HousePrecheckCheck an address

40 Eglinton SqToronto · zoning, lot size and permit records

Commercial residential · CR 0.1 (c0.1; r0.0) SS3 (x471)≈ 215.6 × 124.9 m19,653 m²on Pharmacy Ave

Not a home

A commercial or mixed-use building

Its main building is large, in a commercial zone: shops, offices or a mixed-use building rather than one house. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Shops, offices or a mixed buildingCustomers, deliveries and evening activity; errands within a short walk.
  • Permits or applications open on this parcelRecent records on this lot: 11 229847 (FS - Sprinkler Shop Drawing - Interior alterations for a new Tim Hortons restaurant, 2011); 21 233429 ESC 20 SB (Draft Plan of Subdivision application to create three development blocks, including one..., 2021); 21 233428 ESC 20 SA (Site Plan Control application to permit 3 buildings on the subject lands (a 13-storey m..., 2021); and 1 more. Larger work can mean noise and trucks next door; read what each one is for.
  • 17 development applications open within 300 m, up to 50 storeysNew buildings may go up around here in the next years. More change nearby than at 99% of Toronto houses.
  • Major Transit Station Area: O'ConnorThe City plans more homes around the station: good for transit, and more building over time.
N50 m
≈ 215.6 m frontage≈ 124.9 m deepirregular lot, estimated

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • 3 building permits open, the oldest since 2011

    Needs a closer look

    Still open in the City's records: 20 133813 (Proposal of the installation of a new security gate connected to fire alarm panel and t..., 2020, status Permit Issued); 13 124632 (interior alterations to electrical room in Metro store, 2013, status Work Not Started); 11 255863 (Structural permit for a new rooftop mechanical unit. Main reference permit for interior..., 2011, status Permit Issued).

    What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.

    How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)
  • Work or applications in progress

    Good to know

    Recent records on this lot: 11 229847 (FS - Sprinkler Shop Drawing - Interior alterations for a new Tim Hortons restaurant, 2011); 21 233429 ESC 20 SB (Draft Plan of Subdivision application to create three development blocks, including one..., 2021); 21 233428 ESC 20 SA (Site Plan Control application to permit 3 buildings on the subject lands (a 13-storey m..., 2021); and 1 more.

    What it means. The owner has planned or started work. Ask what it covers, whether it will be finished before closing, and who pays for what is left.

    How to confirm. Application details and decisions are in the City's Application Information Centre. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards); City of Toronto, Development Applications
  • 17 development applications open within 300 m

    Good to know

    17 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 50 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

14 records on file: more than at 100% of Toronto houses (median 0).

  • Zoning review21 233427 POZClosed
    Dec 1, 2021 · 40 EGLINTON SQ
  • Development application21 233429 ESC 20 SBUnder Review

    Draft Plan of Subdivision application to create three development blocks, including one block for public parkland purposes, and new streets.

    Nov 2, 2021 · 40 EGLINTON SQ · City file
  • Development application21 233428 ESC 20 SAUnder Review

    Site Plan Control application to permit 3 buildings on the subject lands (a 13-storey mixed use building; a 25-storey residential buildings; and, a 30-storey residential buildings) with three levels of underground parking. The development has a total gross floor area of 74,427m² (Retail GFA: 3,752m²; and, Residential GFA: 70,675m²).

    Nov 2, 2021 · 40 EGLINTON SQ · City file
  • Development application21 233427 ESC 20 OZUnder Review

    Official Plan and Zoning By-law Amendment application to add a Site and Area Specific Policy for 40 Eglinton Square to permit a mixed-use development with building heights that range from 13 to 30 storeys and 892 residential units. A total gross floor area of 74, 427 m2 (70, 675 m2 for residential uses and 3,752 m2 for retail uses) and an FSI of 3.79 times the area of the site are proposed.

    Nov 2, 2021 · 40 EGLINTON SQ · City file
  • Building permit20 133813Permit Issued

    Proposal of the installation of a new security gate connected to fire alarm panel and the addition of new railing of existing retail store. METRO

    Apr 22, 2020 · 40 EGLINTON SQ
  • Zoning review19 176755 LTOClosed
    Jun 24, 2019 · 40 EGLINTON SQ
  • Building permit13 124632Work Not Started

    interior alterations to electrical room in Metro store

    Feb 27, 2013 · 40 EGLINTON SQ
  • Building permit11 255863Permit Issued

    Structural permit for a new rooftop mechanical unit. Main reference permit for interior alterations/mechanical see 11-229847.

    Oct 21, 2011 · 40 EGLINTON SQ
Show 6 older records
  • Building permit11 229847Application On Hold

    FS - Sprinkler Shop Drawing - Interior alterations for a new Tim Hortons restaurant

    Aug 11, 2011 · 40 EGLINTON SQ
  • Zoning review11 179600 ZPUClosed
    Apr 20, 2011 · 40 EGLINTON SQ
  • Zoning review06 137483 LTOClosed
    May 19, 2006 · 40 EGLINTON SQ
  • Building permit05 181661Closed

    INSTALL FIRE SUPRESSION SYSTEM IN DOMINION STORE AT EXISTING KITCHEN EXHAUST

    Sep 21, 2005 · 40 EGLINTON SQ
  • Building permit05 132396Closed

    INTERIOR ALTERATIONS TO DOMINION STORE IN FOOD PREP AREA PLUS KITCHEN EXHAUST

    Jul 13, 2005 · 40 EGLINTON SQ
  • Zoning review03 200558 LTOClosed
    Dec 15, 2003 · 40 EGLINTON SQ

Check before you build

  • Site-specific exception 900.11.10(471)

    Needs a closer look

    4 site-specific rules and 4 older by-laws that still prevail apply to this lot. They can override the standard rules on this page.

    Zoning By-law 569-2013, Chapter 900
Exception 900.11.10(471)Applies

These parts of the exception apply to this lot's address.

  1. Rule A

    The minimum building setback from a lot line that abuts a street is: (i) 3.0 metres from a lot line abutting Victoria Park Ave., Eglinton Ave. E., Eglinton Square and Pharmacy Ave.; and (ii) 9.0 metres from a lot line abutting any other street not listed in (i)

  2. Rule B

    despite the permitted maximum floor space index of all land uses on the lot , and the maximum floor space index value associated with the letter 'c' on the zoning by-law Map, the permitted maximum gross floor area , not including the area of enclosed walkways utilized only for walkway access purposes to adjoining stores or for landscaping purposes, mezzanine storage rooms, loading docks, public washrooms accessible from the public walkway system, and the walkways providing access to utility rooms and loading docks, is 51,100 square metres

  3. Rule C

    The maximum height of an above ground parking structure is 20.0 metres

  4. Rule D

    Parking spaces must be provided at the rate of: (i) a minimum of 4.3 parking spaces per 100 square metres of gross floor area for the first 31,870 square metres of gross floor area on the lot ; and (ii) a minimum of 5.7 parking spaces per 100 square metres of gross floor area for gross floor area in excess of 31,870 square metres on the lot . Prevailing By-laws and Prevailing Sections: (None Apply)

  5. Older by-law A

    The minimum building setback from a lot line that abuts a street is: (i) 3.0 metres from a lot line abutting Victoria Park Ave., Eglinton Ave. E., Eglinton Square and Pharmacy Ave.; and (ii) 9.0 metres from a lot line abutting any other street not listed in (i)

  6. Older by-law B

    despite the permitted maximum floor space index of all land uses on the lot , and the maximum floor space index value associated with the letter 'c' on the zoning by-law Map, the permitted maximum gross floor area , not including the area of enclosed walkways utilized only for walkway access purposes to adjoining stores or for landscaping purposes, mezzanine storage rooms, loading docks, public washrooms accessible from the public walkway system, and the walkways providing access to utility rooms and loading docks, is 51,100 square metres

  7. Older by-law C

    The maximum height of an above ground parking structure is 20.0 metres

  8. Older by-law D

    Parking spaces must be provided at the rate of: (i) a minimum of 4.3 parking spaces per 100 square metres of gross floor area for the first 31,870 square metres of gross floor area on the lot ; and (ii) a minimum of 5.7 parking spaces per 100 square metres of gross floor area for gross floor area in excess of 31,870 square metres on the lot . Prevailing By-laws and Prevailing Sections: (None Apply)

By-law 569-2013, Chapter 900

Lot facts

Area
19,653 m²
Frontage
215.6 mestimated, irregular lot
Depth
124.9 mestimated, irregular lot
Street
Pharmacy Ave
Corner lot
No
Public lane
None
House footprint
2,943 m²roof up to 18.8 m
Back yard
0 mhouse to rear lot line
Side yards
65.7 m and 73.6 mhouse to side lot lines
Buildings on the lot
2house, garage, sheds
Max height
11 m
Max lot coverage
33%

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • Major Transit Station Area: O'Connor. The lot is inside the O'Connor Major Transit Station Area approved by the Province (Site and Area Specific Policy 665). Source
  • Golden Mile Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
  • Zone CR 0.1 (c0.1; r0.0) SS3 (x471) (Commercial Residential). Chapter 40, section 40.10 of the by-law. Source

Around this lot

Minor variances approved
100%5 of 5 decisions
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
0
Development applications
19

Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 5 variance decisions: no more than at most Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To alter the development standards for the 32-storey mixed use building (F1) by altering the by-law language for gross construction area, setback, step back or separation distance encroachment and location of long term bicycle parking spaces.

    1880-1890 EGLINTON AVE E · Jun 4, 2025 · 146 m away

Latest activity nearby

  • Building permit

    One wall sign***TIM HORTON***

    1896 EGLINTON AVE E · Nov 17, 2026 · 226 m away
  • Building permit

    Proposal to replace railing in response to municipal order.

    19 ENGELHART CRES · Nov 16, 2026 · 293 m away
  • Building permit

    Proposal to replace railing in response to municipal order.

    23 ENGELHART CRES · Nov 16, 2026 · 259 m away
  • Building permit

    Interior demolition of 2 storey former HBC building to shell condition, make safe electrical and mechanical systems in preparation for next phase.

    1 EGLINTON SQ · Nov 12, 2026 · 278 m away
  • Building permit

    Change the location and the size of the sign-A from the wall to the structural Canopy.*****AFIYET SHAWARMA *****

    1880-1890 EGLINTON AVE E · Nov 9, 2026 · 146 m away
  • Building permit

    Proposal for interior and exterior alterations to an existing Tim Horton's

    1896 EGLINTON AVE E · Nov 2, 2026 · 226 m away
  • Zoning review

    Closed

    70 EGLINTON SQ · Sep 23, 2026 · 233 m away
  • Building permit

    interior renovation

    1880-1890 EGLINTON AVE E · Jul 16, 2026 · 146 m away
  • Building permit

    Proposed interior alterations to an optical store. Scope includes demolition of existing partition walls and addition of new partition walls for an optical retailer with an on-site optometrist.

    1 EGLINTON SQ · Jul 8, 2026 · 278 m away
  • Building permit

    2 Wall Signs*****AFIYET SHAWARMA *****

    1880-1890 EGLINTON AVE E · Jun 1, 2026 · 146 m away

Neighbourhood: Clairlea-Birchmount

About the area around the lot, not the lot itself.

Nearest station
Pharmacy Station3 min walk
Nearest TTC stop
Eglinton Ave East at Pharmacy Ave2 min walk
Nearest cycling route
Eglinton Ave EBike Lane, 2 min walk
Nearest traffic count
14,528 vehicles in 14 hPharmacy Ave: Alvinston Rd - Eglinton Ave E, 90 m away, Oct 26, 2025
Serious collisions within 500 m
32021–2026, killed or seriously injured: 0 fatal, 3 with pedestrians, 0 with cyclists
Parks
Victoria Park - Eglinton Parkette3 min walk
Craigton Court Tot Lot7 min walk
Ashtonbee Reservoir Park7 min walk

Schools within 1 km

  • CLAIRLEA PUBLIC SCHOOL English Public 15 min walk
  • CENTENNIAL COLLEGE SCHOOL - ASHTONBEE CAMPUS College 16 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureClairlea-BirchmountMedian neighbourhood
Median household income (2020)$90,000$84,500
Households that own their home64%54%
Population (2021)26,84016,813
Homes built in 1960 or before39%29%
Homes needing major repairs6%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleClairlea-BirchmountCity median
Assault1303.8636.3
Robbery4969.5
Shootings9.810.5
Auto theft287.6192.6
Theft over $5,0008546.1
Break and enter189.5172.8
Theft from vehicles290.8188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 28, 2026, published Nov 28, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 28, 2026, published Nov 27, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 28, 2026, published Nov 27, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 28, 2026, published Nov 27, 2026
  • Multi-tenant house licences: loaded Nov 28, 2026, published Nov 27, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 28, 2026, published Nov 27, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.