • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
    • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
    • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
    • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
    • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
    • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
    • Active building permits: loaded Nov 28, 2026, published Nov 27, 2026
    • Cleared building permits: loaded Nov 28, 2026, published Nov 27, 2026
    • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
    • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
    • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
    • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
    • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
    • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
    • School locations: loaded Oct 14, 2026, published May 27, 2026
    • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
    • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
    • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
    • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
    • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
    • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
    • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
    • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
    • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

    Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

    Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

    Flag an error

    What is not right?

    The problem

    The records come from the City's open data; we check each flag against them. Your email is used only to answer this.