HousePrecheckCheck an address

40 Murray StToronto · zoning, lot size and permit records

≈ 82.7 × 119.9 m7,372 m²on Murray St

Not a home

A commercial or mixed-use building

Its main building is large, outside the citywide zoning by-law: shops, offices or a mixed-use building rather than one house. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Shops, offices or a mixed buildingCustomers, deliveries and evening activity; errands within a short walk.
  • Permits or applications open on this parcelRecent records on this lot: 26 168266 (Localized parking garage repairs, 2026); 24 254921 (Proposal to equip the existing elevators with new life safety devices, 2025); 24 252471 (THIS ALTERNATIVE SOLUTION WILL ADDRESS REMOVING THE FIRE HOSES IN THE EXISTING FIRE HOS..., 2024). Larger work can mean noise and trucks next door; read what each one is for.
  • 7 development applications open within 300 m, up to 64 storeysNew buildings may go up around here in the next years. More change nearby than at 99% of Toronto houses.
N50 m
≈ 82.7 m frontage≈ 119.9 m deepirregular lot, estimated

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • 5 building permits open, the oldest since 2019

    Needs a closer look

    Still open in the City's records: 24 138248 (Post-Tentioned cable repairs in localized areas of the garage, 2024, status Permit Issued); 23 103384 (Replace failed post-tensioned cables, install new vehicle traffic coating and localized..., 2023, status Permit Issued); 21 225090 (PROPOSED: Replace failed post-tensioned cables, replace expansion joint seals, install..., 2021, status Permit Issued); and 2 more.

    What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.

    How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)
  • Work or applications in progress

    Good to know

    Recent records on this lot: 26 168266 (Localized parking garage repairs, 2026); 24 254921 (Proposal to equip the existing elevators with new life safety devices, 2025); 24 252471 (THIS ALTERNATIVE SOLUTION WILL ADDRESS REMOVING THE FIRE HOSES IN THE EXISTING FIRE HOS..., 2024).

    What it means. The owner has planned or started work. Ask what it covers, whether it will be finished before closing, and who pays for what is left.

    How to confirm. Application details and decisions are in the City's Application Information Centre. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards); City of Toronto, Development Applications
  • 1 Committee of Adjustment file on this lot

    Good to know

    1 approved. B0131/00TO (The proposal also includes No. 60 Murray Street. The sites are located at the southwest..., 2000).

    What it means. Approved variances and consents stay with the property, including any conditions in the decision. They allow what was approved, not more.

    How to confirm. Decisions are in the Application Information Centre; older files are available from the Committee of Adjustment office. Details

    City of Toronto, Committee of Adjustment applications (2001 onwards)
  • 7 development applications open within 300 m

    Good to know

    7 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 64 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

17 records on file: more than at 100% of Toronto houses (median 0).

  • Building permit26 168266Permit Issued

    Localized parking garage repairs.

    Jun 25, 2026 · 40 MURRAY ST
  • Building permit24 254921Inspection

    Proposal to equip the existing elevators with new life safety devices

    Jan 14, 2025 · 40 MURRAY ST
  • Building permit24 252471Deficiency Notice Issued

    THIS ALTERNATIVE SOLUTION WILL ADDRESS REMOVING THE FIRE HOSES IN THE EXISTING FIRE HOSE CABINETS AND RETAINING THE EXISTING 65 MM STANDPIPE SYSTEM HOSE VALVE CONNECTIONS.

    Dec 20, 2024 · 40 MURRAY ST
  • Building permit24 138248Permit Issued

    Post-Tentioned cable repairs in localized areas of the garage.

    May 16, 2024 · 40 MURRAY ST
  • Building permit23 103384Permit Issued

    Replace failed post-tensioned cables, install new vehicle traffic coating and localized concrete repairs

    Feb 15, 2023 · 40 MURRAY ST
  • Building permit22 125817Closed

    Replacement of fire alarm control panel, all zoning and devices to remain

    May 17, 2022 · 40 MURRAY ST
  • Building permit21 225090Permit Issued

    PROPOSED: Replace failed post-tensioned cables, replace expansion joint seals, install new vehicle traffic coating and localized concrete repairs

    Nov 26, 2021 · 40 MURRAY ST
  • Building permit20 144171Inspection

    Proposal to replace failed post-tensioned cables, replace expansion joint seals, install new vehicle traffic coating and localized concrete repairs.

    May 29, 2020 · 40 MURRAY ST
Show 9 older records
  • Building permit18 233476Inspection

    Post tension tendon replacement level P3-P4 bay B, post-tension tendon drying and re-greasing for existing tendons to remain, concrete repairs levels P3-P4 bay B, expansion joint modifications levels P3-P4 bay B, corbel repair, bean repair, traffic topping, line painting, gutter repair, drain pipe repair.

    Jan 31, 2019 · 40 MURRAY ST
  • Building permit18 247417Closed

    In conjunction with a parking lot on the premises, proposal to erect and display one illuminated ground sign, displaying static copy, located on the east frontage of the property (Murray Street). The sign contains two sign faces, in a back to back orientation, each sign face measuring 0.91 metres vertically by 0.91 metres horizontally at a height of 3.65 metres.**** P ****

    Nov 20, 2018 · 40 MURRAY ST
  • Building permit16 165163Closed

    Proposal to repair existing parking garage - post tension tendon replacement (levels P3 Bay B&C & P4 Bay C), post-tension drying and re-greasing for existing tendons (levels P3 Bay B&C & P4 Bay C), concrete repairs (levels P3 Bay B&C & P4 Bay C), expansion joint modifications (levels P3 Bay B&C & P4 Bay C), remedial works for column H-12 including installation of supplementary steel column system, post-tension cable grouting & impregnaton and concrete repairs for 1 Lin-Tee Girder Level P3 Bay C.

    Jun 17, 2016 · 40 MURRAY ST
  • Building permit15 153286Closed

    Proposal to install a 2" backflow prevention device

    May 28, 2015 · 40 MURRAY ST
  • Building permit14 169884Closed

    Proposal to replace the Existing Tendons in P2 & P3

    Nov 12, 2014 · 40 MURRAY ST
  • Consent (lot split)B0131/00TOApproved with conditions

    The proposal also includes No. 60 Murray Street. The sites are located at the southwest corner of Murray Street and Orde Street. There is an existing office building at 60 Murray Street and an existing parking garage at 40 Murray Street. The applicant purposes to sell No. 60 Murray Street and retain 40 Murray Street. The lands at 60 Murray Street are shown as Parts 1,2,3,4,6 and 7, Parts 5 and 8 are the parking garage at 40 Murray Street and Parts 3,6 and 7 idenifiy an easement to be conveyed to HydroOne for existing underground electrical cables, all as shown on a Plan of Survey at the Office of the Committee of Adjustment.

    Nov 7, 2000 · 40 MURRAY ST
  • Zoning review00 012950 LTOClosed
    Aug 31, 2000 · 40 MURRAY ST
  • Zoning review00 171828 000Closed
    Jul 14, 2000 · 40 MURRAY ST
  • Zoning review83 025492 LTOClosed
    Jan 20, 1983 · 40 MURRAY ST

Check before you build

  • Zoning not in By-law 569-2013

    Needs a closer look

    This lot is not covered by the citywide zoning by-law's map. It is probably still governed by a former municipal by-law, which this tool does not read yet.

    Zoning By-law 569-2013

Lot facts

Area
7,372 m²
Frontage
82.7 mestimated, irregular lot
Depth
119.9 mestimated, irregular lot
Street
Murray St
Corner lot
No
Public lane
None
House footprint
5,931 m²roof up to 28.2 m
Back yard
31.6 mhouse to rear lot line
Side yards
1.4 m and 2.6 mhouse to side lot lines
Buildings on the lot
7house, garage, sheds
Max height
—
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • 1 City tree in front of this lot. The City's street tree inventory lists 1 tree at this address: ash, green (12 cm). Diameter is the trunk at breast height. Source

Around this lot

Minor variances approved
100%18 of 18 decisions
Garden suite permits
0
Laneway suite permits
3
Multiplex permits
8
Development applications
21

Within 300 m, last 10 years. 11 suite and multiplex permits: more than at 77% of Toronto houses (median 3). 18 variance decisions: no more than at most Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To construct a new two-storey detached ancillary building (containing one garden suite), with a cantilevered second storey in the rear yard. There will be a total of five residential dwelling units on this lot (four units within the main dwelling, and one unit within the ancillary building).

    23 ROSS ST · Apr 1, 2026 · 405 m away
  • Minor varianceApproved

    To alter the parking length standard for one residential parking space (Unit 11) on Parking Level 1 of the 32-storey mixed-use building, containing three levels of below grade parking.

    292 DUNDAS ST W · Mar 4, 2026 · 283 m away
  • Minor varianceApproved

    To alter the development standards (as approved under Site Specific Zoning By-law 588-2025) for a new 15-storey mixed-use building (East Block fronting Bay Street), by increasing the podium portions of the building heights, equipment height projections, and reducing the minimum height of the first storey. Also, the new 43-storey mixed-use building (West Block fronting Elizabeth Street) will be reducing the size of one parking space length. This is currently being reviewed under Site Plan Control (File Number 20 25 197844 STE 11 SA). There will be a total of 827 purpose-built rental units on this lot (617 residential dwelling units, and 210 affordable dwelling units).

    130 ELIZABETH ST · Jan 14, 2026 · 484 m away
  • Minor varianceApproved

    To alter the existing three-storey mixed-use building by converting the existing office space (Unit 1 located within the basement at the southern portion of the building) into medical office space with accessory uses.

    150 BEVERLEY ST · Nov 19, 2025 · 375 m away
  • Minor varianceApproved

    To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a complete third storey addition, and a new rear three-storey addition (with a basement walkout level). Also, to construct a rear exterior staircase that will access each level. There will be a total of 4 residential dwelling units on this lot. The existing rear two-storey ancillary building will be maintained and unaltered.

    28 D'ARCY ST · Feb 26, 2025 · 228 m away

Latest activity nearby

  • Zoning review

    Application On Hold

    522 UNIVERSITY AVE · Nov 24, 2026 · 215 m away
  • Building permit

    Proposal for interior fit-out of new office space in existing office space.

    700 UNIVERSITY AVE · Nov 23, 2026 · 223 m away
  • Building permit

    Proposed interior alteration of the exisitng CATH Lab room on floor 16 of the building and replacement of the existing equipment.

    600 UNIVERSITY AVE · Nov 19, 2026 · 107 m away
  • Building permitsecondary suite

    Revision 01: interior alterations and a 3 storey addition at rear yard. Proposed interior layout modification and 3 storey addition/extension at rear yard. --Party Wall Admin Permits- 2026 216781 BLD 00 SR

    221 BEVERLEY ST · Nov 12, 2026 · 298 m away
  • Building permit

    Interior renovation project to update architectural finishes in the fourth floor ambulatory corridor. Architectural new works involve new rubber sheet flooring, painting and installing ceiling tiles. Demolition scope involves removal of existing floor and wall finishes, ceiling tiles and lights.

    600 UNIVERSITY AVE · Nov 10, 2026 · 107 m away
  • Zoning review

    Not Started

    300 SIMCOE ST · Nov 6, 2026 · 153 m away
  • Building permit

    Interior fit-out of new office space to existing Group D occupancy on 16th floor.

    700 UNIVERSITY AVE · Nov 6, 2026 · 223 m away
  • Building permit

    Mechanical retrofit to improve building energy efficiency including working in various building mechanical rooms and roofs on the chilled water, heating water, and glycol piping networks. Some new equipment will be installed including a an air source heat pump, heat recovery chiller, and fan coil units.

    500 UNIVERSITY AVE · Nov 5, 2026 · 264 m away
  • Zoning review

    Not Started

    3 BALDWIN ST · Nov 3, 2026 · 122 m away
  • Building permit

    REV 01: Revisions to combination fire/smoke damper (FSD) system on Levels 9 and 10: FSD duct smoke detectors (factory-mounted/wired) connected to the fire alarm system on dedicated zones per floor(Mechanical MCN-05R1, Electrical ECN-08), and relocation of one ceiling access panel in Soiled Utility Room B.13A.28 (Architectural CCN-13). No change to use, occupancy or area of work.

    555 UNIVERSITY AVE · Oct 29, 2026 · 269 m away

Neighbourhood: Kensington-Chinatown

About the area around the lot, not the lot itself.

Nearest station
Queen's Park Station5 min walk
Nearest TTC stop
University Ave at Gerrard St West3 min walk
Nearest cycling route
University AveCycle Track, 3 min walk
Nearest traffic count
4,161 vehicles in 8 hMcCaul St / Baldwin St, 100 m away, Jun 9, 2008
Serious collisions within 500 m
62021–2026, killed or seriously injured: 0 fatal, 4 with pedestrians, 2 with cyclists
Parks
McCaul - Orde Parkette1 min walk
Gallery Park4 min walk
Julius Deutsch Park7 min walk

Schools within 1 km

  • ORDE STREET JR PUBLIC SCHOOL English Public 3 min walk
  • RONALD MCDONALD HOUSE Private 3 min walk
  • CORNERSTONE PREPARATORY SCHOOL - MAIN CAMPUS Private 4 min walk
  • HEYDON PARK SECONDARY SCHOOL English Public 5 min walk
  • OCAD UNIVERSITY - ROSALIE SHARP PAVILION University 5 min walk
  • OCAD UNIVERSITY - ANNEX BUILDING University 6 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureKensington-ChinatownMedian neighbourhood
Median household income (2020)$62,000$84,500
Households that own their home32%54%
Population (2021)18,12016,813
Homes built in 1960 or before26%29%
Homes needing major repairs8%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleKensington-ChinatownCity median
Assault2017.5636.3
Robbery19369.5
Shootings21.910.5
Auto theft118.4192.6
Theft over $5,000219.346.1
Break and enter443172.8
Theft from vehicles850.8188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
  • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.