HousePrecheckCheck an address

40 Lavery TrlToronto · zoning, lot size and permit records

Open space · OR≈ 106.6 × 173.4 m11,974 m²on Lavery Trl

Not a home

Lavery Trail Park

The City of Toronto's real estate inventory lists Lavery Trail Park here, on City land in City use. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Green space next doorShade, play and walks; busy parks also bring events and evening noise.
  • No development applications within 300 m in 10 yearsA quiet stretch for new building, by the City's records.
N50 m
≈ 106.6 m frontage≈ 173.4 m deepirregular lot, estimated

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

    Not in these records

    • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
    • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

    History of this lot

    No permits, applications or Committee of Adjustment files on this lot in the City's open records.

    Lot facts

    Area
    11,974 m²
    Frontage
    106.6 mestimated, irregular lot
    Depth
    173.4 mestimated, irregular lot
    Street
    Lavery Trl
    Corner lot
    No
    Public lane
    None
    Max height
    —
    Max lot coverage
    —
    • Highland Creek Community Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
    • Zone OR (Open Space Recreation). Chapter 90, section 90.30 of the by-law. Source

    Around this lot

    Minor variances approved
    75%3 of 4 decisions
    Garden suite permits
    0
    Laneway suite permits
    0
    Multiplex permits
    0
    Development applications
    0

    Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 4 variance decisions: no more than at most Toronto houses (median 19).

    Latest activity nearby

    • Building permitnew building, new house

      Revision 01: Changes to basement, ground, & second floor layouts. Proposal to construct a new 2 storey signle family dwelling and demolish the existing 2 storey single family dwelling

      816 MEADOWVALE RD · Nov 3, 2026 · 212 m away
    • Building permitsecondary suite

      Proposal for new second unit in basement.

      812 MEADOWVALE RD · Oct 30, 2026 · 217 m away
    • Building permitsecondary suite

      Proposal to legalize second suite in dwelling.

      14 LITTLEBOROUGH CRT · Oct 20, 2026 · 273 m away
    • Building permitsecondary suite

      Proposal for new second unit in basement.

      812 MEADOWVALE RD · Oct 14, 2026 · 217 m away
    • Building permitsecondary suite

      Proposal to construct a secondary unit and below grade entrance from rear yard including 3 proposed window.

      31 ORLEANS DR · Feb 20, 2026 · 212 m away
    • Building permitsecondary suite

      Drain - Proposal for interior alterations to create a second suite in the basement and new walk-out stairs

      17 LAVERY TRL · Feb 10, 2026 · 215 m away
    • Building permitsecondary suite

      Proposal for interior alterations to create a second suite in the basement and new walk-out stairs

      17 LAVERY TRL · Dec 29, 2025 · 215 m away
    • Building permitsecondary suite

      To construct a basement secondary unit to existing dwelling

      27 ORLEANS DR · Dec 12, 2025 · 203 m away
    • Building permitsecondary suite

      Proposing a basement apartment "ADU"/"ARU"

      27 ORLEANS DR · Nov 21, 2025 · 203 m away
    • Building permitdemolition

      Proposal to demolish existing 2 storey single family dwelling to construct a new 2 storey single family dwelling

      816 MEADOWVALE RD · Aug 5, 2025 · 212 m away

    Neighbourhood: Highland Creek

    About the area around the lot, not the lot itself.

    Nearest TTC stop
    Meadowvale Rd at Lavery Trail3 min walk
    Nearest cycling route
    Sheppard Ave EBike Lane, 14 min walk
    Nearest traffic count
    5,368 vehicles in 8 hMeadowvale Rd / Euclid Ave / Lavery Trl, 200 m away, Feb 15, 2022
    Serious collisions within 500 m
    12021–2026, killed or seriously injured: 0 fatal, 0 with pedestrians, 0 with cyclists
    Parks
    Lavery Trail Park1 min walk
    Bob Hunter Park4 min walk
    Ellesmere - Zaph Ravine7 min walk

    Schools within 1 km

    • MEADOWVALE PUBLIC SCHOOL English Public 3 min walk
    • ST DOMINIC SAVIO CATHOLIC ELEMENTARY SCHOOL English Separate 10 min walk
    • CHIEF DAN GEORGE PUBLIC SCHOOL English Public 10 min walk
    • JOHN G DIEFENBAKER PUBLIC SCHOOL English Public 15 min walk
    • ROUGE VALLEY PUBLIC SCHOOL English Public 16 min walk

    Being near a school does not mean the lot is in its catchment; check with the board.

    2021 Census

    FigureHighland CreekMedian neighbourhood
    Median household income (2020)$120,000$84,500
    Households that own their home86%54%
    Population (2021)12,62516,813
    Homes built in 1960 or before9%29%
    Homes needing major repairs3%7%

    Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

    Police-reported crime, 2025

    Per 100,000 peopleHighland CreekCity median
    Assault575.6636.3
    Robbery44.369.5
    Homicide7.45.3
    Shootings7.410.5
    Auto theft243.5192.6
    Theft over $5,00095.946.1
    Break and enter118.1172.8
    Theft from vehicles214188.1

    Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

    Something here not right?

    Sources

    • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
    • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
    • Development applications: Rezoning, site plan, subdivision and condominium applications.
    • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
    • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
    • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
    • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
    • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
    • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
    • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
    • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
    • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
    • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
    • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
    • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
    • Address points: loaded Nov 22, 2026, published Nov 20, 2026
    • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
    • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
    • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
    • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
    • Committee of Adjustment open applications: loaded Nov 28, 2026, published Nov 27, 2026
    • Committee of Adjustment decisions: loaded Nov 28, 2026, published Nov 27, 2026
    • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
    • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
    • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
    • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
    • Development applications: loaded Nov 28, 2026, published Nov 28, 2026
    • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
    • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
    • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
    • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
    • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
    • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
    • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigations: loaded Nov 28, 2026, published Nov 27, 2026
    • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
    • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
    • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
    • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
    • Active building permits: loaded Nov 28, 2026, published Nov 27, 2026
    • Cleared building permits: loaded Nov 28, 2026, published Nov 27, 2026
    • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
    • Preliminary zoning reviews: loaded Nov 28, 2026, published Nov 27, 2026
    • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
    • RentSafeTO evaluations: loaded Nov 28, 2026, published Nov 27, 2026
    • Multi-tenant house licences: loaded Nov 28, 2026, published Nov 27, 2026
    • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
    • School locations: loaded Oct 14, 2026, published May 27, 2026
    • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
    • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
    • Short-term rental registrations: loaded Nov 28, 2026, published Nov 27, 2026
    • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
    • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
    • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
    • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
    • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
    • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

    Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

    Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

    Flag an error

    What is not right?

    The problem

    The records come from the City's open data; we check each flag against them. Your email is used only to answer this.